Presentation is loading. Please wait.

Presentation is loading. Please wait.

Water Cost-of-Service

Similar presentations


Presentation on theme: "Water Cost-of-Service"— Presentation transcript:

1 Water Cost-of-Service
City of Las Cruces Water Cost-of-Service January 10, 2018

2 Agenda The water rate setting process What is cost-of-service?
Water revenue requirement Cost-of-service findings

3 Rate Setting Process Cost-of-Service Allocation Revenue Requirements
Rate Design Cost-of-Service Allocation Revenue Requirements How much do the rates need to collect? Which portions should each customer pay, and why? How customers are billed for their costs of service?

4 What is Cost-of-Service?
Cost-of-service analysis divides the total revenue requirement into smaller cost categories that match the way the system works. Smaller costs are then matched to customers’ usage to determine each customer class’ share of the total revenue requirement. Total Revenue Required Water System Functions Customer Demands Divided into Matched to Results in Avg. Cost per Unit of Demand

5 Summary Revenue Requirement
Adjusted Cost Element $ Million Operating & Maint. Expense1 $13.4 Principal & Interest on Debt 4.9 Cash for Capital Projects & Other 2.8 Total Revenue Requirement $21.1 1 includes allowance for uncollectable accounts Revenues at current rates - $17.4 Additional Funds Needed = $3.8 The water utility needs to add $3.8 million to its revenues as soon as possible in order meet its expected obligations – a 24% increase to user rates.

6 Customer Demands

7 Phase-in Options Year 1 Year 2 Year 3 Full Cost 24% 0% Option 1 15% 4%
7% 8% These options each would allow revenues to be increased to the appropriate level within 3-years.

8 Full Costs of Service

9 Full Cost of Service The rates in this option would be based on the entire cost of service from our findings without a phase-in

10 User-Charge Revenue Requirement at Full Cost
User-charge requirement is the total revenue requirement less misc. fees Water rights acquisition fees Service charges Line extensions Misc.

11 Functional Cost Allocation – Full Costs
We match all costs to each part of the water system (called “functions”) The total cost of each function is then allocated to customer classes based their demand for each function. Only the Residential class is shown here, but we allocate costs for all customer classes….the table is too big for this screen!

12 Average Costs per Unit – Full Cost
Dividing the total costs by the units of demand, we can find the average cost per unit of volume, and per customer.

13 Compare Costs to Revenues – Full Cost
We then compare the revenue recovered under existing rates with each class’ cost of service. Some recover enough already, and some don’t.

14 Adjust Revenues – Full Cost
Proposed adjustments increase total revenue to meet the costs of service – some classes need greater increases than others.

15 Residential Rate – Full COS
Current Proposed Access Charge Per month $6.82 $13.58 Volume Charge Summer Period First 3,000 gal $.70 +$.41 $.98 Over 3,000 gal $2.08 $2.92 Non-Summer Period $1.89 $2.65 Base Rate Revenue $2,624,793 $5,226,488 Usage Rate Revenue $7,440,902 $8,147,159 Total Rate Revenue $10,065,695 $13,373,647

16 Phase-in Option 1

17 Option 1 Phase-in Plan The rates are based on reduced revenue requirements resulting in fewer dollars to support the capital requirements.

18 User-Charge Revenue Requirement for Option 1 (Year 1)
User-charge requirement is the total revenue requirement less misc. fees Water rights acquisition fees Service charges Line extensions Misc.

19 Functional Cost Allocation – Option 1
We match all costs to each part of the water system (called “functions”) The total cost of each function is then allocated to customer classes based their demand for each function. Only the Residential class is shown here, but we allocate costs for all customer classes….the table is too big for this screen!

20 Average Costs per Unit – Option 1
Dividing the total costs by the units of demand, we can find the average cost per unit of volume, and per customer.

21 Compare Costs to Revenues – Option 1
While Option 1 results in a 14.2% revenue increase overall, the increase is not the same for each class; some are higher than others.

22 Full Costs vs. Phase-In FULL COST OPTION 1
Remember that the phase-in options only get you part of the way to full-cost recovery. Rate adjustments should be mindful of both targets.

23 Adjust Revenues – Option 1
Proposed adjustments increase total revenue up to the phase-in target by applying a uniform increase to classes whose rates are currently too low

24 Residential – Option 1 Current Proposed Access Charge Per month $6.82
$13.17 Volume Charge Summer Period First 3,000 gal $.70 +$.41 $.82 Over 3,000 gal $2.08 $2.43 Non-Summer Period $1.89 $2.20 Base Rate Revenue $2,624,793 $5,068,475 Usage Rate Revenue $7,440,902 $6,852,091 Total Rate Revenue $10,065,695 $11,920,566

25 Phase-in Option 2

26 Option 2 Phase-in Plan The rates are based on reduced revenue requirements resulting in fewer dollars to support the capital requirements.

27 User-Charge Revenue Requirement for Option 2 (Year 1)
User-charge requirement is the total revenue requirement less misc. fees Water rights acquisition fees Service charges Line extensions Misc.

28 Functional Cost Allocation – Option 2
We match all costs to each part of the water system (called “functions”) The total cost of each function is then allocated to customer classes based their demand for each function. Only the Residential class is shown here, but we allocate costs for all customer classes….the table is too big for this screen!

29 Average Costs per Unit – Option 2
Dividing the total costs by the units of demand, we can find the average cost per unit of volume, and per customer.

30 Compare Costs to Revenues – Option 2
While Option 2 results in a 6.2% revenue increase overall, the increase is not the same for each class; some are higher than others.

31 Full Costs vs. Phase-In FULL COST OPTION 2
Remember that the phase-in options only get you part of the way to full-cost recovery. Rate adjustments should be mindful of both targets.

32 Adjust Revenues – Option 2
Proposed adjustments increase total revenue up to the phase-in target by applying a uniform increase to classes whose rates are currently too low

33 Residential – Option 2 Current Proposed Access Charge Per month $6.82
$12.82 Volume Charge Summer Period First 3,000 gal $.70 +$.41 Over 3,000 gal $2.08 Non-Summer Period $1.89 Base Rate Revenue $2,624,793 $4,932,380 Usage Rate Revenue $7,440,902 $5,952,966 Total Rate Revenue $10,065,695 $10,885,345

34 Water Rate Foundation The rates are based on the total rate revenues required to pay for the operating and capital needs of the water utility. This represents a phase-in plan to get the Water Utility revenues up to its full cost of service in the next three years. All rates shown reflect only the FIRST year of the plan.

35 Cost-of-Service A second analysis divides the total revenue requirement into smaller cost categories that match the functioning of the system. Smaller costs are then matched to customers’ usage to determine each customer class’ share of the total revenue requirement. Total Revenue Required Water System Functions Customer Demands Divided into Matched to Results in Avg. Cost per Unit of Demand

36 Rate Adjustments are Cost Based
Adjustments to rates, if any, are determined from the cost-of-service by class compared to the revenue each class recovers from existing rates.

37 Cost-of-Service as a Guide
Cost-of-service is a guide for adjusting rates. Some rates need to be increased, while others do not. 80% of the revenue increase needed next year is due to a need for increased Residential revenue to match the costs of serving that class

38 Residential Current rates are under-recovering revenue from the class;
Proposed Access Charge Per month $6.82 $12.82 Volume Charge Summer Period First 3,000 gal $.70 +$.41 Over 3,000 gal $2.08 Non-Summer Period $1.89 Base Rate Revenue $2,624,793 $4,932,380 Usage Rate Revenue $7,440,902 $5,952,966 Total Rate Revenue $10,065,695 $10,885,345 Current rates are under-recovering revenue from the class; Proposed access charges increase to recover customer-related costs; Any remaining costs recovered from volume charges. Class Cost of Service = $10.88M

39 Residential – Bill Comparison
The proposed rate recovers more revenue from the access charge and less from volume charges resulting in higher bills in non-summer months.

40 Small Commercial Current Proposed Access Charge Per month $15.75 Volume Charge Summer Period Per 1,000 gal $1.26 +$.41 $1.93 Non-Summer Period $1.05 $1.61 Base Rate Revenue $687,094 Usage Rate Revenue $1,222,276 $1,377,786 Total Rate Revenue $1,909,370 $2,064,880 Current rates are under-recovering revenue in the class; Access charges are sufficient compared to cost-of-service; Volume rates increased to meet remaining costs. Class Cost of Service = $2.06M

41 Small Commercial – Bill Comparison
The proposed rate recovers the same revenue from the access charge and more from volume charges resulting in higher bills on average.

42 Large Commercial/Multi-Unit
Current Proposed Access Charge Per month $37.00 Volume Charge Summer Period Per 1,000 gal $2.05 +$.41 $2.46 Non-Summer Period $1.71 $2.12 Base Rate Revenue $191,882 Usage Rate Revenue $2,111,886 Total Rate Revenue $2,303,768 Current rate recovers sufficient revenue for the class No increase required

43 Large Commercial – Bill Comparison
There are no changes proposed for the Large Commercial class at this time.

44 Industrial Current rate recovers sufficient revenue for the class
Proposed Access Charge Per month $1,000 Volume Charge Summer Period Per 1,000 gal $1.54 +$.41 $1.95 Non-Summer Period $1.28 $1.69 Base Rate Revenue $216,000 Usage Rate Revenue $645,190 Total Rate Revenue $861,190 Current rate recovers sufficient revenue for the class No increase required

45 Non-Potable Parks Current Proposed Access Charge Per month $0.00 $38.35 Volume Charge Summer Period Per 1,000 gal $1.32 +$.41 $1.75 Non-Summer Period Base Rate Revenue $0 $920 Usage Rate Revenue $23,206 $24,175 Total Rate Revenue $25,095 Current rates are under-recovering revenue in the class; Access charges are not sufficient compared to cost-of-service; Volume rates do not need to be adjusted. Class Cost of Service = $25,100

46 Bulk Water Current rate recovers sufficient revenue for the class
Proposed Access Charge Per month $23.50 Volume Charge Summer Period Per 1,000 gal $3.74 Non-Summer Period $3.12 Base Rate Revenue $24,957 Usage Rate Revenue $222,825 Total Rate Revenue $247,782 Current rate recovers sufficient revenue for the class No increase required

47 Parks Current rates are under-recovering revenue in the class;
Proposed Access Charge Per month $82.00 Volume Charge Summer Period Per 1,000 gal $1.93 +$.41 $2.60 Non-Summer Period $1.61 $2.17 Base Rate Revenue $34,440 Usage Rate Revenue $162,136 $178,186 Total Rate Revenue $196,576 $212,626 Current rates are under-recovering revenue in the class; Access charges are sufficient compared to cost-of-service; Volume rates are adjusted to meet remaining costs for class. Class Cost of Service = $212,500

48 Parks Off-Peak Current rates are under-recovering revenue in the class; Access charges are not sufficient compared to cost-of-service; Volume rates do not need to be adjusted. Current Proposed Access Charge Per month $82.00 Volume Charge Per 1,000 gal $1.03 +$.41 $1.44 Base Rate Revenue $57,072 Usage Rate Revenue $181,553 Total Rate Revenue $238,625

49 Reclaimed Current rates are under-recovering revenue in the class;
Access charges are sufficient compared to cost-of-service; Volume rates are adjusted to meet remaining costs for class. Current Proposed Access Charge Per month $20.00 Volume Charge Per 1,000 gal 50% of class rate $.67 Base Rate Revenue $1,920 Usage Rate Revenue $81,357 $88,139 Total Rate Revenue $83,277 $90,059 Class Cost of Service = $90,025

50 San Pablo Current rates are under-recovering revenue in the class;
Due to contract provisions, these rates cannot be adjusted until 2023 Current Proposed Access Charge Per month $8.96 Volume Charge Per 1,000 gal $.86 Base Rate Revenue $72 $108 Usage Rate Revenue $12,940 Total Rate Revenue $13,012 Class Cost of Service = $14,060

51 Las Cruces Rate Survey

52 % Revenue from Access Charges
Base rates make a utility more resilient against revenue instability from changing water usage Utility % Revenue from Access Charges Las Cruces 29% Albuquerque 49% Rio Rancho 23% Santa Fe 30%

53 Residential access charges
Utility Residential access charges Las Cruces-Current $ Las Cruces-Proposed 12.82 Albuquerque* 15.91 Rio Rancho* 11.53 Santa Fe* 18.42 El Paso* 6.63 Deming 3.00 Alamogordo* 13.60 Mesa* 27.55 Seattle* 15.15 Lubbock* 16.00 Tucson* 13.53 Access Charges Comparison of Access Charges * * * * * * * * * *Base rates vary by meter size

54 Tiered Pricing Objectives of tiered pricing:
Encourage conservation generally Promote efficient use while reflecting differences in household size or reasonable outdoor use 2 tiers 3+ tiers Utilities with 2 tiers Las Cruces Santa Fe Utilities with 3 tiers Rio Rancho El Paso Seattle Lubbock Utilities with 4 tiers Mesa Tucson Albuquerque Utilities with 5 tiers Alamogordo

55 Tier Sizes Utility Tier 1 Volume Tier 1 Rate Tier 2 Volume Tier 2 Rate
Uniform Rate Structure Deming Uniform $1.64 (w) $1.98 (s) - 2 Tier Rate Structure Las Cruces-Current 3 kgal $.70 - $1.89 (w) $2.08 (s) Las Cruces-Proposed $.78 $2.09 (w) $2.30 (s) Santa Fe 7 kgal (w) 10 kgal (s) $6.06 $21.72

56 Tier Sizes Utility Tier 1 Volume Tier 1 Rate Tier 2 Volume Tier 2 Rate
3 Tier Rate Structure Rio Rancho 6 kgal $5.32 10 kgal $5.76 - $6.21 El Paso 150% AWC* $2.66 250% AWC $6.32 $9.04 Seattle 7 kgal $6.89 17 kgal $7.07 $8.74 Lubbock 5 kgal $4.76 45 kgal $6.50 $7.79 *AWC (Average Winter Consumption)

57 Tier Sizes 4 Tier Rate Structure 5 Tier Rate Structure Utility
Tier 1 Volume Tier 1 Rate Tier 2 Volume Tier 2 Rate Tier 3 Volume Tier 3 Rate Tier 4 Volume Tier 4 Rate Tier 5 Rate 4 Tier Rate Structure Albuqu-erque 200% AWC* $2.54 300% AWC* $3.81 400% AWC* $5.09 - $6.36 Mesa 10 kgal $3.13 20 kgal $4.70 24 kgal $5.57 $6.07 Tucson 5 kgal $2.31 11 kgal $4.44 22 kgal $10.33 $16.04 5 Tier Rate Structure Alamo-gordo 20 kgal $1.94 40 kgal $3.14 53 kgal $4.88 67 $7.09 $10.63 *AWC (Average Winter Consumption)

58 Seasonal Rates Objectives of seasonal rates:
Recover additional operating expenses in summer: Purchased water costs Power costs Encourage conservation in summer months… If source of supply is constrained in summer months If customers tend to be more wasteful in summer months

59 Seasonal Rate Structure
Utility Seasonal Rate Structure Las Cruces Tier 2 rates increase in summer Albuquerque Tiers 2, 3, and 4 in summer only Santa Fe Tier 1 width increases in summer Deming Uniform rates increase in summer Seattle Tier 2 and Tier 3 in summer only

60 Rate Riders Las Cruces and Albuquerque are the only utilities with ‘Rate Riders’, however other utilities recover specific costs in various ways. Utility Water Rights DIF/Capital Charge Litigation Power Las Cruces $.11/kgal $.41/kgal $.02/kgal Albuquerque $.16/kgal $.07/kgal Rio Rancho Greater of $6 or $.50/kgal El Paso $9.83* Alamogordo $1.00/customer Tucson $.92/kgal *Water rights charge varies by meter size

61 Total Bill Comparison Low Residential User - Summer

62 Total Bill Comparison High Residential User - Summer

63 Total Bill Comparison Moderate Residential User - Winter

64 Proposed Rate Increases by Customer Class
Las Cruces Utilities Proposed Rate Increases by Customer Class

65 Residential Current Option 1 Option 2 Full COS Access Charge Per month
$6.82 $13.17 $12.82 $13.58 Volume Charge Summer Period First 3,000 gal $.70 +$.41 $.82 $.98 Over 3,000 gal $2.08 $2.43 $2.92 Non-Summer Period $1.89 $2.20 $2.65 Base Rate Revenue $2,624,793 $5,068,475 $4,932,380 $5,226,488 Usage Rate Revenue $7,440,902 $6,852,091 $5,952,966 $8,147,159 Total Rate Revenue $10,065,695 $11,920,566 $10,885,345 $13,373,647

66 Small Commercial Current Option 1 Option 2 Full COS Access Charge
Per month $15.75 Volume Charge Summer Period Per 1,000 gal $1.26 +$.41 $2.20 $1.93 Non-Summer Period $1.05 $1.83 $1.61 Base Rate Revenue $687,094 Usage Rate Revenue $1,222,276 $1,573,535 $1,377,786 Total Rate Revenue $1,909,370 $2,260,629 $2,064,880

67 Large Commercial/Multi-Unit
Current Option 1 Option 2 Full COS Access Charge Per month $37.00 Volume Charge Summer Period Per 1,000 gal $2.05 +$.41 $2.46 Non-Summer Period $1.71 $2.12 Base Rate Revenue $191,882 Usage Rate Revenue $2,111,886 Total Rate Revenue $2,303,768

68 Industrial Current Option 1 Option 2 Full COS Access Charge Per month
$1,000 Volume Charge Summer Period Per 1,000 gal $1.54 +$.41 $1.95 Non-Summer Period $1.28 $1.69 Base Rate Revenue $216,000 Usage Rate Revenue $645,190 Total Rate Revenue $861,190

69 Reclaimed Current Option 1 Option 2 Full COS Access Charge Per month
$20.00 Volume Charge Per 1,000 gal 50% of class rate $.74 $.67 $.83 Base Rate Revenue $1,920 Usage Rate Revenue $81,357 $96,706 $88,139 $108,724 Total Rate Revenue $83,277 $98,626 $90,059 $110,644

70 Bulk Water Current Option 1 Option 2 Full COS Access Charge Per month
$23.50 Volume Charge Summer Period Per 1,000 gal $3.74 Non-Summer Period $3.12 Base Rate Revenue $24,957 Usage Rate Revenue $222,825 Total Rate Revenue $247,782

71 San Pablo Current Option 1 Option 2 Full COS Access Charge Per month
$8.96 Volume Charge Per 1,000 gal $.86 Base Rate Revenue $72 $108 Usage Rate Revenue $12,940 Total Rate Revenue $13,012

72 Parks Current Option 1 Option 2 Full COS Access Charge Per month
$82.00 Volume Charge Summer Period Per 1,000 gal $1.93 +$.41 $2.89 $2.60 $3.15 Non-Summer Period $1.61 $2.41 $2.17 $2.62 Base Rate Revenue $34,440 Usage Rate Revenue $162,136 $198,367 $178,186 $215,834 Total Rate Revenue $196,576 $232,807 $212,626 $250,274

73 Parks Off-Peak Current Option 1 Option 2 Full COS Access Charge
Per month $82.00 Volume Charge Per 1,000 gal $1.03 +$.41 $1.44 Base Rate Revenue $57,072 Usage Rate Revenue $181,553 Total Rate Revenue $238,625

74 Non-Potable Parks Current Option 1 Option 2 Full COS Access Charge
Per month $0.00 $41.54 $38.35 $45.25 Volume Charge Summer Period Per 1,000 gal $1.32 +$.41 $1.92 $1.75 $2.16 Non-Summer Period Base Rate Revenue $0 $997 $920 $1,086 Usage Rate Revenue $23,206 $26,485 $24,175 $29,746 Total Rate Revenue $27,482 $25,095 $30,832


Download ppt "Water Cost-of-Service"

Similar presentations


Ads by Google