G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations
2
Basement Dig-out
3
Basement Dig-out Client: Lotties’ New Pub Location: Chicago (Bucktown)
Building Type: One story bar and restaurant Problem: Basement of building was unusable space due to low ceiling height. Solution: Dug out basement, installed drainage system, poured 10” double steel reinforced structural concrete slab with retaining wall running along the perimeter of basement allowing for the build-out of basement area for use as an addition lower level bar and entertainment area.
4
Basement Dig-out Start of dig-out.
Hit water after 1 foot dig necessitating installation of drainage system.
5
Basement Dig-out Post dig-out.
Installed drainage system and laid gravel prior to pouring slab. Note that the dark line is where original soil level was
6
Basement Dig-out South end of basement Original floor level
7
Basement Dig-out Northwest corner of basement Original floor level
8
Basement Dig-out Northwest corner of basement
Laid two layers of reinforcing rebar for slab along with vertically oriented rebar along the basement perimeter for retaining wall reinforcement
9
Basement Dig-out Installed rebar vertically along perimeter of basement for reinforcement of retaining wall.
10
Basement Dig-out Installed drainage system.
11
Basement Dig-out Used laser level for slab pour to take readings of top of slab.
12
Basement Dig-out Used pumper to run cement 100 ft.
13
Basement Dig-out Finishing concrete work
14
Basement Dig-out Forms for retaining walls
15
Basement Dig-out Northwest corner of basement with forms removed.
16
Basement Dig-out Northwest corner of basement… Ready for grand opening!
17
Basement Dig-out
18
Basement Dig-out
19
Basement Dig-out Back stairs and stair well