Presentation is loading. Please wait.

Presentation is loading. Please wait.

The preparation process of ISO 20K certification in outsourcing environment HP ITO Best Shore Slovakia Center. Ing. Ivonne Suarez 26 Feb 2010.

Similar presentations


Presentation on theme: "The preparation process of ISO 20K certification in outsourcing environment HP ITO Best Shore Slovakia Center. Ing. Ivonne Suarez 26 Feb 2010."— Presentation transcript:

1 The preparation process of ISO 20K certification in outsourcing environment
HP ITO Best Shore Slovakia Center. Ing. Ivonne Suarez 26 Feb 2010

2 Global & Regional Delivery Centers
Bratislava, Slovakia (GCS) EAO, Networks, Unix, Wintel, Database, Storage Germany SAP/Database expertise (Boeblingen) Regional Canada Mainframe, Networks (Toronto) Sofia, Bulgaria (GCB) Database, Managed Web, Storage, Unix, Wintel, Collaboration & Messaging, Mainframe Ireland Mainframe (Dublin) USA Non-Stop (Austin) RMC (Houston) Dalian, China GSD services Spain RMC (Barcelona) Manila, The Philippines (GCP) EAO, Managed Web, EAI, Unix, Wintel, EUWM, Database, Storage Bangalore / Chennai, India (GCI) Collaboration & Messaging, Database, Storage, Unix, Wintel, EUWM San Jose, Costa Rica (GCC) Collaboration & Messaging, Database, Managed Web, Unix, Wintel, Storage, Networks, EAO Kuala Lumpur Malaysia (GCM) Networks, Backup, Storage, Unix, Wintel, Database, Managed Web, SAP Brazil RMC (Sao Paulo) 17 November, November, 2018

3 EMEA BestShore Cluster
Understanding the QMS setup ITO DO Organization EMEA BestShore Cluster Best Shore Slovakia More global delivery centers/ Align Process for Whole centers Part of Regional Certification Align with EMEA Quality System Internal Process Records and Evidence Which documentation will be use? How to organize the records and evidence? How to align with the region and globally and fulfilled the ISO20k requirements? 17 November, November, 2018

4 Required documents for ISO20K- QMS
Policies Process Guidelines and Standards Templates and checklist Provide direction to the organization in that area Applicable across the organization Policies are defined for each process area Tasks to be performed in the specified area Covers among others roles and responsibilities, metrics and verification & validation criteria Applicable across the Organization Suggested way of performing the task Covers ‘ how’ to do the task Though not mandatory, can be referred while performing the activity Provide specific instances of process definition and/or implementation Artifacts for use at Service Delivery or Organizational level Form the basis for evidences towards compliance 17 November, November, 2018

5 ISO 20K Slovakia Level 3: Local documents and evidence
QMS MANUAL - POLICIES ITO DO PROCESS AND PROCEDURES ITO DO GUIDELINES, TEMPLATES, REPORTS CENTER SPECIFIC Level 3: Local documents and evidence Level2: Documents align for all the global delivery centers. Level1:Documents from HP Enterprise Services Management Process HP Confidential 17 November 2018

6 Include some part of process needed for ISO20k
Where to start? Include some part of process needed for ISO20k ISO 9000 ISO 27000 ISO 20000

7 What is ISO/IEC 20000? Parts 1 and 2 ISO : 2005 Part 1: Specification ISO : 2005 Part2:Code of Practice Defines requirement for a service provider to deliver managed services of an acceptable quality Minimum requirements Auditable standard, uses the word “shall” Provides guidance and recommendations on how to meet requirements in Part 1 Best Practice, uses the word “should” Guidance to Auditor HP Restricted

8 ISO 20000 Processes Planning & Implementation (4)
Planning New Services (5) Management Systems (3) Management Responsibility , Documentation Requirements Competences Awareness Training Plan Implement Monitor Improve ( Plan… . Do… Check… .. Act…… ) Implementing New or Changed Services Service Delivery Processes (6) Capacity Management Service Continuity & Availability Management Service Level Management Service Reporting Information Security Management Budgeting Accounting for IT Services Control Processes (9) Configuration Management Change Management Release Processes (10) Relationship Processes (7) Resolution Processes (8) Release Management Incident Management Problem Management Business Relationship Supplier Management HP Restricted

9 ITSM Reference Model Framework to manage IT strategy through to daily operations Moves from top left through to top right clock wise– strategic through to operations Multi companies can work in the framework Tool set to support it Have seen 30% reduction in costs due to this Common mind set across all support Service delivery assurance is the Center of the processes and this differs from other process where change management is normally in between service development and deployment Incident, Problem and operations are all in the same quadrant allowing for greater analysis of incidents to look at the root cause 80% of costs are fixed in the way that the service is designed so very important to get this right in a partnership Need to work together in all 4 areas The ITSM reference model is aligned to the ITIL. It allows us to manage IT services with a process oriented approach. When developing a service, we start with understanding the customer, your, needs and planning a service to meet that need through the 2nd quadrant. The service is then developed and tested and when everything is ready, the service is activated and support under Service Operations. To ensure a consistent and stable environment, change is rigorously controlled 17 November, November, 2018

10 Deliverables - Overview
First Phase Second Phase Third Phase End Date Deliverables: 5. Internal Assessment to review consistency 6. Prepare place to upload all information (sharepoint-database) 7. Conduct QMS Training 3. Prepared the documentation Aligned with EMEA Process Aligned with Global Process 4. Prepared evidence (Records and Templates) 8. Internal Audit 9. Pre-assessment 10. Certification Audit. Identified Process Owners (Local and Global) 2.Conduct a GAP Analysis

11 PREPARATION FOR ISO20K (phase 1)
Identified Process Owners (local and Global) Identified questions , requirements for ISO20k Which organizations will be certified? Who is going to provide resources to achieve the certification? 1.Define Scope 2.GAP Analysis Conduct GAP Analysis Analyze Results Prepare a Project Plan to Closed GAPS

12 PREPARATION FOR ISO20K (phase 2)
Define a global strategy to provide missing documentation Alignment global level CLEAN UP!! 3.Prepare Missing Documentation 4.Prepare Evidence , Records, Templates Review documentation, templates, records. Update information, decommissioning to old documentation. Implement new templates of process if needed. Start communication and usage of new QMS. Create channels between local and global owners Create or put in practice Document Management Process Review templates, and records Define the structure QMS

13 PREPARATION FOR ISO20K (phase 3 and 4)
Internal review and Assess Consistency Create QMS database or sharepoint. Conduct QMS training PREPARATION FOR ISO20K (phase 3 and 4) Phase 3 Design the place where all documents, records, links will be placed Closed GAP with regional and global documentation. Planning, execution, reporting, follow up, findings closure Prepare QMS training, identified trainers, training schedule, training records finalization. Internal Audit Pre-Assessment Audit Certification Phase 4

14 Questions?

15 Outcomes that matter.


Download ppt "The preparation process of ISO 20K certification in outsourcing environment HP ITO Best Shore Slovakia Center. Ing. Ivonne Suarez 26 Feb 2010."

Similar presentations


Ads by Google