Download presentation
Presentation is loading. Please wait.
Published byGillian McDaniel Modified over 6 years ago
1
Integrating viewpoint forms with construction imaging content types
Michael Schear Instructional Designer Billie Kalmowitz Software Consultant
3
Viewpoint Integration
Connecting Your Content With Your data Viewpoint Integration Enterprise Content Management Document Lifecycle Design Requirements Configuration Process The Viewpoint Integration allows for your content – whatever you are managing Integration Mapping
19
Why Integrate the two? Central Repository for all your content
Workflow Powerful Viewer Audit Trail Accessibility Collaboration
20
Enterprise Content Management ECM is a formalized means of organizing and storing an organization's documents, and other content, that relate to the organization's processes. The term encompasses strategies, methods, and tools used throughout the lifecycle of the content. Wikipedia – The Free Encyclopedia At this point, you’ve introduced the session overview/summary and can launch the software and continue your presentation from there. If there is a need to include data charts, examples are on the next slides.
21
Data & Content Data from Viewpoint is stored with Content within Construction Imaging. 1. In this session we will dig deeper into how that is designed, built and integrated with your current or new CI environment.
22
Role of the Software Consultant
… the ability to work as a group toward a common vision, even if that vision becomes extremely blurry On a poster Analyze Develop 1 2 3 4 Identify Coordinate
23
Analyze Identify Coordinate Develop
This template is great to emphasis the a key point, or as a transition slide. By changing the color of the shape, you can easily highlight the topic shown in the text box.
25
Content Document Lifecycle www.aiim.org Capture Manage Store Preserve
Deliver At this point, you’ve introduced the session overview/summary and can launch the software and continue your presentation from there. If there is a need to include data charts, examples are on the next slides.
26
Get the group together Project Admin Purchasing Project Manager
AP Clerk Project Manager
27
Questions to ask… Where are we saving it? How can we find it?
What are we capturing? How are we capturing it? Where are we saving it? How can we find it?
28
What do you ________? You CAPTURE MANAGE DELIVER
29
Capture What are we capturing?
30
Capture At this point, you’ve introduced the session overview/summary and can launch the software and continue your presentation from there. If there is a need to include data charts, examples are on the next slides.
31
Viewpoint Capture
32
Construction Imaging Capture
33
What Else? Data Data Data
34
What Data is Available?
35
Define Your List
36
Blueprints
37
Create the Viewpoint Integration
The Building Plan Create AX Application Create CI Content Type Create the Viewpoint Integration
38
Build the Application 1. Name the application
2. Assign the paths to the imaging server 3. Add the fields
39
Build the Application Field name needs to be consistent with other applications. Field structure needs to be consistent with other applications. Static fields are positions 1 – 16. Dynamic fields are positions 17- ?. Include timestamp field. Include Viewpoint management fields. Do not make any fields required.
40
Build the Application Field order Field name
41
This is what we have so far.
42
Build the Content Type 1. Select the Application you are connecting
2. Add the fields 3. Build lookups
43
Dynamic Dropdown List Lookup Keyword Calendar Static
Design Options Text Date Controlled Dropdown List Lookup Keyword Calendar Required At this point, you’ve introduced the session overview/summary and can launch the software and continue your presentation from there. If there is a need to include data charts, examples are on the next slides. Static
44
Finished Product
45
Viewpoint Integration
46
Viewpoint Integration
48
One Step at a Time
50
Things to remember Vantagepoint To view this presentation
Where do We Go From Here? Things to remember Vantagepoint To view this presentation Design Workbook CDM Builder Guide Administration Console User Guide
51
Questions? Although you should be fielding questions throughout the session, if time allows you can open this up again at the end. However, be sure to allow enough time for last two slides. If you get to this slide and have almost run out of time; simply say that you are out of time and go to the next slide that tells them how they can get additional questions answered. In addition to next slide resources, if you truly have a little time after the session, you can also invited them to visit with you. Questions?
52
Complete brief session survey now Complete post event email survey to
Reminders Complete brief session survey now Complete post event survey to access recordings This slide will remind the audience that CPE Credits are available for some presentations. This is also a subtle reminder that completing the post event survey gives them access to copies and recordings of all presentations.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.