Presentation is loading. Please wait.

Presentation is loading. Please wait.

VELO readout On detector electronics Off detector electronics to DAQ

Similar presentations


Presentation on theme: "VELO readout On detector electronics Off detector electronics to DAQ"— Presentation transcript:

1 VELO readout On detector electronics Off detector electronics to DAQ
signals transported from the detector to a radiation safe area by ~60m twisted pairs cables to DAQ digitization experiment "clock" and controls High and low voltages A. Bay electronics

2 Front end chip: Beetle chip
Processing of 128 channels Has a "pipeline" to store the charge of 160 events derandomizer sensor LHCb clock multiplexer 32 to 1 Level 0 trigger decision output ch 0 ch 1 ch 2 ch 3 four outputs x 32 = 128 channels A. Bay electronics

3 Signal on one Beetle output
header 32 channels 4 (32+4)x25= 900 ns => 1.11 MHz max of L0 trigger in average 25 ns hit channel several events superposed ! ADC sample here header A. Bay electronics

4 VELO analogue data transmission
The cable introduces attenuation and has finite bandwidth: frequency compensation is done in the line driver board (2 poles) cable response and Spice parametrization line driver spice data A. Bay electronics

5 VELO analogue interface
complete system The model data study of "residuals" for different frequency compensation networks SPICE residual for a tuned board is ~2-3% A. Bay electronics

6 Optical transmission Digitization done close to the detector. Data transported by optical fibre to counting house. A. Bay electronics

7 VELO Repeater bord line driver board output to 60 m line input
from VELO hybrids power regulators digital control A. Bay electronics

8 TELL1 30Gbit/s input data rate 4xGBit Ethernet L1T and HLT
A. Bay electronics

9 LHCb common readout board (TELL1)
Pre-processor FPGA L1 buffer (58 ms, 58 kevts) ~350 boards being built Optical or analog interfaces Credit-card PC Experiment control system clock 1 MHz from FE electronics Optical or analog interfaces CPU farm (~1600) Gigabit ethernet interface HLT “yes” storage 2 kHz Sync & link FPGA A. Bay electronics

10 Analog-Rx Optical-Rx A. Bay electronics

11 TTC fibre (clock and fast signals)
TELL1 boards under test Input signals on the front pannels Experiment Control ethernet cable TTC fibre (clock and fast signals) Data output to the computer farm A. Bay electronics

12 Situation 17 TELL1 have been built and fully tested.
Now production of 30 more boards: 10 already built and are in Lausanne for testing (boundary scan already done by Barco) 20 more are ready to be mounted by Barco but waiting for the delivery of a component (DC-DC converter) 320 more boards to be built in 2006. VELO: boards for full readout of 4 hybrids have been built and are now under test. Need to tune the line driver gain and frequency response with the new cable (a cable sample should be at CERN already). VELO foresees to do a 1/4 of system test during Summer In principle 1/4 of the repeaters, etc., should be ready by then... CAEN low voltage power sup. under test at CERN (~OK so far). A. Bay electronics


Download ppt "VELO readout On detector electronics Off detector electronics to DAQ"

Similar presentations


Ads by Google