Download presentation
Presentation is loading. Please wait.
Published bySusanti Tanuwidjaja Modified over 6 years ago
1
TGn Sync 2nd Confirmation Summary Update to TGn May 2005
doc.: IEEE /491r0 May 2005 TGn Sync 2nd Confirmation Summary Update to TGn May 2005 Date: Author Name Company Address Phone Syed Aon Mujtaba Agere Systems 555 Union Blvd., Allentown, PA 18109, USA Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Syed Aon Mujtaba, Agere Systems, et. al. Syed Aon Mujtaba, Agere Systems, et. al.
2
May 2005 doc.: IEEE /491r0 May 2005 Syed Aon Mujtaba, Agere Systems, et. al. Syed Aon Mujtaba, Agere Systems, et. al.
3
May 2005 doc.: IEEE /491r0 May 2005 Syed Aon Mujtaba, Agere Systems, et. al. Syed Aon Mujtaba, Agere Systems, et. al.
4
May 2005 doc.: IEEE /491r0 May 2005 Syed Aon Mujtaba, Agere Systems, et. al. Syed Aon Mujtaba, Agere Systems, et. al.
5
Abstract Summary of TGn Sync status for 2nd confirmation vote.
May 2005 doc.: IEEE /491r0 May 2005 Abstract Summary of TGn Sync status for 2nd confirmation vote. Syed Aon Mujtaba, Agere Systems, et. al. Syed Aon Mujtaba, Agere Systems, et. al.
6
Successful Confirmation
May 2005 Successful Confirmation TGn Sync commits to make the reported “guidance changes”. TGn Sync believes the fast path to a standard is achieve a successful 2nd confirmation vote. Syed Aon Mujtaba, Agere Systems, et. al.
7
Motivation for Adjournment
May 2005 Motivation for Adjournment Technical (TGn Solution) Positive feedback from straw polls indicated that TGn Sync proposal should change prior to a 2nd confirmation Schedule Resetting the process to 3 proposals will significantly delay the standard (6-8 months) Political (Merged Solution) Repeated attempts to meet were rejected by WWiSE No indication of good faith to contribute to a merger discussion (e.g., “Why Vote No”, doc ) Syed Aon Mujtaba, Agere Systems, et. al.
8
802.11n Ratification Schedule
May 2005 doc.: IEEE /491r0 May 2005 802.11n Ratification Schedule Jul’05 Mar ’05 Jan ’06 May ’06 Nov’06 Projected IEEE Milestones Sep ’05 Q1’07 Final Spec. Confirmation Vote >75% 1st Sponsor Ballot Sponsor Ballot complete >95% approval 1st WG Letter Ballot (goal > 90%) Down Selection Vote > 50% 1st Draft Spec 6 to 8 months delay best case Jan’06 Mar ’06 Sep ’05 Jul’06 May’07 Q4’07 Final Spec. Consequence of Failure Nov ’05 Down Selection Vote > 50% Confirmation Vote <75% 1st Draft Spec 1st WG Letter Ballot (Best Case) Sponsor Ballot complete >95% approval Down Selection Vote > 50% Conformation (Best Case (assumption) A Yes Vote avoids Delay! TGn needs to pull together to meet Q1’07 schedule Syed Aon Mujtaba, Agere Systems, et. al. Syed Aon Mujtaba, Agere Systems, et. al.
9
Plan for Confirmation Proposal Update
May 2005 Plan for Confirmation Proposal Update Simulations and Final Proposal to be completed after Cairns Continue to pursue discussions with WWiSE Plan for Confirmation Ad Hoc meeting with TGn members in June Resolve any issues Final Review Present Final Proposal for Confirmation in July Syed Aon Mujtaba, Agere Systems, et. al.
10
May 2005 Back-up Slides Syed Aon Mujtaba, Agere Systems, et. al.
11
Progress Since Atlanta
May 2005 Progress Since Atlanta Joint Proposal Efforts Since Atlanta, TGn Sync has aggressively pursued a Joint Proposal with WWiSE TGn Sync has offered major concessions to WWiSE TGn Sync continues to offer a simple, reasonable way to get started that shows good faith on the part of both parties Clean sheet One vote/company, 66% passes Commitment to regular technical working sessions Announcement of the joint effort to TGn Syed Aon Mujtaba, Agere Systems, et. al.
12
Progress: March – May 2005 Technical Improvements Shortened Preamble
Reduced Number of MCS modes Made Calibration optional Basic & Advanced Modes merged into one TxBF Mode Enhanced support for power-saving in handsets – MMP Simplified Reverse Direction Method Substantially cleaned-up and simplified the technical spec MAC sections Syed Aon Mujtaba, Agere Systems, et. al.
13
May 2005 Progress: This week Completed presentation of “Reasons and Cures” responses 381 Comments Gathered guidance from TGn Conducted several straw-polls Listened to TGn feedback on proposal Syed Aon Mujtaba, Agere Systems, et. al.
14
TGn Guidance: PHY Add support for single antenna devices Add STBC
May 2005 TGn Guidance: PHY Add support for single antenna devices Assuming FR2 Change Add STBC Add signaling of beamforming capabilities Syed Aon Mujtaba, Agere Systems, et. al.
15
TGn Guidance: MAC Simplifications
May 2005 TGn Guidance: MAC Simplifications Replace 3-way handshake with 1-way simple grant Replace Pairwise Spoofing with an alternative Remove negotiation of number of MSDUs in the bitmap at BA setup time Remove BA state restriction Remove implicit BAR mechanism Add RIFS PPDU bursting feature Syed Aon Mujtaba, Agere Systems, et. al.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.