Download presentation
Presentation is loading. Please wait.
1
Hamburg Bonding Report
Georg Steinbrück Hamburg University CMS Meeting June 2004 Report from Hamburg Pull tests stats Loop heights ARC tests G. Steinbrück June 2004
2
Bonding in Hamburg Hamburg was recently officially certified for bonding Sent 3 modules to CERN for inspection Have bonded 37 Modules in Hamburg so far 8 R1N 13 R1S 16 R3 20 more modules HV bonded Throughput impacted by Need to support sensors under HV bonds by inserting capton tape Pull tests: Basically increases bonding time x2 HV and Sensor Bonding in two steps G. Steinbrück June 2004
3
Experience Initially had a lot of trouble with the HV bonds and outer sensor bonds since sensor not well supported in this area Went through some trouble building a good bonding jig Had glueing scheme for frame adjusted: Glue spots carbon-capton and capton-sensor were NOT aligned, now alignedResults look much better, but additional support still needed Some PA‘s were not glued parallel, making bonding hard We gave feedback to gantries, problems known/solved G. Steinbrück June 2004
4
Module 30200020029287 One recent example of a glueing problem
G. Steinbrück June 2004
5
Pull Test Results PA test Area
R1N R1S R3 Based on 30 modules. G. Steinbrück June 2004
6
Pull Test Results 50th wire PA-Sensor
R1S R1N R3 Based on 30 modules. G. Steinbrück June 2004
7
Loop heights PA test bonds PA-sensor bonds 280 mus ~30 deg 1mm 30 deg
Sorry, no pictures... G. Steinbrück June 2004
8
ARC tests ARCS 7.0 with TIB one sensor cuts (except for noise cuts For R1) Xml files with Xflag 4.2 G. Steinbrück June 2004
9
ARC tests: Cuts Correct R1 cuts by difference in noise means
G. Steinbrück June 2004
10
Statistics details… 37 Modules bonded in HH, 30 tested 32019
22 grade A, 4 grade C no new pinholes found 7 faulty modules 3/131 fail initial ARC fast test 32019 Sent out w/o full test bent hybrid bonds, in bond center for repairNot fully tested root file? G. Steinbrück June 2004
11
Fault stats Ring 3 G. Steinbrück June 2004
12
Fault stats Ring 1 G. Steinbrück June 2004
13
IV curves R1 and R3 Module already had high current before PA-Sensor bonding. Graded AF (IMOD>5xISen) G. Steinbrück June 2004
14
Test Results on the Web Thanks to Marko Dragicevic (Wien) for supplying the scripts! G. Steinbrück June 2004
15
Web G. Steinbrück June 2004
16
Summary Bonded and tested 37 modules +20 modules HV bonded
Bonding rates are increasing Quality of gluing of modules is critical and has improved Pull test results look goode ARC tests + uploading to db routine now 4 grade C modules G. Steinbrück June 2004
17
Backup G. Steinbrück June 2004
18
Module 30200020032011 Bad APV Cosmic run Two events in a cosmic run
Difference max and min PH in ARC LED test G. Steinbrück June 2004
19
Module (R1S) 38 Difference max and min PH in ARC LED test Mean pedestal versus pipeline for bad APV G. Steinbrück June 2004
20
Module 30200020032019 Difference max and min PH in ARC LED test
Mean pedestal versus pipeline for bad APV G. Steinbrück June 2004
21
Module 38 G. Steinbrück June 2004
22
ARC testing in Hamburg 30 Modules bonded and tested
22 grade A, 4 grade C no new pinholes found 7 faulty modules 3/131 fail initial ARC fast test 30 Modules bonded and tested Using ARCS 7.0 and Xflag 4.2 Keeping up with database G. Steinbrück June 2004
23
Bonding in Hamburg R1N R1S R3 30 Modules bonded
initial issues with HV bonds/glue resolved G. Steinbrück June 2004
24
Currents before and after Sensor Bonding
G. Steinbrück June 2004
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.