Download presentation
Presentation is loading. Please wait.
1
Afsnit 7 - Afsluttende bestemmelser
DU≤1kV DU > 1kV Requirement A Tx DF Dx DF Tx DS Tx TCDF Dx CDS M frequency requirement, A12(1) X voltage requirement, A13(1) auto disconnect at specified voltage A13(6) Short circuit requirement, Icw,(1), Ipk min + Ipk max (2), (3-9 event planning) A14 (?) Reactive power requirement A15 Protection requirement (1:Tx) (DF/DS:2) A16 Control requirement A17 Information exchange A18 Demand disconnection and demand reconnection (for system defense) A19 -S Automatic under-frequency-disconnection A19(1) Low voltage demand disconnection A19(2) Blocking of load tap changer A19(3) Reconnection after disconnection (a) Synchronization( b), Remotely disconnect(c) A19(4) Power quality A20 S Simulation models A21 G Operational notification, EON-ION-FON A22-A25 Operational notification, LON A26 O DSR service, general provision A27 Active power control (remote) (a)(i) A28 Reactive power control (remote)(a)(ii) Transmission C M (remote)(a)(iii) System freq. control (auto)(b)(i) A29 Very fast active power control (auto)(b)(ii) A30 ONP (for providing DSR) general provision A31 U<1kV ONP; Installation document A32 ONP; DSRUD A33 Roles, responsibility’s, Compliance testing A34-36 Compliance testing, system defense A37 Compliance testing, information exchange A38 A39 A40 Compliance testing, DU, DSR A41 w/ DR Compliance simulation, common provision A42 (w/DR*) Reactive Power Range ( simulation) A43 Reactive power range ( simulation) A44 Very fast active power control ( simulation) A45 (X?) Compliance Monitoring A46 A47 DF=Demand Facility; DS=Distribution System; TCDF=Transmission Connected Distribution Facility; CDS=Closed Distribution System Demand unit w/DR very fast active power control Afsnit 7 - Afsluttende bestemmelser - NC DCC - FBN
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.