Presentation is loading. Please wait.

Presentation is loading. Please wait.

DTC Spring Kick-Off 2015-2016 August 20th 2015.

Similar presentations


Presentation on theme: "DTC Spring Kick-Off 2015-2016 August 20th 2015."— Presentation transcript:

1 DTC Spring Kick-Off August 20th 2015

2 Introductions CDE - Collin Bonner- Bonner_C@cde.state.co.us
Technology Specialist  Assessment Unit of CDE. Pearson - Brian Martens- Senior Project Manager - Online & Technology Implementation at Pearson.

3 Assessments Assessment Grade Tentative Windows ACCESS for ELLs®
Reading, Writing, Speaking and Listening K-12 January 11 - February 12, 2016 CMAS and CoAlt: Science and Social Studies* 4, 5, 7, 8, HS April 11 - April 29, 2016 CMAS: ELA and Math (PARCC) 3-9 April 11 - April 29, 2016** CoAlt: ELA and Math (DLM) 3-10 Aligned to CMAS: ELA and Math schedule Preparatory Exam Grade 10 10 TBD College Entrance Exam Grade 11 11 Sampling :Talking with districts about sampling plans for 4 and 7 social studies HS SS The three year sampling plan for high school social studies includes zero percent of schools selected to participate in , about 50 percent of schools selected to participate in and about 50 percent of schools selected to participate in These new exams will go through a competitive procurement process Grade 10: Must be aligned to the Colorado Academic Standards and the 11th grade college entrance exam Both the 10th grade assessment and the college entrance exam will go through a competitive procurement process *Social Studies will be on a sampling basis. **Optional extended window options for online testing.

4 Online Assessments ACCESS for ELLs® CMAS CoAlt CoAlt DLM
Online test option for districts this year CMAS Science and social studies Social studies assessments will be administered on a sampling basis to one‐third of the schools each year. PARCC English language arts and PARCC math Including Colorado Spanish Language Arts CoAlt science and social studies CoAlt DLM English language arts and math CoAlt DLM system is not scheduled to open until March 16th

5 Assessment Choice Fulfill new district policy requirements of HB Adopt and implement a policy by which the LEP decides whether to request the paper form of the state assessments for its students Adopt and implement a written policy and procedure by which a student’s parent may excuse the student from participating in one or more of the state assessments Distribute to parents and post on LEP’s website written information regarding assessments, including an assessment calendar Determine mode of testing (computer or paper) for each school and each subject If testing online, determine if technology capacity requires an extended window for ELA and math (4, 5, or 6 weeks)

6 Spring Assessment Schedule
CMAS: science, social studies, ELA and math including CoAlt 3 weeks   April 11th through April 29th, 2016 4 weeks additional week for ELA and math April 4th  ‐ April 29th, 2016 5 weeks additional weeks for ELA and math March 28th  ‐ April 29th , 2016 or March 21st  ‐ March 29th, 2016 and April 4th ‐ April 29th, 2016. 6 weeks March 14th ‐ April 29th, 2016 with one week of spring break in the middle CoAlt DLM system is not scheduled to open until March 16th All social studies and science tests must be scheduled and completed between April 11th and April 29th, but districts needing more time to complete their ELA and math testing due to device numbers (i.e., the number of computers available will require multiple groups for each test unit) may begin testing those content areas earlier. The maximum test window will be six weeks. Six weeks will allow schools needing three groups per CMAS session to complete testing.  

7 Supporting 3 Platforms

8 Online Assessment Platforms
Test Engine SIS Notes ACCESS for ELLs® Reading, Writing, Speaking and Listening WIDA Assessment Management System (WIDA AMS) Caching server available. Clients for Windows, Linux, Mac OSX, Chromebooks, iPads, and Android. CMAS and CoAlt: Science and Social Studies Installable apps for desktop OS in TN v8.4 to reduce reliance on Java. Apps for Chromebooks , Androids, and iPads. CMAS-ELA and Mathematics (PARCC ) Dynamic Learning Maps (DLM) CoAlt Educator Portal KITE client install for each device and individually configured to point to caching server.

9 Pearson’s TestNav

10 Device dependent administration

11 TestNav Components Component Current Software Version
Next Release date Recommendations Proctor Caching v TBD Upgrade proctor caching Servers to this version. TestNav v8.3 v8.4 late September or early October v8.5 anticipated December Wait until TN 8.5 for spring testing then run full testing. iPad App v1.3.6 Run Quick Verification Chromebook App V1.3.64 Installable TestNav v8.4 September 15, 2015

12 Quick Verification Start a Browser or App.
Select a URL: or Enter the following credentials in the login screen: Username: username Password: password Choose "Sign In". Click the "Start Test Now" button. If you see the "Congratulations" screen then your computer is correctly configured to run TestNav.

13 2015-2016 Timeline Task Description Date Update proctor Cache Device
Software Install Now CMAS (ELA, Math, Science, Social Studies) SR/PNP upload Student Data Upload January Site Readiness Pearson TestNav Technical Training Webinar PAN Training Access Create practice tests. Tests proctor cache device, TN config, student devices, and capacity. Does not use SRF files in PAN training. TBD TestNav Configuration in PAN Points sessions to proctor caching’s IP address Device Student Preparation Install Client or Prepare Test Components and run Quick Verification September 15, 2015. Cache Test Content Decide if Cashing by Test or by Session March * Waiting to hear if 1 TN config can be used for all.

14 TestNav Questions?

15 Data Recognition Corporation’s ACCESS for ELLs 2.0

16

17 ACCESS for ELLs 2.0 Components
Current Software Version Next Release date Recommendations WIDA Assessment Management System (WIDA AMS) NA Available September 4th 2015 Look for training modules to be released September 4th Testing Site Manager (TSM) Caching Software v7.0.1 Available October 5th 2015 Register for WIDA Technology Coordinator Overview Webinar Wednesday October 7th, :00pm CT or Friday October 9th, 2015, 10:00am CT INSIGHT Test Engine v6.0

18 2015-2016 Timeline Release Date
WIDA Assessment Management System (WIDA AMS) available. WIDA Assessment Management System - Account Setup module WIDA Assessment Management System Documents Download module. September 4th 2015 Technology User Guide released. Testing Site Manager (TSM) module available for download from DRC. INSIGHT Test Engine module released and available for download from DRC. October 5th 2015 WIDA Technology Coordinator Overview Webinar October 7th & 9th, 2015 ACCESS for ELLs 2.0 operational testing window January 11 - February 12, 2016

19 INSIGHT Questions? 19

20 Dynamic Learning Maps’ KITE System

21

22 Kite Components Component Current Software Version Next Release date
Recommendations KITE Local Caching Server 2/10/2015 TBD Not supporting 32 bit version. KITE Client NA September 10th Automatic process

23 Schedule Computer-based assessment Individually administered
Scores are entered into Educator Portal (KITE) Same window as CMAS (PARCC) ELA and Math If using the 3 week window (paper-based or online), have the same 3 week window for DLM. If using the 6 week extended window for the general online assessments, have the same 6 week window for DLM. 23

24 KITE Events DLM Technical Liaison Webinar
Tuesday, September 15, 2015 at 1:00 pm MST Wednesday, September 23, :00 am MST URL: Audio Connection: Dial (877) Enter Conference Code at prompt: # CDE Training will be offered in February. Network Preparation. Dropped support for Windows XP operating system for running KITE Client Dropped support for 32-bit version of the Local Caching Server Client update is performed when the client is started.

25 KITE Questions? 25

26 CDE Support Checklists – High Level
Network Preparation Proctor Caching Device Preparation Testing the Assessment Environment Post Test Tasks Technical Training Slide Decks – Detailed Training Follow the structure of checklists Detailed instructions with links to documentation Webinars Trainings - Cover Technical Training Slide Decks Q & A Sessions to answer specific questions Check for details.

27 Thanks for Your Time


Download ppt "DTC Spring Kick-Off 2015-2016 August 20th 2015."

Similar presentations


Ads by Google