1 GEOTHERMAL HEAT PUMP SYSTEMS: CLOSED-LOOP DESIGN CONSIDERATIONS
Andrew Chiasson Geo-Heat Center, Oregon Institute of Technology

2 Outline Geothermal options - decision tree System construction
Ground heat exchanger materials and layout Inside the building System design Geothermal loop design Pumping The open-loop option

3 General Decision Tree YES NO YES NO YES NO YES NO YES NO YES YES
Unique Opportunity (gray water, etc.) Evaluate resource obtain permits, agreements, etc. NO YES Groundwater for open loop, existing well use or need Good disposal options Aquifer test, groundwater chemistry NO Hard rock, good quality groundwater YES Evaluate standing column well NO YES Enough land for horizontal loop, good soil for excavation NO YES Good conditions for pond loop, interested owner Pond thermal evaluation NO YES Test bores, Thermal conductivity test Good conditions for vertical loop Annual unbalanced loads, AND/OR thermal storage opportunity YES DESIGN DEVELOPMENT Other HVAC System Hybrid

4 GHP Pros/Cons Advantages Energy efficiency Simplicity Low maintenance
Water heating No auxiliary heat (in most cases) No outdoor equipment Packaged equipment Environmentally “green” Lowers peak demand Low life-cycle cost Allows more architectural freedoms Better zone comfort control

5 GHP Pros/Cons Disadvantages First (capital) cost
However, incentives, energy-savings mortgages or loop-leasing are some ways of off-setting costs Limited qualified designers Geographically limited contractors Supply/demand => higher vendor markups

6 System Construction What does the Loop Do?
The closed-loop is a heat exchanger, where fluid flowing through the loop exchanges heat with the earth The earth is a solid material! => thermal storage effects Synonyms: Ground (or ground-loop heat exchanger), earth energy exchanger, ground (or earth) coupling, borehole field, loop field, Geoexchange (GX) Design goal is to size the loop to provide fluid temperatures to the heat pump(s) within the design target range (usually 35oF – 90oF) to meet thermal loads of the building

7 System Construction All underground piping is high-density polyethylene (HDPE) with thermally-fused joints (according to ASTM standards) Field installation procedures have been standardized by IGSHPA DX systems: Copper refrigerant lines are direct buried Standards and operating experiences do not exist to the level of water-source heat pumps

8 System Construction Vertical Loops
Installed by standard drilling methods Auger: soils, relatively shallow holes Mud-rotary: soft sediments and sedimentary rocks Air-rotary: soft to hard relatively dry rocks Air-hammer: hard rock Cable-tool: hard rock, deep holes (slow drilling) Sonic drilling: high drilling rates in most materials Loop (or borehole heat exchanger) is rolled off a reel into borehole Borehole is grouted from the bottom to the top with a “tremie pipe” to insure a good seal Standard bentonite grout Thermally-enhanced grouts (bentonite/sand mixture)

9 System Construction Vertical Loops
Mixing grout Installing vertical loop

10 System Construction Vertical Loops
Drilling fluids flowing from hole as grout is pumped in Inserting u-tube & tremie-pipe With geo-clips

11 System Construction Vertical Loops
1 bore per circuit u-tubes can range in diameter from ¾ to 1 ¼ inch (1-inch is most common) 150 – 300 ft typical depth Reverse-return piping arrangement

12 System Construction Horizontal Loops
4 – 6 ft burial depth

13 System Construction Horizontal Loops

14 System Construction Pond Loops

15 System Construction Pond Loops
Copper Pipe Geo Lake Plate HDPE Pipe

16 System Construction Flushing/Purging
The loop must be designed so it can be flushed to remove debris and entrained air upon commissioning or at any time necessary Install provisions (shut-off valves, hose ports) on the supply and return runouts Large systems use one or more vaults Smaller systems can have valves on headers in mechanical room

17 System Construction Building Interior
(from Water Furnace)

18 System Construction Building Interior
(from Water Furnace)

19 System Construction Building Interior
(from Water Furnace)

20 System Construction Building Interior – Hydronic Systems
Using water-to-water heat pumps for hot water

21 System Construction Building Interior – Hydronic Systems
Using water-to-water heat pumps Max. output water temperatures are about 120oF (cast iron radiators generally designed for oF) Baseboards Fan Coil Units

22 System Construction Building Interior – Outdoor Air
Several options Introducing too cold or too hot outdoor air directly to a heat pump decreases it’s capacity => but, increasing heat pump capacity may result in too much air flow In commercial buildings, some type of heat recovery system is generally recommended Water-water heat pumps tied to the ground loop can be used to pre-condition outdoor air

23 Loop Design Important Parameters Vertical Closed Loop
SOLAR COLLECTOR ARRAY Heat Gains and Losses COOLING TOWER BoreholeThermal Resistance or Undisturbed Earth Temperature Average Thermal Conductivity Borehole Spacing

24 Loop Design Important Parameters Horizontal Closed Loop
Various loop configurations => Borehole resistance concept is replaced by trench resistance Trench depth dictates average earth temperature! => Twinter, Tsummer

25 Loop Design RULES OF THUMB ARE NOT RECOMMENDED FOR FINAL DESIGN
Why? The earth is a solid material, so effects of run time are important in the design!! => Heat pump run hours must be considered Loop design for residential buildings is generally handled differently than commercial buildings Why? Internal gains in commercial buildings, load diversity, etc. affect annual heat rejection/extraction to the ground, so the building life-cycle must be considered

26 Loop Design Know the Loads Profile of the Building
Zone loads determine the heat pump size (a zone is the area controlled by a thermostat) In U.S. & Canada, accepted practice is to size heat pump equipment based on the peak cooling load, and should NOT be oversized; want to minimize on-off cycling, maximize humidity control If necessary, supplemental electric heat can make up the difference Block loads (greatest sum of hourly zone loads) determine the loop size Block loads depend on the building “diversity” For example, residential buildings have no diversity, a school with wings may have a 50-60% diversity

27 Loop Design Overview of Procedure
Building Loads (from loads calculation software, residential may use spreadsheets) Residential Commercial Peak hour Design month run fraction (usually from degree days) Ground-loop software that considers: Peak hour Monthly run fraction Annual full load hours OR monthly loads Ground thermal properties Ground thermal properties Design lengths: IGSHPA method Proprietary software (usually employs IGHSPA method) Design lengths (NO UNIFIED METHOD): ASHRAE method Proprietary software

28 Loop Design Design Software

29 Loop Design Thermal Conductivity
Thermal conductivity is generally dependent on density, moisture content, mineral content Soils: Clays (15% moisture) Btu/hr-ft-F Clays (5% moisture) Sands (15% moisture) Sands (5% moisture) – 1.9 Rocks: Granite – 2.1 Btu/hr-ft-F Basalt – 1.4 Limestone – 2.2 Sandstone – 2.0 Shale – 1.4 Grouts: Standard bentonite Thermally-enhanced – 1.40

30 Loop Design Thermal Conductivity
An in-situ thermal conductivity test (or thermal response test) is recommended on commercial jobs

31 Loop Design Hybrid Systems
Unbalanced loads over annual cycle A school in a cold climate with no summer occupancy, or office/school in warm climate A supplemental piece of equipment (or another process) handles some of the building space load Boiler Solar collector array Cooling tower Pond or swimming pool Snow melting system Refrigeration load

32 Loop Design Hybrid Systems
HEATING LOADS COOLING

33 Loop Design Hybrid Systems
Need software for analysis => current ASHRAE research project to study design and control Example School in Northern U.S.

34 Loop Design Loop Lengths for Planning
Generalized loop lengths for planning purposes NOT recommended for final designs => use software

35 Pumping Flow requirement for heat pumps is 2 to 3 gpm/ton
Flow requirement for 1-inch u-tubes is similar in order to maintain turbulent flow Total loop flow rate should be based on BLOCK LOADS, not total heat pump capacity Desire just enough flow to maintain turbulence, especially at peak hours => check Reynolds Number (Re > 2300) More turbulence means more convection heat transfer, but more pumping energy

36 Pumping If freezing temperatures are expected from heat pumps, loop should be freeze-protected (temperature drop across heat pumps of 10oF should be assumed) Use as little antifreeze as necessary! Types of antifreeze: Propylene glycol Ethanol Methanol CPTherm (new product) Need to check viscosities at low temperatures => impacts pumping energy

37 Pumping ASHRAE grading system:
A-Excellent 0.05 hp/ton B-Good hp/ton C-Mediocre hp/ton D-Poor hp/ton In other words, pumping kW should be <10% of total system demand Reduce friction losses by: Reverse-return piping Parallel circuits Use larger-diameter pipe in deeper bores

38 Pumping Flow management
Variable speed drives in central systems Sub-central pumping Individual flow centers if possible Constant flow pumping NOT recommended De-centralized loop fields in buildings with diverse floor plans

39 Open Loop Option Advantages : Disadvantages : Water quality dependent
Low cost, especially for large loads and residential applications that need a drinking water well Water well drilling technology is well-established Stable source temperature Standing column well option in certain circumstances Disadvantages : Water quality dependent Scaling Corrosion Iron bacteria, well fouling Water disposal Laws and regulations Permits, water rights

40 Summary Closed Loops: vertical vs. horizontal vs. pond
Vertical loops generally have highest first cost Consider practical considerations for loop installation => hybrid systems, open loop option Think system: interior HVAC components, outdoor air Efficiency and lower cost through design Final designs should use design software