Presentation is loading. Please wait.

Presentation is loading. Please wait.

StratoBuoy II Results Matt Voll Brian Mayernik Pat O’Hara.

Similar presentations


Presentation on theme: "StratoBuoy II Results Matt Voll Brian Mayernik Pat O’Hara."— Presentation transcript:

1 StratoBuoy II Results Matt Voll Brian Mayernik Pat O’Hara

2 Mission Recap Tested development hardware and software for the power system of the SpaceBuoy nanosat project Simulated loads (for current/voltage sensing) Telemetry recorded using IIC interface

3 Pre-flight Modifications
Analog-to-Digital converter failed at some point in final testing. The A-to-D is a critical part of recording telemetry data, so a crucial part of our SHOT II payload Last minute problems with our 12V - 5V DC converter supply for our CDH board (overheating)

4 Solutions

5 Results Approximately 2 hours of telemetry data logged, at 1 sample/sec Less than flight time. What happened? Batteries still supplying power at recovery Possible causes: Faulty connection caused power loss at balloon separation/burst (large ∆v) Low temps affected exposed power lines (ice build- up) Still plenty of data to work with

6 Results Continued…

7 3.3V Reg Voltage vs. Time (s)
* Needs adjustment

8

9 * Needs adjustment

10

11 * Needs adjustment

12

13 * Needs adjustment

14 Lessons Learned Don’t leave things for the last minute
However, always be prepared for things to go wrong at the last minute

15 Thank You


Download ppt "StratoBuoy II Results Matt Voll Brian Mayernik Pat O’Hara."

Similar presentations


Ads by Google