2 New COSMO Procedure COSMO General Meeting, Zürich September 2005

3 Background Feedback from WPC meeting: --> lack of man power --> lack of discipline Cooperation and (friendly) Competition between consortia needed

4 New Structure / working procedures
Definition LM Strategy (STC, Input by Science Advisory Committee, SAC). Horizon: 5 years. SAC = WP coordinators + SPM SAC suggests Themes for Projects  1-3 per WG  project outline (< 1 page) 1-3 per WG  SPM/STC defines form und content of outline (template)  SAC prioritises list.

5 New Structure / working procedures
STC chooses one-digit number of projects. Assigns PL PL formulates Project. Split up into tasks (incl. duration and expenses) COSMO Members: declare, which of the tasks they want to work on  this counts for the 2 FTE / year a member must offer  work that is not performed within the priority projects is welcome but does not count for the FTE/year

6 Attribution of Ressourcees
The two FTE contributions from each COSMO member will be devoted to: 1) Research and Development Priority Projects: 2) Management of Support

7 Time line Draft strategy end of August

8 Time line Draft strategy end of August
Collection of proposals SAC meeting (1/2 Sept ‘05)

9 Time line Draft strategy end of August
Collection of proposals SAC meeting (1/2 Sept ‘05) GM (WG parallel meet): fine tuning GM (Thursday night): priority list

10 Time line Draft strategy end of August
Collection of proposals SAC meeting (1/2 Sept ‘05) GM (WG parallel meet): fine tuning GM (Thursday night): priority list Selection of Projects GM, last day (STC)

11 Time line Draft strategy end of August
Collection of proposals SAC meeting (1/2 Sept ‘05) GM (WG parallel meet): fine tuning GM (Thursday night): priority list Selection of Projects GM, last day (STC) Detailed project plan November 1

12 Time line Draft strategy end of August
Collection of proposals SAC meeting (1/2 Sept ‘05) GM (WG parallel meet): fine tuning GM (Thursday night): priority list Selection of Projects GM, last day (STC) Detailed project plan November 1 Approval STC November 15 (written procedure)

13 Time line Draft strategy end of August
Collection of proposals SAC meeting (1/2 Sept ‘05) GM (WG parallel meet): fine tuning GM (Thursday night): priority list Selection of Projects GM, last day (STC) Detailed project plan November 1 Approval STC November 15 (written procedure) Attribution of resources by COSMO members December meeting STC

14 Draft strategy Longer-term perspectives (3-5 years)
1. High-resolution, short-range EPS available  optimally: each COSMO member contributes ensemble members 2. Assimilation of ‘all’ available data  sfc / profiles / radar / satellites…  high resolution  also slowly-changing information (soil moisture, vegetation state, etc) 3. LM performance is known and critically discussed  example of ECMWF  includes dissemination of results