Presentation is loading. Please wait.

Presentation is loading. Please wait.

ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto

Similar presentations


Presentation on theme: "ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto"— Presentation transcript:

1 ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
TRIUMF UBC Victoria York 33 University/Lab.physicists Over 88 people, including Engineers, Technicians, Students Includes 3 IPP Research Scientists Educational Role 20 UG Summer Students 21 Graduate Students 13 Post Docs Focus on Liquid Argon Calorimetry 4 NSERC Funded Construction Projects Endcap Hadronic Calorimeter Forward Hadronic Calorimeter Front-End-Board Electronics Endcap Signal Cryogenics Feedthroughs Construction completed last year End of Installation this year Commissioning in 2006 Ongoing/Future Activities Analysis of Beam Tests Calorimeter Calibration Preparation for Physics Event Filter Algorithms/Ops Computing - soft/hard Beam Condition Monitors 11/16/2018

2 Why Is It Called a Calorimeter?
Liquid Argon/Metal Charged Particle Kinetic Energy of Particle Converted to Ionization Of Liquid Argon Electrical Signal Proportional to Incoming Energy Why Is It Called a Calorimeter? Readout Electronics 11/16/2018

3 Calorimeters as Physics Tools
Forward Jet Identification

4 University of Victoria
Cryogenic Signal Feedthroughs Over 180k signal channels in the LAr calorimeter High density and reliability required: 1920 pins per feedthrough unit University of Victoria TRIUMF 11/16/2018

5 Hadronic Endcap Calorimeter
Front Wheel 2 Front and Rear Modules Rear Wheel Wheel Assembly Composed of 2 wheels per end Front wheel:67 t 25 mm Cu plates Back wheel:90 t 50 mm Cu plates TRIUMF, Alberta 11/16/2018

6 HEC 2 A-wheel on the insertion stand, Aug. 2004
11/16/2018

7 Tungsten-Copper Internal Structure
Forward Calorimeter Four Modules Each 0.9 m Diam, 0.45 m long Total 20 Tonnes Tungsten Carleton, Toronto FCAL1 FCAL3 FCAL2 Plug3 Completed Module Tungsten-Copper Internal Structure 11/16/2018

8 LAr Forward Calorimeters
FCAL Carleton, Toronto 11/16/2018

9 Will see cold test in B180 EndCap A HEC in Cryostat FCAL 11/16/2018

10 EndCap C … Final Integration
Already cold tested in B180. Will see at Point 1 11/16/2018

11 Calorimeter Readout Electronics
Switched Capacitor Array SCA Controller Microelectronics development and testing at ALBERTA 11/16/2018

12 Trigger, DAQ and Detector Control
Calo MuTrCh Other detectors 40 MHz 40 MHz 75 kHz ~2 kHz ~ 200 Hz LV L1 D E T R/O Read-Out Drivers FE Pipelines Read-Out Sub-systems Read-Out Buffers Read-Out Links 2.5 ms LVL2 ~ 10 ms ROIB L2P L2SV L2N RoI RoI data = 1-2% requests Lvl1 acc = 75 kHz ROD ROD ROD 120 GB/s ~ 300 MB/s ~2+4 GB/s ROS GB/s ROB H L T D A T F L O W RoI Builder L2 Supervisor L2 N/work L2 Proc Unit EB SFI EBN DFM Lvl2 acc = ~2 kHz Event Building N/work Dataflow Manager Sub-Farm Input Event Builder EFN SFO Event Filter EFP ~ sec ~4 GB/s EFacc = ~0.2 kHz Event Filter N/work Sub-Farm Output Event Filter Processors Alberta, McGill 11/16/2018

13 TDAQ Setup in Combined Test Beam
LVL1 DFM gateway in bdg.513 SFI Tracker Calo Muon det. LVL1 calo ROS RPC TGC CSC LVL1 mu Tile TRT SCT Pixel LAr MDT monitoring run control pROS data network (GbE) MAGNI farm in bdg. 513 SFO remote farms storage CASTOR (IT) LVL2 farm in H8 EF farm Compared to ATLAS ~10% of DAQ ~2% of HLT just counting PCs… ALBERTA 11/16/2018


Download ppt "ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto"

Similar presentations


Ads by Google