Presentation is loading. Please wait.

Presentation is loading. Please wait.

November 2008 doc.: IEEE /1437r1 July 2010

Similar presentations


Presentation on theme: "November 2008 doc.: IEEE /1437r1 July 2010"— Presentation transcript:

1 November 2008 doc.: IEEE /1437r1 July 2010 P802.11z report to EC on request for conditional approval to proceed to RevCom Date: Authors: Name Company Address Phone Menzo Wentink Qualcomm Straatweg 66, Breukelen, the Netherlands Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

2 November 2008 doc.: IEEE /1437r1 July 2010 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11z to RevCom. This document (11-10/0854r1) was approved during the closing plenary session of the working group on July 16, 2009. Passed in the Working Group M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

3 IEEE 802 Sponsor Ballot Results – P802.11z
November 2008 doc.: IEEE /1437r1 July 2010 IEEE 802 Sponsor Ballot Results – P802.11z Draft Opened Closed Days Ballot Type Pool Approve Disapprove Abstain Return D6.0 30 Initial 144 103 87% 15 13% 7 5% 125 86% D7.0 Recirc 1 105 16 14% 9 6% 130 90% D8.0 Recirc 2 121 93% 8 7% 136 94% D9.0 Recirc 3 123 95% 6 D9.0a Recirc 3a 97% 4 3% D9.0a includes post ballot vote changes received via . M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

4 Comments by Ballot – P802.11z July 2010 November 2008
doc.: IEEE /1437r1 July 2010 Comments by Ballot – P802.11z Draft Ballot Not Required Satisfied Known Unsatisfied Assumed Unsatisfied Total D6.0 Initial 44 150 1 (Trainin) 16 (Roy) 4 (Palm) 4 (Epstein) 218 D7.0 Recirc 1 12 38 50 D8.0 Recirc 2 3 2 (Palm) 17 D9.0 Recirc 3 9 77 194 1 26 297 M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

5 Unsatisfied Comments by Commenter
November 2008 doc.: IEEE /1437r1 July 2010 Unsatisfied Comments by Commenter Commenter D6.0 D7.0 D8.0 D9.0 Total R. Roy (SRA) 16* S. Palm (Broadcom) 4* 2* 6* J. Epstein (Interdigital) S. Trainin (Intel) 1 25 2 27 *Assumed unsatisfied, no response to repeated s to commenter M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

6 Mandatory coordination
June 2009 November 2008 doc.: IEEE /0674r0 doc.: IEEE /1437r1 July 2010 Mandatory coordination Coordination Entity Draft Date Status IEEE-SA Editorial (MEC) D6.0 July 09 “Meets all editorial requirements. “ Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Registration Authority Committee (RAC) M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 6 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel

7 Unsatisfied Comments – Topics
November 2008 doc.: IEEE /1437r1 July 2010 Unsatisfied Comments – Topics Topic #Comments Editorial 14 Power save 1 Security Frame routing 2 Off-channel 7 Frame priority Encapsulation Total 27 M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

8 November 2008 doc.: IEEE /1437r1 July 2010 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the ballot resolution committee during sponsor ballot is attached. Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

9 TGz Timeline Open Close Clean recirculation (TGz draft 10.0)
November 2008 doc.: IEEE /1437r1 July 2010 TGz Timeline Open Close Clean recirculation (TGz draft 10.0) M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

10 802.11 EC Motion – Conditional Approval to send P802.11z to RevCom
June 2009 November 2008 doc.: IEEE /0674r0 doc.: IEEE /1437r1 July 2010 EC Motion – Conditional Approval to send P802.11z to RevCom Request the IEEE 802 Executive Committee for conditional approval to forward P802.11z D10.0 to RevCom. P802.11z had a 97% approval on the last Recirculation Sponsor Ballot, including post ballot vote changes. There are 4 disapprove voters, and 27 unsatisfied comments. CRC vote on the Motion Passed: 12 y, 0 n, 0 a Moved: Bruce Kraemer Second: <tbd> Yes No Abstain M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 10 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel

11 Key July 2010 June 2009 November 2008 doc.: IEEE 802.11-09/0674r0
Coordination: comment supplied by a Mandatory coordination entity Not Required: comment indicated as not required to satisfy voter Satisfied: comment required to satisfy voter that is indicated as satisfied either by the voter indicating satisfaction with the specific comment, or by voting yes in a subsequent ballot Known Unsatisfied: a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has indicated they are unsatisfied with the comment resolution. Assumed Unsatisfied: comment not meeting any of the above criteria – i.e., a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has not responded when asked about their satisfaction with the comment resolution. M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 11 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel


Download ppt "November 2008 doc.: IEEE /1437r1 July 2010"

Similar presentations


Ads by Google