Download presentation
Presentation is loading. Please wait.
1
System Development Life Cycle
Building the MIS System Development Life Cycle
2
SDLC Models The Waterfall Model Prototype Model The Spiral Model
3
Final SDLC Maintenance Cycle Testing Cycle Systems Investigations
Analysis Systems Design Systems Implementations Systems Maintenance Product: Feasibility Study Product: System Requirements Product: System Specifications Product: Operational System Product: Improved System
4
Problems associated with the Waterfall Model…
Real Time Projects Uncertainty about requirements Long Procedure
5
Prototype Model Developed on the assumption that it is often difficult to know all of your requirements at the beginning of a project.
6
Various steps involved in Prototype Model:
Requirements Definition/Collection Design Prototype Creation/Modification Assessment Prototype Refinement System Implementation
7
Problems associated with the Prototype Model
Prototyping can lead to false expectations. Prototyping can lead to poorly designed systems.
8
The Spiral Model Project Objectives Risk Assessment
Customer Communication Planning Risk Assessment Engineering & Production Construction & Release Planning and Management Customer Evaluation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.