Download presentation
Presentation is loading. Please wait.
Published byElaine Issac Modified over 10 years ago
1
Work load and responsibilit y npor. Ing. Miroslava Šimonová
2
Structure 1. Air traffic control at the Přerov airport 2. Work load 3. Responsibility
3
1. Air traffic control at the Přerov airport Aerodrome control tower aerodrome control approach control precision radar approach control Class D of the airspace
4
1. Air traffic control at the Přerov airport Aerodrome control – TWR -Aerodrome traffic -VFR flights in control zone -IFR (departure, arrival) + SVFR flights according to coordination with approach controller
5
2. Work load Takeover of ATC unit Familiarization with the condition, rules Inspect radio technical aids Adjust airport lights Evaluate the ornitological situation and the weather Complete activity reports
6
2. Work load Conduct pre-flight briefing Listen to the frequency Issue clearances and instructions Monitor and direct aircraft and vehicles Visual control
7
2. Work load Provide separation between arriving and departing aircraft Transfer/accept control of departing/arriving flights to adjacent ATC units Communication and coordination with the surrounding ATC units
8
2. Work load Contact pilots to provide/relay information Give recommendation/restrictions to flights in my area of responsiblity Alert airport emergency services
9
2. Work load -Knowledge of rules, regulations, directives -Use standard phraseology -Speak clearly and distinctly -Experiences
10
3. Responsibility -Safety -Fluency -Economy
11
Thank your for your attention
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.