WILLIAM PENN HIGH SCHOOL NEW CASTLE, DE
Existing Project Conditions: Location: New Castle, DE Total Building Size: 2 Floors, 556,200 sq ft Project Cost: Phase I - $6,330,272 Phase II - $2,766,58 Phase III - $3,874,341 Construction Dates: Phase I – June ’02-August ’02 Phase II – June ’03-August ’03 Phase III – June ’04-August ’04 Owner – Colonial School District Architect – Tetra Tech, Inc. MEP Engineers – Furlow Associates General Contractor – Ernest DiSabatino & Sons Mechanical Contractor – I.D. Griffith Electrical Contractor – Creedon Controls Asbestos Abatement Alternatives Schedule Acceleration Temporary Lighting Design Materials: 60 Total 20A Circuit Breakers W Lamps X 2 (Original + 1 Change) 571 Total Lamp Guards 571 Total Pig Tail Sockets 12,000’ Total Romex 1,142 Total Wire Connectors Total Cost Materials & Labor: $71,937 Total Cost Power for Temp Lighting: $7,171 Andrew J. Hickey The Pennsylvania State University Construction Management Option
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.