Download presentation
Presentation is loading. Please wait.
1
2018 COSCDA Program Managers Meeting
Texas CDBG 2018 COSCDA Program Managers Meeting
2
CDBG Appropriation Breakdown
30% of total Appropriation goes to States. For 2017, approx 7% of the non-entitlement set-aside was allocated to Texas.
3
Balance of State
4
TxCDBG Method of Distribution
5
Reliable Funds for Rural Texas
Common Project Types: Water and Wastewater Improvements Street Improvements Drainage Structures Community Facilities / Buildings
6
Uhland Water Loop Population: 895 LMI Percentage: 71%
Annual Budget: $625,000 Austin-San Antonio Corridor
7
Uhland Water Loop City served by one main water line and
A few smaller lines don’t provide adequate supply and pressure Transmission line issues affecting main line - no safe drinking water
8
Uhland Water Loop CDBG funding $275,000 in 2013 $275,000 in 2016
Over 3 miles of 8” water line to create looped system Add’l local funding, improvements for anticipated development
9
Uhland Water Loop Challenges Easement acquisition in agricultural area
Small construction company – owner passed away Construction coordinated with separate FEMA mitigation project
10
Innovative Response to Specific Challenges
Economic Development Small Business loan funds Job Training
11
Innovative Response to Specific Challenges
Rural Healthcare Public Facilities Public Service Equipment
12
Response to Specific Challenges (Long Standing Programs)
Disaster Relief Events declared by President or Governor Repair or Replace what was damaged
13
Response to Specific Challenges (Long Standing Programs)
CEDAP House-to-Line connections State Legislative appropriation rider Partners with other federal and state funding Hidalgo County
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.