1 KEYNOTE STAGE SPONSOR

2 Lower Thames Crossing: Project Update
Highways UK Jeff Meerdink, Deputy Project Director

3 Lower Thames Crossing on 12 April 2017
"We are making the big decisions for Britain. The new Lower Thames Crossing, and other improvements in and around Dartford and Thurrock announced today, will further strengthen our economy while also creating thousands of jobs." Secretary of State for Transport Chris Grayling confirms the preferred route for the Lower Thames Crossing on 12 April 2017

4 We will be ambitious By supporting the longer term benefits, the scheme will… ECONOMIC Support sustainable local development and regional economic growth medium to long term Be affordable for Government and users Achieve value for money TRANSPORT Relieve the congested Dartford Crossing and approach roads and improve performance by providing free flowing north-south capacity Improve resilience of the Thames crossings and major road network Improve safety COMMUNITY & ENVIRONMENT Minimise adverse impacts on health and the environment

5 Infrastructure enabling growth

6 DP World (London Gateway Port)
A vision for growth Dunton Garden Village DP World (London Gateway Port) Lakeside Shopping Centre Amazon Fulfilment Centre Port of Tilbury and Tilbury2 The Bridge – Enterprise Zone (mixed use) Crossways Business Park Ebbsfleet Garden City London Resort Holdings Theme Park Bluewater Shopping Centre Eurotunnel Port of Dover Projections show between 2011 and 2021, almost 200,000 more households will live in SE LEP’s communities – or an average of 20,000 homes per annum.

7 Economic benefits Adds more than £8 billion to the UK economy
Creates more than 6,000 new long-term jobs Opens opportunities for investment and regeneration, supporting local businesses, national companies and international trade

8 Transport benefits Creating more than 70% additional capacity across the Thames east of London Relieves pressure and congestion on the existing crossing and approach roads Better overall road network performance, increasing traffic flow across the river Provides a safer, faster, more reliable road

9 Community benefits Scheme Benefits
Minimises impacts on local communities with least visual and noise impacts Connects communities and improves access to jobs, housing, leisure and retail facilities

10 Scheme evolution APRIL 2017: Preferred Route Announcement NOW

11 Lower Thames Crossing and the wider network

12 Positive reaction to our design update

13 Our delivery plans A supportive network of suppliers
Authenticity in relationships Collaboration across teams Innovation and technology advancements Sustainability Excellent design

14 Key Challenges The complexity of the scheme Delivering at pace
Meeting the needs of the communities affected by the scheme Funding and financing Integrating with the wider road network Realising the benefits

15 What happens next? PREFERRED ROUTE ANNOUNCEMENT STATUTORY CONSULTATION
APPLICATION PREPARATION: Environmental Impact Assessment Land Referencing Planning Statement PREFERRED ROUTE ANNOUNCEMENT STATUTORY CONSULTATION DCO APPLICATION April 2017 Mid 2018 2019 STUDIES: Environmental Traffic Modelling Ground Investigations DESIGN FINALISATION DESIGN DEVELOPMENT DCO GRANTED; START ON SITE OPENING 2027 CONTINUOUS ENGAGEMENT

16 This is not an isolated solution
Part of the biggest investment in roads in a generation £10 million to improve traffic flow around Dartford Crossing and studying ways to further tackle congestion Improvement work at M25 Junction 30 and consultation on improvements at A2 Bean/ Ebbsfleet junction Working with local highway authorities to identify further improvements