Presentation is loading. Please wait.

Presentation is loading. Please wait.

GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)

Similar presentations


Presentation on theme: "GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)"— Presentation transcript:

1 GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)
Expert team on WIS centres ET-WISC Melbourne, Australia April 2016 WMO. ET-WISC 2016

2 GISC Washington Area of Responsibility (RA IV) Operation of GISC
Operation of RTH Capacity Building RA IV Metadata workshop in Barbados Coordination and work with DCPCs Coordination and continued work with RA IV NC’s. ET-WISC 2016

3 GISC Washington Network connection migration to Internet to provide increased capacity and meet US Government IT security requirements Involvement with Open-WIS activities Build out of new IT infrastructure for Met operations to provide a very high reliability for operations and reduction in duplication of effort ET-WISC 2016

4 Thank you for your attention
Robert BUNGE, ET-WISC 2016


Download ppt "GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)"

Similar presentations


Ads by Google