Download presentation
Presentation is loading. Please wait.
Published byMarilyn Merritt Modified over 6 years ago
1
January 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted: [ 16 November, 2004] Source: [Robert Poor, Marco Naeve] Company [Ember Corporation, Eaton Corporation] Address [313 Congress Street, Boston, MA, USA] Voice:[Add telephone number], FAX: [Add FAX number], Re: [IEEE b] Abstract: [This document contains the schedule and timeline for the work of the 4b task group] Purpose: [For informational purposes.] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.
2
IEEE 802.15.4b Timeline January 2005
Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.
3
doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> January 2005 Schedule [4] Present proposals at the Jul04 plenary and Sep04 vote on the individual contributions that will comprise the draft at the Sep04 meeting. [5] Draft complete by Jan05 Interim. [6] At Jan05 meeting, we move the draft be put to letter ballot. [7] 40 day letter ballot period between Jan05 and Mar05 meetings. [8] Our primary Mar05 meeting activity is comment resolution [9] Put draft into recirc ballot at Mar05 meeting. Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp. <author>, <company>
4
January 2005 Schedule [10] 15 day recirculation ballot period between Mar05 and May05 [11] Comment resolution during May05 meeting. [11a] Put draft into recirc ballot at May05 meeting. [11b] 15 day recirculation ballot period between May05 and Jul05 [11c] Comment resolution during Jul05 meeting. [12] At Jul05 meeting, seek approval from ExCom to go to sponsor ballot. Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.
5
Schedule [13] 40 day sponsor ballot between Jul05 and Sep05 meetings
January 2005 Schedule [13] 40 day sponsor ballot between Jul05 and Sep05 meetings [14] Comment resolution during Sep05 meeting [15] 15 day recirculation ballot between Sep05 and Nov05 meetings [16] At Nov05 meeting, seek approval from ExCom to submit draft to RevCom. [17] RevCom meets in March. Agenda deadline 2/10/06. [18] At Mar06 meeting, rejoice and drink champagne. Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.
6
Timeline Graph January 2005
Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.