2018 NAVSEA Standard Specifications for Ship Repair and Alteration Committee (SSRAC) Meeting 30 JULY – 03 AUG 2018 Preliminary Outbrief *As of 02 AUG 2018.

Similar presentations


Presentation on theme: "2018 NAVSEA Standard Specifications for Ship Repair and Alteration Committee (SSRAC) Meeting 30 JULY – 03 AUG 2018 Preliminary Outbrief *As of 02 AUG 2018."— Presentation transcript:

1 2018 NAVSEA Standard Specifications for Ship Repair and Alteration Committee (SSRAC) Meeting
30 JULY – 03 AUG 2018 Preliminary Outbrief *As of 02 AUG 2018

2 Environmental/Safety/Health (ESH)
35 total proposals 09 Adopted 08 Adopted/Modified 15 Not adopted 3 Other Highlights: No highlights

3 Hull/Preservation 137 Total Proposals 27 Adopted 43 Adopted/Modified
60 Not Adopted 7 Other Highlights: Removed 2 (G) checkpoints from NSI and a (V) checkpoint from NSI Reduced number of required chloride/conductivity readings by half for nonskid. Eliminated requirement for feathering unless directed by the SUPERVISOR. Increased MAX profile on ACEs to reduce number of required DFSs.

4 Machinery/QA 5 Adopted 25 Total Proposals Highlights:
7 Adopted/Modified 9 Not Adopted 4 Other Highlights: 009-04 Removed restriction on paperless QA records for paint. Removed statement that discouraged KTR pre-inspections. Removed requirement for KTRs to provide SSPC audit reports to the RMC eliminating 2 reports. 009-09 Reinstated requirement for submission of completed PCPs exclusive of Work Item completion. Avoids additional cost due to post work completion discovery. Avoids potential schedule impact. 009-13 Cleaned up language from merger of and Removed (V) checkpoint to “verify correct indication” – verified during optest.

5 4-E/Phraseology 91 Total Proposals 26 Adopted 17 Adopted/Modified
22 Not Adopted 26 Other Highlights: Incorporated Master Specification Work Templates Refined definitions of material types

6 Piping/Boiler 39 Total Proposals 31 Adopted 02 Adopted/Modified
06 Not Adopted 00 Other Highlights: PB reviewed 25 checkpoints, approved the elimination of 21, modified one, and maintained three checks. Didn’t recommend adopting 6 proposals but 3 of them were duplicates that were adopted. Reviewed and provided recommendations on 6 4E proposals.

7 Electrical/Electronics
37 Total Proposals 14 Adopted 13 Adopted/Modified 9 Not Adopted 1 Other Highlights:ex.. Deleted a total of 8 of 16 (V) Checkpoints and 7 of 13 (G) Checkpoints!

8 General (non-trade-specific issues)
46 Total Proposals 3 Adopted 15 Adopted/Modified 22 Not Adopted (4 duplicates) 6 Other No proposals from other groups Highlights: Excellent industry engagement and support (Compartment Closeout; accomplish) Modified checkpoint requirement with impact of approximately 15 checkpoints and associated reports per availability. (Schedule and Associated reports for Availabilities over 9 Weeks in Duration, Provide and Manage) incorporated Critical Path analysis, eliminated a significantly burdensome and duplicative weekly report. Addressed the incorporation of Small Boat concerns.

9 Steering Committee Action
410 Total Proposals 115 Adopted 105 Adopted/Modified 141 Not Adopted 43 Other (i.e., open action items) Highlights: 21 Action Items 48 Checkpoints deleted 10 (V) deleted 38 (G) deleted 2 Reports deleted Small boats, small crafts, service crafts incorporated into NSIs