Presentation is loading. Please wait.

Presentation is loading. Please wait.

SB 1 and Capital Program Update

Similar presentations


Presentation on theme: "SB 1 and Capital Program Update"— Presentation transcript:

1 SB 1 and Capital Program Update
Kelly Lamare, PE, PMP Chief, Office of Program Management Division of Program/Project Management Caltrans – District 7 Wednesday, June 13, 2018

2 SB1 Overview Senate Bill 1 (Road Repair and Accountability Act of 2017, Beall and Frazier) is the landmark transportation funding package passed by the Legislature on April 6, 2017 and signed into law by Governor Brown on April 28, This vital transportation funding program represents the largest state commitment to transportation in more than 40 years. SB1 invests $5.4 billion annually over the next decade to fix California’s transportation system; revenues split equally between state and local transportation priorities For Fiscal Years 2022/23 – 2026/27, Caltrans District 7 expects to receive $2.2 billion ($440 million annually) from SB1 SHOPP funding, with $1.97 billion projected for Los Angeles County, and $227 million for Ventura County Will address a backlog of repairs and upgrades, while ensuring a cleaner and more sustainable travel network for the future

3 D 7 – Los Angeles and Ventura Counties
YouTube link to SB1 video shown during the presentation D 7 – Los Angeles and Ventura Counties

4 SB1 Funding the Gap SB1

5 Key Goals of Senate Bill 1
Make significant new investments in our transportation infrastructure Invest in high-priority goods movement projects Ensure strong accountability in delivering vital infrastructure projects Provide consistent constitutionally protected annual funding levels

6 Accountability and Transparency
Assembly Constitutional Amendment No. 5 (ACA 5) SB1 funds will be protected under ACA 5 which safeguards new dollars for transportation use only Inspector General SB1 created the Independent Office of Audits and Investigations, including an Inspector General, appointed by the Governor, who will serve as the director of the Audits and Investigations Office California Transportation Commission Oversight SB1 empowers the California Transportation Commission (CTC) to hold state and local government accountable for making the transportation improvements they commit to delivering

7 Transportation Asset Management Program (TAMP)
SB1 codified the Commission-adopted performance measures and targets for the four primary Transportation Asset Management Program (TAMP) “fix-it-first” asset classes: pavement, bridges, culverts, and transportation management system (TMS) elements. The performance targets included in SB1 direct that over the next ten years not less than: 98% of pavement on the state highway system be in good or fair condition 90% of culverts be in good or fair condition 90% of TMS units be in good condition An additional 500 bridges be fixed Transportation Asset Management Program (TAMP)

8 State Highway Operation and Protection Program (SHOPP) – D7 Programmed Projects
Of 230 programmed SHOPP projects valued at over $3.6 billion, the following 34 projects will be receiving approximately $1 billion of SB1 funding: 12 Highway Maintenance (HM) projects ($43 million) 6 SHOPP Bridge Rehabilitation projects ($606 million) 2 SHOPP Drainage System Restoration projects ($14 million) 8 SHOPP TMS Upgrade projects ($129 million) 6 SHOPP Roadway Rehabilitation projects ($360 million)

9 State Highway Operation and Protection Program (SHOPP) – D7 Future Projects
Of over 230 future SHOPP projects valued at over $3.7 billion, the following 129 projects are projected to receive SB1 funding totaling $2.2 billion ($440 million annually for fiscal years 2022/23 through 2026/27): 47 Bridge Rehabilitation projects ($435 million, or 20 %) 22 Drainage System Restoration projects ($100 million, or 4 %) 26 TMS Upgrade projects ($365 million, or 17 %) 34 Roadway Rehabilitation projects ($1.3 billion, or 59%)

10 Trade Corridor Enhancement Program
WHERE IS THE MONEY GOING? SB1 provides $300 million annually for projects related to routes and transportation infrastructure vital to California’s trade and freight economy 28 projects statewide valued at more than $4 billion were recommended for TCEP funding totaling $1.4 billion TCEP funds totaling approximately $542 million were recommended for the following 11 projects within District 7: Route 34 / Rice Avenue Grade Separation Project in Ventura County I-5 (Golden State Freeway) Chokepoint Relief Project in Los Angeles County Route 57/60 Confluence Project: Chokepoint Relief Program in Los Angeles County Southern California Rail Projects (6 of 8 projects) in Los Angeles County Route 605/91 Interchange Improvement: Gateway Cities Freight Crossroads Project in Los Angeles County Route 71 Expressway to Freeway Conversion Project in Los Angeles County Trade Corridor Enhancement Program

11 Solutions for Congested Corridors Program
WHERE IS THE MONEY GOING? Solutions for Congested Corridors Program SB1 provides $250 million annually for multimodal corridor plans that make performance improvements along the state’s busiest highways 9 projects statewide valued at more than $3.5 billion were recommended for SCCP funding exceeding $1 billion SCCP funds totaling approximately $150 million were recommended for the following project within District 7: The Airport Metro Connector 96th Street Transit Station Project In Los Angeles County - This $525.2 million project will create a multimodal transit station with a light rail station, transit station/terminal building, bus plaza, bicycle hub, pedestrian plaza, and passenger pick-up and drop-off.

12 Local Partnership Program
WHERE IS THE MONEY GOING? Local Partnership Program SB1 provides $200 million annually to fund road maintenance and rehabilitation, sound walls and other transportation improvement projects 27 projects statewide valued at more than $1.7 billion were recommended for Local Partnership funding exceeding $308 million Local Partnership funds totaling approximately $96 million were recommended for the following four projects within District 7: Vista Canyon Metrolink Station Project in Los Angeles County Claremont: Foothill Boulevard Master Plan Green Streets Improvements in Los Angeles County Metro Orange Line Bus Rapid Transit Improvements in Los Angeles County La Cañada Flintridge Soundwalls Project

13 District 7 Capital Program
A&E Contracts Look Ahead Report As of May 2018 District 7 Capital Program Proposed Contract Estimated Advertisement Date Status Term (Years) Estimated Amount Description of Work 07A4516 Planning 5 $ ,900,000 Design: PA&ED and PS&E for three (3) –Upgrade ADA Ramps 07A4518 $ ,700,000 Design: PA&ED and PS&E for one (1) – Project Specific Rehab-Project Specific 07A4501 $ ,000,000 Design: PA&ED and PS&E for five (5) – Project Specific: ; Safety Projects 07A4506 $ ,300,000 Design: PA&ED and PS&E for three (3) – Project Specific: BMP’s for Stormwater Mitigation Projects 07NEWE01-19 Aug-18 3 $ ,500,000 Environmental Generalist - Ventura County 07NEWE02-19 Sept-18 Environmental Generalist - LA County - Desert Area TOTAL $ 55,900,000

14 SBE, DBE, and DVBE For Active A&E Contracts in FY 2017/18
A&E Contract Goals SBE, DBE, and DVBE For Active A&E Contracts in FY 2017/18 SBE N/A DBE 15% (Federally Funded Contracts) DVBE 5% (State Funded Contracts) Accomplishments as of May 2018 SBE: firms participating of total 138 firms (60.14%) 35% of total expenditure for the life of current contracts to date ($11.74 mil of $33.84 mil) 29% of total FY 17/18 expenditure to date ($2.75 mil of $9.39 mil) DBE : firms participating of total 138 firms (45.65%) 17% of total expenditure for the life of current contracts to date ($5.59 mil of $33.84 mil) 16% of total FY 17/18 expenditure to date ($1.48 mil of $9.39 mil) DVBE: 4 firms participating of total 138 firms (2.90%) 3.1% of total expenditure for the life of current contracts to date ($1.05 mil of $33.84 mil) 5.0% of total FY 17/18 expenditure to date ($0.47 mil of $9.39 mil)

15 Current A&E Contracts As of May 2018
Contract No. Execution Expires Contract Amount Description of Work 07A4238 6/23/2017 12/31/2020 $3,000,000 Construction Claim 07A4358 3/2/2018 2/28/2021 $6,000,000 Construction Inspections and CPM (Ventura) 07A4077 10/10/2016 10/31/2019 $6,400,000 Construction Material Testing 07A3910 2/1/2016 12/31/2018 Construction Support, LA County East & West 07A3886 11/2/2015 $11,500,000 Construction Support, LA County North 07A3898 12/18/2015 $8,700,000 Construction Support, LA County South 07A4393 7/1/2018 10/31/2021 $15,000,000 Construction- Inspection and CPM, LA Country North 07A4430 Negotiation $12,000,000 Construction- Inspection and CPM, LA County South 07A3934 2/2/2016 2/28/2019 $956,394 Construction- Roadway Inspection - LA 10 07A3919 12/8/2015 $2,035,000 Construction- Roadway Inspection - LA 210 07A4127 3/10/2017 3/9/2022 $3,500,000 Design Contract for Project 07A4062 8/22/2016 8/24/2021 $5,000,000 Design North 07A4057 8/8/2016 8/7/2021 Design South 07A4045 7/28/2016 7/30/2019 Survey -South & East LA On-call 07A4016 8/29/2016 6/30/2019 $2,000,000 Survey - Northern LA & Ventura Co- On call 07A4180 6/15/2017 4/24/2020 $1,000,000 Survey Office Staff Augmentation 07A4408 Survey East 07A4445 Survey South 07A3454 1/1/2014 $1,500,000 Environmental- Ventura County 07A2452 6/30/2008 $639,664 Environmental I-405 HOV Wildlife Monitoring Project 07A4295 1/1/2018 12/31/2021 Environmental- LA County Central On-Call 07A3822 7/1/2015 Environmental- LA County Desert - On Call 07A4305 Environmental LA County South On-Call 07A3963 4/7/2016 $2,500,000 Hazardous Waste North Los Angeles and Ventura Coun 07A3966 4/5/2016 Hazardous Waste South Los Angeles 07A4187 5/30/2017 1/30/2021 $4,400,000 Operations- Traffic Contract 07A4370 4/2/2018 4/21/2021 Operations- Traffic Contract for Project Project Specific 07A4341 1/11/2018 1/21/2021 Planning 07A3845 7/31/2015 8/14/2018 $2,400,000 Program/Project Management Support Services Total $ $131,531,058

16 District 7 – Small Business Update
Small Business Update (May 2018) highlights include: District 7 – Small Business Update D7 is exceeding the 25% SB goal. Currently at 52.7% Close to meeting the District’s 5% DBVE goal. Currently at 4.7% Exceeding the District’s DBE goal for federally funded construction and A&E contracts by 1.06% and 4%, respectively Under the provisions of SB 1 and SB 103, Caltrans will: Aim to increase the participation of minority and women-owned businesses Enhance existing outreach, training, and mentorship programs for small and diverse businesses Collect data on the percentage of contracts received and report it to the Legislature Publish information about its contracting opportunities on a website, in minority newspapers and trade publications

17 Education – Myths and Facts
MYTH #1: SB 1 just means more of your transportation dollars can be siphoned off for other programs. FACT: Gas-tax funding from SB 1, the Road Repair and Accountability Act of 2017, is dedicated for transportation use only. In addition to the constitutional protections already in place, Proposition 69, if passed in June, would add another safeguard to ensure the new vehicle registration fees would be for transportation use only. Governor Brown appointed an inspector general in October to ensure funds are spent properly. The California Transportation Commission also has oversight to ensure appropriate spending. 

18 Education – Myths and Facts
MYTH #2: The state has plenty of money. They simply haven’t been spending it in the right place. FACT: There is not enough money for the upkeep of California’s transportation infrastructure. California’s roads are subject to supporting the highest number of drivers in the country, and the state has more lane miles to maintain than almost every other state. Prior to SB 1, California’s highways and local roads faced an estimated $137 billion in deferred maintenance. That is in large part because, prior to SB1, California hasn’t raised the gas tax (the primary source of funding for local and state roadways) in more than 20 years and the gas tax was not indexed for inflation. Inflation, combined with the fact that vehicles are using less gas and traveling further on each gallon, has significantly eroded the funds available for road maintenance. SB 1 will provide $5.4 billion annually for both highways and local roadways and, after 2020 will be indexed for inflation. This allows communities all around the state to address years of deferred maintenance, creating smoother roads and better commutes.

19 How can I find out more? RebuildingCA.ca.gov


Download ppt "SB 1 and Capital Program Update"

Similar presentations


Ads by Google