Download presentation
Presentation is loading. Please wait.
1
SHUTTLE PROCESSING DISCOVER --- DISCOVERY
(Before Flight Activities Rarely Seen By The General Public) DISCOVER --- DISCOVERY
2
External Tank Arrives by Barge from MS
4
Vertical Assembly Building
External Tank Vertical Assembly Building
5
Removing External Tank From Carrier
7
External Tank Enters VAB
8
External Tank in VAB
9
Preparing to Lift the Tank to Vertical
10
Lifting Tank
11
Solid Rockets Are Attached
12
Engines Are Attached To Solids
13
Engines Are Attached To The Shuttle In The Shuttle Processing Facility
17
Shuttle In Sling Ready For Lift In VAB
18
Shuttle Has Been Moved To VAB And And Will Be Attached To External Tank
20
Shuttle is Attached
24
Payload Preparation Room (PPR)
25
Cargo Package For ISS
26
New Module For ISS
27
Payload Ready To Be Moved to The Launch Pad
29
Payload Carrier Leaves PPR
31
Payload Being Moved To Launch Pad
33
Lifting Payload Into Position For Insertion Into Discovery When It Arrives At The Pad
36
Shuttle Discovery Leaves VAB
38
Shuttle & Crawler TRIP: Length--- 3 ½ mi Time hours Launch Pad
40
Crawler Control
42
DISCOVERY ARRIVES AT PAD
46
READY FOR LAUNCH
47
We Have Lift Off
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.