Annual Performance Plan Presentation – 2018/19 29 May 2018

Similar presentations


Presentation on theme: "Annual Performance Plan Presentation – 2018/19 29 May 2018"— Presentation transcript:

1 Annual Performance Plan Presentation – 2018/19 29 May 2018
Director-General - Mr. M. Tshangana

2 Departmental Strategic Performance Measures
Priority Programmes focused on achieving the objectives of the NDP and MTSF will be focus of attention in terms of monitoring, evaluation and active management by the Department. Programme Delivery Technical Expertise will be contracted in to ensure current poor performance in the Mining Towns, Catalytic Projects and Land and Property Acquisition and Development, with Entities, Municipalities and Provinces. Active, Strict, Developmental Management and Compliance to be applied to application of Departmental Capital Grants to ensure prioritisation and impact – Proposed that poor performance will result in reallocations in second quarter of the financial year Focused support to Provinces and Municipalities to improve Provincial and Municipal Contract Management Based on recommendations of the Auditor-General emphasis will be placed on monitoring completeness, controls and verification of performance information 11/17/2018

3 Departmental Strategic Performance Measures
Momentum to improve Department Capacity will continue with finalisation of filling of vacancies and contracting-in of capacity support. Focused and improved programme and project risk management based on the prioritisation of risk management as a performance improvement tool. Focused emphasis on the capacity and technical support provided to the Provinces, Municipalities and Entities to ensure achievement of MTSF targets – NUSP, HDA, SHRA Capacity Grants and NHBRC Contractor Training and Support and NURCHA and NHFC Financial support. Coordinated effort with Parliament to pass the Property Practitioners Bill, Housing Consumers Protection Measures Amendment Bill and Home Loans and Mortgage Disclosure Amendment Bill. Measures and mechanisms to improve intergovernmental planning and contracting. Resource optimisation in management will result in improved monitoring and reporting on targeted procurement related to Women, Youth, Military Veterans and Persons Living with Disabilities 11/17/2018

4 Departmental Strategic Performance Measures
As part of the new DPSA requirements/expectations; 60% of performance of Branch Manager will be linked to individual performance, 20% will be directly linked to the Performance of the Department and 20% will be linked to compliance and regulation . All Branch Managers are expected to ensure that their operational Plans are linked to the Departmental Annual Performance Plans and Strategic Plan- The Departmental Operational Plans are signed off by the Accounting Officer to ensure implementation of the Strategic and Annual Performance Plans. The activation of the Title Deeds Restoration Grant will now allow the Department to better improve accountability and consequence management over poor performance in the Provinces, for the Programme. The Emergency Housing Grant allows the Minister to ensure agile, responsive and immediate measures to settlements and households which are impacted by fire, wind, flooding and other natural catastrophic events The Department will coordinate the development of MTSF. 11/17/2018

5 Policy, Legislative and Regulatory Overview
The following are the Department policy and legislative priorities for 2018/19: Development of the Human Settlements Code Amendment of the Housing Act to Human Settlements Legislation Repealing the Housing Consumer Protection Measures Act Human Settlement Development Bank Bill Amending the Prevention of Illegal Evictions and Unlawful Occupation of Land Act Revision of the Social Housing Policy and Regulations Policy Review and Evaluations Development of a Policy Framework for the Human Settlements Ombud. 11/17/2018

6 Summary of Strategic and Annual Performance Targets Per Programme
Strategic Plan Target Strategic Plan targets APP Targets Consolidated Targets Programme 1 4 9 13 Programme 2 3 8 11 Programme 3 21 24 Programme 4 1 Grand Total 10 46 57

7 Strategic Plan Priorities –Objectives and Targets Programme 1
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Enhanced efficiency and effectiveness To promote efficient and effective administrative processes Unqualified audit opinion with no matters of emphasis unqualified audit opinion 2017/18 with no matters of emphasis 2018/19 with no matters of emphasis 2019/20 with no matters of emphasis 100 % compliance with statutory tabling and prescripts 100% implementation of the approved internal audit plan 100% implementation of the approved risk management plan 11/17/2018

8 Strategic Plan Priorities –Objectives and targets Programme 1
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Enhanced efficiency and effectiveness To promote efficient and effective administrative processes Unqualified audit opinion with no matters of emphasis 100% implementation of approved anti-fraud and corruption plan 100% implementation of approved anti-fraud and corruption plan 100% of the annual Human Resource Plan implemented Effective and efficient legal support Comprehensive Human Settlement Legislation developed Development of Human Settlements Development Bank, Development of Human Settlements, Development of PIE Amendment, Development of Property practitioners, Development of Housing Consumer Protection and Development of The Home Loan and Mortgage Disclosure Amendment Bills of 2018   Regulations for Human Settlements legislation developed To provide effective dispute resolution services 100% of disputes lodged investigated within 90 days 100% of lodged disputes investigated within 90 days 11/17/2018

9 Strategic Plan Priorities –Objectives and Targets Programme 1
Enhanced efficiency and effectiveness To provide ICT infrastructure that is reliable, secure and available Integrated information and communication technology services provided 90 percent availability of HSS Database Systems to provinces 90 percent availability of HSS Database Systems to provinces 90% Availability of secured ICT services 90% Availability of secured ICT services 11/17/2018

10 Strategic Plan Priorities –Objectives and Targets Programme 2
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Integrated and responsive human settlements sector policy environment To develop evidence based policies and programmes Policy framework for Human Settlements developed A policy Framework for Human Settlements developed: Human Settlements Ombudsman Policy framework for Human Settlements developed Programmes in the code revised Human Settlements code developed No target 3 Researches to support policy development conducted To establish partnerships to support the delivery of Human Settlements sector priorities National Human Settlements development plan developed Approved National Human Settlements Development Plan (HSDG funded) 11/17/2018

11 Strategic Plan Priorities –Objectives and Targets Programme 2
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Integrated and responsive human settlements sector policy environment To establish partnerships to support the delivery of Human Settlements sector priorities National Human Settlements development plan developed Urban Settlement Development plan for Metropolitan municipalities developed (USDG funded) Urban Settlement Development plan for Metropolitan municipalities developed (USDG funded) Increased participation of stakeholders in human settlements development 14 partnerships mobilised towards human settlements development 6 initiatives on international cooperation aligned to Human Settlement priorities serviced 32 intergovernmental fora coordinated in line with human settlements priorities 11/17/2018

12 Strategic Plan Priorities –Objectives and Targets Programme 3
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Provide implementation support on the delivery of sustainable human settlement 9 Provinces supported on the implementation of human settlements programmes Project Readiness Matrix implemented in 9 provinces Provide support on the implementation of catalytic programme Provide implementation support to the Revitalization of Distressed Mining Communities Program 11/17/2018

13 Strategic Plan Priorities –Objectives and Targets Programme 3
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Provide implementation support on the delivery of sustainable human settlement 9 Provinces supported on the implementation of human settlements programmes 477 informal settlements assessed (Feasibility studies conducted) 200 informal settlements assessed (Feasibility studies ) 200 informal settlements assessed (Feasibility studies conducted) 500 Informal settlement upgrading plans developed plans 554 Informal settlement upgrading plans developed 9 provinces and 8 metros supported in implementing the informal settlements upgrading programme 11/17/2018

14 Strategic Plan Priorities –Objectives and Targets Programme 3
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Provide implementation support on the delivery of sustainable human settlement 9 Provinces supported on the implementation of human settlements programmes 9 provinces supported in implementing the subsidy housing programme 9 provinces supported in implementing the housing subsidy programme Provide support on the implementation of private affordable rental housing Provide support on the implementation of Social Housing programme Provide support on the implementation of Social Housing programme Provide support on the implementation of social housing programme 11/17/2018

15 Strategic Plan Priorities –Objectives and Targets Programme 3
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Provide implementation support on the delivery of sustainable human settlement 9 Provinces supported on the implementation of human settlements programmes Provide support on the delivery of Community Residential Units Multiyear land assembly plan for human settlement development plan compiled Multiyear land assembly plan for human settlement development plan reviewed 9 Provinces supported in the implementation of the Title Deeds restoration programme (Pre and Post 1994) 11/17/2018

16 Strategic Plan Priorities –Objectives and Targets Programme 3
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Provide implementation support on the delivery of sustainable human settlement 9 Provinces supported on the implementation of human settlements programmes 9 Provinces supported in the implementation of Title Deeds programme (from April 2014) Nine (9) Provinces supported in the delivery of 1000 housing opportunities to Military Veterans Nine (9) Provinces supported to deliver 1000 housing opportunities to Military Veterans Nine (9) Provinces Supported to deliver 1000 housing opportunities to Military Veterans 7 Provinces and 6 Metros supported in the implementation of PHP Policy 8 Provinces and 7 Metros supported in the implementation of PHP Policy 9 Provinces and 8 Metros supported in the implementation of PHP Policy 11/17/2018

17 Strategic Plan Priorities –Objectives and Targets Programme 3
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Provide implementation support on the delivery of sustainable human settlement 9 Provinces supported on the implementation of human settlements programmes Operational integration implemented Single DFI established (Human settlements development bank) No target Improved support and capacity for the human settlements sector 9 provincial departments supported in the implementation of Human Settlements apex Programmes 9 Provincial departments supported in the implementation of Human Settlements apex Programmes 560 practitioners trained in human settlements Programmes 300 practitioners trained in human settlements Programmes 11/17/2018

18 Strategic Plan Priorities –Objectives and Targets Programme 3
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Improved support and capacity for the human settlements sector 9 provincial departments supported in the implementation of Human Settlements apex Programmes 75 youth supported through scholarship programme Enhanced sector monitoring and evaluation 8 Evaluation studies completed 100% of projects under implementation monitored and verified (HSDG and USDG) 1 evaluation study (UISP three year impact) completed 1evaluation study initiated 1 Evaluation study to completed 1 evaluation study initiated 1 Evaluation study completed 11/17/2018

19 Strategic Plan Priorities –Objectives and Targets Programme 4
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Efficient and effective utilization of human settlements grants Approved human settlements grants framework 4 HSDG & USDG quarterly performance assessments conducted 30% of the HSDG construction budget allocated to designated groups as per the Regulation 30% of the USDG construction budget allocated to designated groups as per the Regulation 11/17/2018

20 Strategic Plan Priorities –Objectives and Targets Programme 4
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Efficient utilization of human settlements grants Approved human settlements grants framework 4 FLISP performance assessments conducted 4 Assessments on the volume of loans granted by DFIs for the affordable housing market conducted Bi-annual assessments of employers’ contribution towards Employer Assisted Housing 11/17/2018

21 Strategic Plan Priorities –Objectives and Targets Programme 4
Strategic Goals Objectives (High level output) Strategic Plan target Related targets Increased delivery of adequate housing in sustainable Human Settlements Efficient utilization of human settlements grants Approved human settlements grants framework Annual performance analysis of financial institutions on their lending patterns conducted Annual performance analysis of financial institutions on their lending patterns on home loans conducted 4 performance assessments on the Office of Disclosure 4 performance assessments on the Office of Disclosure 11/17/2018

22 Departmental Budget 2018/19 11/17/2018

23 Adjusted Appropriation Medium Term Expenditure estimates Indicative
Departmental Budget 2018/19 Programmes Audited Outcome Adjusted Appropriation Medium Term Expenditure estimates Indicative R`000 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 Administration Human Settlements Policy, Strategy and Planning 78 703 75 738 86 600 93 573 89 781 95 966 Human Settlements Delivery Support Housing Development Finance Total 11/17/2018

24 MTEF Budget Overview 2018 MTEF period 2017/18 R`000 2018/19 2019/20 2020/21 MTEF Total Departmental Baseline from 2017 & 2018 MTEF Net Reduction ( ) ( ) ( ) ( ) Revised Baseline Allocation Departmental baseline has been reduced by R10.8 billion. The 2018/19 budget allocation is thus less than the 2017/18 allocation. The following funds were reprioritized through the HSDG over the MTEF: Title Deeds Restoration operational support – R95.1 million; Municipal Emergency Housing Grant – R447.8 million; Provincial Emergency Housing Grant – R831.7 million; Title Deeds Restoration Grant – R1.64 billion.

25 MTEF Allocation by Economic Classification
2018 MTEF PERIOD Total Allocation R`000 2017/18 2018/19 2019/20 2020/21 Departmental Operational Compensation of employees Goods and services Payment for Capital assets 5 685 5 978 6 303 6 650 Payments for financial assets 80 000 50 000 - National Housing Finance Corporation Rural Housing Loan Fund Grants and transfer payments Grants Human Settlements Development Grant Urban Settlements Development Grant Municipal Emergency Housing Grant Provincial Emergency Housing Grant Title Deeds Restoration Grant Entities Social Housing Regulatory Authority: Operational 46 815 51 980 55 201 58 237 Social Housing Regulatory Authority: Institutional Investment 20 490 20 132 21 259 22 428 Social Housing Regulatory Authority: Restructuring Capital Grant Social Housing Regulatory Authority: Regulations 8 000 10 000 10 560 11 141 Community Schemes Ombuds Services 29 400 31 105 32 847 34 654 Housing Development Agency Departmental Transfers 12 640 11 787 12 447 13 132 Bursaries Scheme 9 822 6 892 10 974 11 578 UN Habitat 1 272 1 346 1 421 1 499 Nelson Mandela Metropolitan University 3 500 Transfer to Households (e.g. leave gratuity and donations to households ) 46 49 52 55 Total

26 Human Settlements Development Grant
2018 MTEF PERIOD Provinces R`000 2017/18 2018/19 2019/20 2020/21 Eastern Cape Free State Gauteng Kwazulu-Natal Limpopo Mpumalanga Northern Cape North West Western Cape Total

27 Urban Settlements Development Grant
2018 MTEF period Provinces Metros 2017/18 2018/19 2019/20 2020/21 EASTERN CAPE Buffalo City Nelson Mandela Sub Total FREE STATE Mangaung GAUTENG Ekurhuleni Jo'burg Tshwane KWAZULU-NATAL eThekwini WESTERN CAPE Cape Town Grant Total

28 Title Deeds Restoration Grant
Provinces R`000 2018/19 2019/20 2020/21 Eastern Cape 65 583 69 250 73 056 Free State 50 187 52 993 55 905 Gauteng Kwazulu-Natal Limpopo 22 506 23 764 25 070 Mpumalanga 51 734 54 626 57 628 Northern Cape 20 364 21 503 22 685 North West 50 687 53 521 56 462 Western Cape 50 361 53 177 56 099 Total

29 Emergency Housing Conditional Grants
The grants provide funding to Provinces and Municipalities to assist households affected by disaster through: Provision of temporary shelter Temporary relocation of households to safer accommodation and/ or shelter The grants is managed in terms of the Division of Revenue Act DORA. The grant allocations are: Total allocation R`000 2018/19 2019/20 2020/21 Municipal Emergency Housing Grant Provincial Emergency Housing Grant

30 Support Provided to the Sector in Delivering MTSF Priorities and Related Budget
11/17/2018

31 Summary of the MTSF Targets – Provincial and Municipal Business Plans
Planned Sites 2018/19 Planned Units 2018/19 Total Target Site & Units UISP - HSDG 35 547 37 514 73 061 Individual Units 24 589 43 683 68 272 Social CRU 1 888 FLISP 16 870 Total MTSF 60 136 99 955 11/17/2018

32 Summary of the MTSF Targets HSDG Business Plans Per Province
11/17/2018

33 Metropolitan Municipalities
Metropolitan Cities Total Sites Total Units Buffalo City 448 1 230 Nelson Mandela Bay 2 190 Mangaung 860 1 587 COJ 1 484 1 570 City of Tshwane 1 787 4 848 Ekhuruleni 2 736 3 568 Ethekeni 2 080 4 796 City of Cape Town 2 536 5 295 Total 11 931 25 084 11/17/2018

34 Entities 11/17/2018

35 National Housing Finance Corporation
1 630 housing opportunities facilitated through disbursements 826 rental housing opportunities facilitated through disbursements 205 affordable housing opportunities facilitated through disbursements 3 973 housing opportunities facilitated through leveraged funds R782m leveraged from the private sector. 11/17/2018

36 Estate Agency Affairs Board
75% of compliant registered estate agents 14 million consumers reached through radio awareness campaigns 10% of compliant estate agents operating in affordable housing markets 1 000 youth placed with host employers Fidelity Fund Net Asset Value 1.25% per annum 10% increase in Estate Agencies operating in the affordable housing market -30% over MTSF period 11/17/2018

37 National Home Builders Registration Council
non-subsidy homes by private sector enrolled subsidy homes enrolled non-subsidy enrolled homes inspected subsidy homes enrolled inspected 3 201 new homebuilder registrations approved 11/17/2018

38 National Home Builders Registration Council
renewals of homebuilder registrations 2 000 homebuilders trained 2 000 youth trained 500 home inspectors trained 400 Artisans trained 1 800 women trained 450 Military Veterans trained 300 people with disabilities trained 11/17/2018

39 Housing Development Agency
3 000 hectares of well-located land released for human settlement development 1 000 hectares released and rezoning of land 5 722 sites serviced 7 168 housing units provided 11/17/2018

40 NURCHA 1 365 affordable houses built and sites serviced with NURCHA bridging finance subsidy houses built and sites serviced with NURCHA bridging finance 2 Infrastructure and community facility projects completed with NURCHA bridging finance 37 Contractors trained through the Contractor Finance and Development Programme 11/17/2018

41 Rural Housing Loan Fund
housing loans disbursed 60% of loans provided to people earning R3,500 or less per month R million disbursed to retail intermediaries 30% loans issued to women by 2019 20% of loans issued to people earning over R15 000 100% of clients visited for loan verification 11/17/2018

42 Social Housing Regulatory Authority
Units approved for Restructuring Capital Grant Award Social housing units delivered units under regulation 95% expenditure of the Consolidated Capital Grant 11/17/2018

43 Community Schemes Ombud Service
community schemes registered 1 500 governance documentation quality assured 70% of disputes resolved through conciliation 2 Additional CSOS points of presence established 11/17/2018

44 Thank You 11/17/2018


Download ppt "Annual Performance Plan Presentation – 2018/19 29 May 2018"