AWWA Leadership Forum ASSET MANAGEMENT November 14, 2017
2
Outline of Presentation
What is Asset Management? Structured Program Customer Service Expectations Planned Maintenance Setting Aside Reserves Minimizing Whole Life Costs
3
What is Asset Management?
4
Asset Management Simplified
Initial Purchase Selected Performance Expectation Dependability 150,000 Mile Repairs 100,000 Mile Repairs Planned Maintenance Costs Expenditures Sale or Trade In Automobile Lifespan Source: Adapted from
5
Element 1: A Structured Program
6
Each Part of the Organization Sees Part of the Elephant
O&M sees: Trucks, crews, pumps, etc. Engineering sees: Studies, capital costs Finance sees: Interest, other financial costs IT sees: Cost of IT systems (SCADA, GIS, Network, Computers) Few see: Internal and external overhead
7
Each Part of the Organization Has an Interest
8
Each Part of the Organization Needs to Participate in the AM Program
9
Element 2: Customer Service Expectations
10
Getting Started in a Structured Way
Two Components Where are we now, and Where do we want to be? “Gap Analysis” AM Plan Supports Closing the Gaps
11
Gap Analysis Where are we now ? Source of Water Supply = 110 % of Peak Demand Where do we want to be ? Source of Water Supply = 150 % of Peak Demand
12
Gap Analysis How to we increase Supply to 150 % of Peak Day Demand ?
13
Element 3: Planned Maintenance
14
Planned Maintenance Initial Purchase Selected Performance
Expectation Dependability 150,000 Mile Repairs 100,000 Mile Repairs Planned Maintenance Costs Expenditures Sale or Trade In Automobile Lifespan Source: Adapted from
15
Planned Maintenance What Is Likely To Fail Eventually Without Maintenance? How Often Should That Asset Be Maintained to Prevent Failure?
16
Examples: Why do we… Replace pipes? Reduce risk of water main breaks and outages Monitor pumping Reduce risk of water stations? outages Have redundant pumps? Reduce risk of asset failure and water outages Do preventive Same maintenance? Increase system capacity? Reduce risk of capacity related delivery constraints
17
Likelihood of Failure… …or Consequences of Failure
Focus Your Efforts Here H M L Likelihood of Failure L M H Consequences ($)
18
Risk Cost: A Rational Approach
Risk cost is an inherent cost of asset ownership It is the product of the likelihood of an event and the dollar consequence of that event Once we know the risk cost, we can make rational decisions on reducing risk
19
Example: Risk Cost of Having Your Car Towed
Average towing bill: $240 Average frequency of needing a tow for your make/model of car: 8 years Annualized risk cost: $240 x 1/8 = $30 Add overhead and profit: $10 Insurance company assumes your risk cost of towing: $40 per year
20
Consequences of Failure Include Both Direct and Indirect Costs
Direct repair costs Loss of production/revenue Social costs (traffic, cleanup, health, etc.) Image repair costs Legal costs Fines, penalties
21
Element 4: Setting Aside Reserves
22
Setting Aside Reserves
Bond Reserve Fund Typically = 25% of Annual Bond Payment How Much Can Your Organization Afford to Set Aside For Repair and Replacement? Option = Annual Depreciation Amount
23
Depreciation $ X = Original Cost of Asset Y = Life Expectancy, Years $X/Y = Annual Depreciation
24
Example: Pump Station $ 500,000 = Original Cost of Asset 40 = Life Expectancy, Years Depreciation = $500,000/40 = $12,500/year
25
Element 5: Minimizing Whole-Life Costs of Asset Ownership
26
Asset Life Cycle Cost Example: Deep Well Pump Station
Consider Capital Costs Consider Annual Operating Costs Consider Annual Maintenance Costs Consider Annual Repair & Replacement Costs Add Costs and Prepare NPV Cost
27
Asset Life Cycle Cost Example: Deep Well Pump Station
Capital Costs…………………………………..$213,743/yr Annual Operating Costs………………….$80,000/yr Annual Maintenance Costs……………..$25,000/yr Annual Repair & Replacement………...$25,000/yr Net Present Worth Cost………………..$5,563,331
28
What Service Levels Provide Lowest Overall Costs?
Total Cost Cost Unplanned R&R Planned R&R Low Level of Service High
29
AM Benefits Add Up. . . USEPA estimates that good AM will result in at least a 20 percent reduction in asset ownership costs
30
Summary Asset Management is:
Structured Program Customer Service Expectations Planned Maintenance Setting Aside Reserves Minimizing Whole Life Costs
31
Questions?