1 Highlights of the Ethiopian Energy Sector
Workshop on COMESA Renewable Energy Guidelines 7–11 AUGUST, 2017 Chaminuka Lodge, Lusaka, Zambia

2 Contents 1. Introduction 2. Key Policy and Regulatory Issues
3. Key Energy Indicators

3 1. Introduction Country in the horn of Africa
Total area million square km 100 million inhabitants Population growth rate – 2.3% per year Average annual GDP growth rate ~ 11 % Ethiopia

4 1. Introduction… Energy Resources Resource Unit Exploitable Reserve
Exploited Percent Hydropower MW 48,030 ~21% Solar/day kWh/m2 4 - 6 ~0% Wind speed m/s GW 7 at 50m 1,350 ~2.4% Geothermal 10,000 Wood Millions tons 1,120 50% Agricultural waste 15 – 20 30% Natural gas Billions m3 113 0% Coal 96.3 Oil Shale 253

5 1. Introduction… Electricity Institutional framework
Energy institutions affiliated to Ministry of Water, Irrigation and Electricity Ethiopian Energy Authority– regulatory body for electricity and energy efficiency Ethiopian Electric Power– generation, transmission, Ethiopian Electric Utility – distribution, sales and Regional energy bureaus

6 2. Key Policy and Regulatory Issues
Energy Policy Framework Give high priority to development of:- hydropower Wind, geothermal and solar Bio-fuels for transport and household use Exploration for hydrocarbon fuels Energy efficiency and conservation Environmental sustainability Capacity building

7 2. Key Policy and Regulatory Issues…
Recently issued / revised Legal frameworks based on the current national and regional development of energy regulations;- Energy Law Geothermal law PPP law is approved by Council of Ministers and forwarded to House of Parliament for final endorsement.

8 3. Key Energy Indicators

9 The Status Grid Electricity

10 Transmission Distribution Commercial Total
Summary in MW Hydro Wind Geothermal Diesel Total 3814.2 324.18 7.2 86.2 Access Rate Year On-grid Connections (million) On-grid Connections Access Rate Off-Grid Connections Access Rate Total Access Rate 2016 3.6 20% 10% 30% Electricity Loss Transmission Distribution Commercial Total Average loss (%) 5 10 20 Electricity production and Export In 2016 the total electricity production was 10,461GWh, of which 712GWh exported to Sudan, Djibouti and Kenya

11 Electricity Tariff Residential Commercial Industrial Average Average tariff (US ¢) KWh 2.15 – 3.15 3.05 2.73 tariffs haven’t been adjusted since 2006 while the Birr has lost nearly 50% of its value, and EEU consequently is not able to recover the full operating cost through the existing tariff.

12 Power Plants Under Construction
Name of Power Plant (including offgrid renewable energy) Technology Type Capacity (MW) Cost (M) Expected Year of Completion GRED Hydro 6,400 4,000 2020 Genale Dawa III 254 451 2017 Repi Waste-to-Energy power Municipal waste 50 144 Pilot project under construction Hybrid Solar and Biomass 0.5 2.5

13 Planned power Generation Plants
Name of Power Plant (including offgrid renewable energy) Technology Type Capacity (MW) Estimated Cost (M) Status of Feasibility Study Genele Dawa VI Hydro 246 588 Completed Geba I & II 372 572 Halele Werabessa 436 886 Chmoga Yeda I & II " 280 540 koyisha 2160 2503 Dabus 798 740 Wabi Shebel 87 1110

14 Name of Power Plant (including offgrid renewable energy)
Technology Type Capacity (MW) Estimated Cost (M) Status of Feasibility Study Aluto II Geothermal 70 266 Reconnaissance Corbetti Phase I 200 760 Corbetti Phase II " 100 Corbetti Phase III 1140 Itaya Wind 224 Completed Ayisha 420 798 Wind PPs on different potential sites 680 1178 Wind speed measurements Solar PPs on different potential sites solar 800 1440

15 Interconnectors Under Construction
Name of Interconnector Rated Capacity Cost (M) Expected Year of Completion Ethiopia – Kenya 2000 MW 322.7* 2019 *Ethiopian side contribution Planned Interconnector Name of Interconnector) Rated Capacity Cost (M) Expected Year of Completion) Status of Feasibility Study Ethiopia – Sudan 3000 436 2021 completed

16 For further information:-
www. eep.gov.et