Presentation is loading. Please wait.

Presentation is loading. Please wait.

Progress Report Chester Liu 2014/03/18.

Similar presentations


Presentation on theme: "Progress Report Chester Liu 2014/03/18."— Presentation transcript:

1 Progress Report Chester Liu 2014/03/18

2 01/13 Demonstration Platform
H264-intra encoder Fix a pipeline bug Add pipeline stages which can be stalled on multiple paths to improve timing Forget to add on one path (in ec_code_mb_header.v) A pulse is dropped if stall signal is asserted at the same cycle WZ encoder Both key and WZ use the same input frame Output only RLC, no CAVLC and CC Because of buggy FIFO controller Controller hang if output cannot be stored immediately

3 Revised Encoder Architecture

4 Intel Siskiyou Peak CPU
Simulation manual Build tool chain and setup simulation environment Run simulation using the Dhrystone benchmark provided How to modify C/assembly code and run simulation Change hardware operation (change XOR to NOT) Dump waveform control $fsdbDumpvars(“+mda”) Dump multidimensional arrays in addition to normal signals $fsdbDumpvars(“+all”) Dump all signals (such as SystemVerilog structures) in addition to +mda

5 Schedule Current progress Todo EEPROM controller (and model) done
UART debug interface (and model) done SPI Wi-Fi controller 90% Successfully connect to AP Successfully open TCP socket Debugging send TCP data Todo Fix WZ encoder FIFO bug Integrate all modules (4/M)


Download ppt "Progress Report Chester Liu 2014/03/18."

Similar presentations


Ads by Google