Presentation is loading. Please wait.

Presentation is loading. Please wait.

Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 1 Tomonori USUDA & Telescope Engineering Division Current Status of Subaru Telescope.

Similar presentations


Presentation on theme: "Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 1 Tomonori USUDA & Telescope Engineering Division Current Status of Subaru Telescope."— Presentation transcript:

1 Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 1 Tomonori USUDA & Telescope Engineering Division Current Status of Subaru Telescope

2 Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 2 Contents of our Presentation Current Status & Upgrade plans Weather : Statistics Image Quality : Statistics (Focus AG) Upgrade items: Mirror Re-coating, Useful information, etc. Items in FY2005 (Users Comments) Items in FY2006 (Users Comments)

3 Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 3 Weather & Seeing Statistics (Miyashita et al.) Statistics from 1999 Humidity, Atm pressure, Precipitation, Temperature, Wind, Seeing, Clear sky ratios, etc. Enables to discuss statistically Median Seeing @R&I-band=0.''6 Seeing: September is best & Winter is worst

4 Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 4 Clear Sky Ratio (1999 - 2005) Clear=1, Cirrus=0.5, High RH/Cloudy=0

5 Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 5 Monthly Seeing size (FWHM) 1999 - 2005

6 Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 6 Mirror Re-coating, Useful Informations, etc. Opt-M3 (Al, in October) & IR-M3 (Ag, in December) Successfully done. Down time was 1 week for each. Useful Informations IR Cloud monitor will be updated in January DIMM seeing monitor (under testing) @Cat walk http://www1.subaru.nao.ac.jp/~ura/asms/ Sky monitor Images will be archived with IR Cloud monitor. SkyProbe (new) Under developing Others (SODAR in March, IRMA, etc.)

7 Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 7 Upgrade Items in FY2005 TSC replace: Tests (Feb-May), Operation in June HDS: SV guiding improvement, ADC(orrection) Tests (Feb-May), Operation in June Operation GUI modifications, etc. Upgrade Items in FY2006 M1 Recoating works (3 weeks) in July/August 2006 Replace Local Control Units (design for TCMCU) Software for AO188 @NsIR PIR for FMOS (2006Q3), LLT (2006Q4) Users Comments AG (auto change threshold value, check FWHM, etc.) Non-sidereal tracking (Auto guiding, easy pointing, etc.) MIR (more stable diffraction limited image, etc.)

8 Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 8 Users comments are so important Please continue letting us know your precious comments Our response is too slow, but we are checking them and considering how to improve the system.


Download ppt "Subaru Users Meeting 2005 December 22, 2005 Tomonori Usuda 1 Tomonori USUDA & Telescope Engineering Division Current Status of Subaru Telescope."

Similar presentations


Ads by Google