1 Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan
Matt Tunnard, PE, Ford Land Donald Carpenter, Ph.D, PE, LEED AP David Anthony, PLA, ASLA

2 Campus Master Plan Highlights
2 Campus Master Plan Highlights Smith Group JJR Dearborn Campus Transformation Master Plan – 2016 Guiding Principles – Served as the Basis for setting the vision and implementation framework: Campus Environment Connectivity Workplace Sustainability Growth Add Image – from Master Plan Document Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

3 Campus Master Plan Highlights
3 Campus Master Plan Highlights Master Plan Strategies Differentiation Strategy Programmatic Strategy Workplace and Mobility Strategy Sustainability Strategy Placemaking and Connectivity Strategy Change Management Strategy Sustainability Goals Improve Energy Efficiency Improve Air Quality Improve Water Efficiency Improve Soil Quality Using, recycling, and diverting materials & waste Advancing health and wellness goals Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

4 Research & Engineering Campus

5 Ford Dearborn Campus - Research & Engineering Campus

6 Summary of Stormwater Modeling Required
6 Summary of Stormwater Modeling Required Area LEED Version Storm Event 1-yr 24-hr (1.87”) 2-yr 24-hr (2.26”) 98th Percentile (1.67”) 100-yr 24-hr (4.36”) R&E Campus N/A Historic & Future (Volume) Historic & Future (Rate) LEED Campus W. Sub-Basin V3 Historic & Future (Volume & Rate) LEED Campus N. Sub-Basin V4 Future (Volume) LEED Campus E. Sub-Basin CEP DDL Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

7 Base Map Exhibit for Historic Modeling

8 Green Stormwater Infrastructure
8 Green Stormwater Infrastructure Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

9 Stormwater Design Criteria
9 Stormwater Design Criteria Overall Site Guideline: Manage stormwater where it falls and ensure water leaving the site meets pre- development conditions Insert Development Character Image From Master Plan Document Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

10 Key Stormwater Design Targets
10 Key Stormwater Design Targets Improve water quality in addition to appropriate detention; Achieve a Water Score of 100%, where 100% = the pre-settlement baseline runoff rate; Capture rainwater on-site; Remove 80% of the average annual post-development TSS for discharges; Increase the total acreage planted with native or adaptive species by 200%; Utilize detention and green infrastructure to meet these targets. Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

11 REC Master Plan Basis for Design
11 11 REC Master Plan Basis for Design Develop design standards and templates for detention and GI practices Document how stormwater management practices meet master plan targets Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

12 REC Stormwater Master Plan Products
12 REC Stormwater Master Plan Products Stormwater Design and Phasing Plan Stormwater Model of Pre and Post Conditions Landscape Master Plan Adaptive Model Framework O & M Manual for all BMP’s On-site Monitoring and verification plan LEED Credit Plan Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

13 Stormwater Volume and Detention Criteria
13 Stormwater Volume and Detention Criteria City of Dearborn Pre-Development Runoff Rate – 0.55 CFS/Acre for the 100-Year/ 24-hour runoff rate DCT Master Design Criteria for Water Score 100 – Capture Runoff Volume from the 2-year/24-Hour Rain Event LEED Goals for Capturing the 98% Recurrence Interval Rain Event Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

14 Stormwater Volume and Detention Criteria
14 Stormwater Volume and Detention Criteria City of Dearborn Pre-Development Runoff Rate – CFS/Acre for the 100- Year/ 24-hour runoff rate Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

15 Stormwater Capture Volume
15 Stormwater Capture Volume Integrated Design has yielded innovative solutions. Combine structural BMP’s with Green BMP’s. Landscape solutions that meet stormwater design criteria and aesthetic and functional design goals. Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

16 Considerations: Material hydrologic properties
Haydite BioBlend Haydite C & Haydite H 6A Stone Porosity 0.52 0.64 0.35 Field Capacity 0.38 0.20 0.06 Wilting Point 0.08 0.00 Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

17 On-going Design Requirements
17 On-going Design Requirements Master Stormwater Hydrologic Model; Stormwater Design Phasing; Landscape Master Plan; O & M Manual Monitoring and Verification Plan LEED Credit Plan Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan

18 Questions? Ford Dearborn Campus Transformation: Green Stormwater Infrastructure Master Plan