1 Routing Study of Light Rail Extension to Everett
Presented by: Michael Casal Tom Le Sean Yeung Minh Pham 11 Dec. 2009 Picture:

2 Project goals/Design Requirements
Connect U-district station to Everett Maximize potential users Minimize Impacts to existing recreational infrastructure Environmental impacts Cost

3 Design factors In order to achieve project restraints, data gathered for: Grade Wetlands Population Density Parks Trails Express stops (Light rail)

4 GIS Analysis Buffer Clips Erase Slope calculation Used constraints to
narrow possible routes from U-district to Everett.

5 Option 1

6 Option 2

7 Option 3

8 Recommendations Option 1 Option 2 Option 3
This minimizes changes to existing infrastructure, follows a low slope, and runs through locations where people come from/go to. Option 2 Fails to follow population density as well as Option 1. Option 3 Fails to follow low slope constraints.

9 Sources Snohomish County GIS data < King County GIS Data < Sound Transit Express Bus Stops < White House Logo <