Presentation is loading. Please wait.

Presentation is loading. Please wait.

Employ the Deployed Theater Accountability System (DTAS)

Similar presentations


Presentation on theme: "Employ the Deployed Theater Accountability System (DTAS)"— Presentation transcript:

1 Employ the Deployed Theater Accountability System (DTAS)
July 2015

2 Starting Right I M P O R T A N C E O F A C C U R ? C Y

3 Learning Objective Action: Employ Deployed Theater Accountability Software (DTAS) Condition: Mid-grade HR Leaders in a classroom environment working individually and as a member of a small group, using doctrinal and administrative publications, practical exercises, case studies, personal experience, handouts, discussion and with an awareness of the Operational Environment (OE) variables and actors. Standard: Application includes: 1. Navigation of DTAS functions. 2. Performance of a Mass Add.

4 Introduction to DTAS (1 of 3)
DTAS is the standard Army system for deployed personnel accountability The DTAS application is a software package designed to account for military and civilian personnel in a deployed theater by NAME, UNIT, LOCATION, and DATE DTAS is comprised of three (3) distinct levels or sub-systems and they are: Mobile System Level (User Level) Major Command Level ( formerly Theater Level) Enterprise Level

5 Introduction to DTAS (2 of 3)
DTAS is the “vehicle” to capture what the Commanders and 1SGs know DTAS resolves the by-name accountability deficiency that currently exists in Operation Iraqi Freedom (OIF), Operation Enduring Freedom (OEF) and the Horn of Africa (HOA) DTAS is the cornerstone of accurate accountability of the deployed force 5

6 Introduction to DTAS (3 of 3)
To Add Personnel or Mass assign within the DTAS System, users must upload one of the following files: TPS (TRN) eMILPO (XML) or Excel (CSV) Load File. 6

7 SCENARIO You are the HR Specialist currently assigned to the HHC, 1st Brigade Combat Team, 4th Infantry Division and the unit is preparing to deploy to Iraq. The Adjutant has been briefed by the Brigade Commander to prepare the Deployment Roster and Rear Detachment Personnel Roster. The Adjutant provides you with a list of names of personnel that will be part of the Rear Detachment and will not be deploying. He also hands you a folder with documents that must be processed in eMILPO. The Adjutant informs you that the transactions that you are about to do must reflect on the a clean copy of the AAA-162 so he can provide the copy to the Brigade Commander. He also informs you that the Soldiers that you have completed the transactions on will not be part of the deployed roster and must be checked off from the Extensible Markup Language (XML) File that will be UP-Loaded in to DTAS when the unit arrives in Iraq.

8 Unit Accountability Report (AAA-162)

9 eMILPO Main Menu

10 eMILPO DTAS – SOLDIER SELECTION (1 of 3)

11 eMILPO DTAS – SOLDIER SELECTION (2 of 3)

12 eMILPO DTAS – SOLDIER SELECTION (3 of 3)

13 eMILPO DTAS – DATA EXTRACT

14 eMILPO DTAS – DATA EXTRACT (XML) FILE (1 of 2)

15 eMILPO DTAS – DATA EXTRACT (XML) FILE (2 of 2)

16 EXTENSIBLE MARKUP LANGUAGE (XML) FILE

17 DTAS Mobile System Functions (1 of 2)

18 DTAS Mobile System Functions (2 of 2)

19 People Tab (1 OF 2)

20 People Tab (2 OF 2)

21 Update Location

22 Update Tour Status

23 DTAS Mini-Record

24 Locations Tab

25 Reports Tab (1 of 2)

26 Reports Tab (2 of 2)

27 Management Tab

28 Mass Assign Wizard

29 Select a Source File

30 Select People to Load

31 Select Arrival Date/Time and Operation Data

32 Select Assigned and Physical Location

33 Select Tour Status Data
SHOW SLIDE #13 Select Tour Status Data

34 DTAS Hands-On SITREPs 34

35 See One, Do One Teach One


Download ppt "Employ the Deployed Theater Accountability System (DTAS)"

Similar presentations


Ads by Google