Download presentation
Presentation is loading. Please wait.
1
UNDERSTANDING SIX SIGMA: AN OVERVIEW
Submitted By Mr. VINOD NARAYAN PUND HPGD/JL14/1232 SPECIALIZATION: OPERATIONS MANAGEMENT PRIN. L. N. WELINGKAR INSTITUTE OF MANAGEMENT DEVELOPMENT & RESEARCH YEAR OF SUBMISSION: JUNE 2016 11/18/2018
2
…A means to stretch our thinking with respect to quality
What Is Six Sigma? •A term (Greek) used in statistics to represent standard deviation from mean value, an indicator of standard deviation from mean value, an indicator of the degree of variation in a set of a process. •Sigma measures how far a given process deviates from perfection. Higher sigma capability, better performance Measure of Quality Process For Continuous Improvement Enabler for Culture Change …A means to stretch our thinking with respect to quality 11/18/2018
3
The Definition of Six Sigma:
"A systematic and disciplined approach to achieve excellence in all current and new processes with improved customer satisfaction and profitable growth for as main drivers". 11/18/2018
4
TQM/QIT vs. Six Sigma TQM/QIT Six Sigma Open project selection process
Specific project selection process Generic projects Projects linked to the strategic goals F-A-D-E improvement cycle focus - analyse - develop - execute D-M-A-I-C improvement cycle define - measure - analyse - improve - control Tool box – Tools not mandatory Tool box bigger – Tools mandatory QIT facilitators supporting teams facilitator profile - part time Black Belts leading teams high potentials - specified assignment, full time Result oriented Generic improvements Result oriented – Data driven Customer satisfaction / Process improvements 11/18/2018
5
Sometimes 99% is just not good enough!
Measure of Quality Process Capability needs to be Better than you think ! For every 300,000 letters delivered: With 99% With Six 3,000 misdeliveries misdelivery In the game of Cricket: A Three Sigma Batsman ( strike rate of 93.3%) will have atleast 66,800 unscored balls out of every 10,00,000 balls played AND A Six Sigma batsman(strike rate of %) will have atleast 3.4 unscored balls out of every 10,00,000 balls played. Sometimes 99% is just not good enough! 11/18/2018
6
Quality expressed as DPMO ( Defects per Million Opportunities)
Measure of Quality Manufacturing Example – Ring Face Width Lower Specification Limit Upper Specification Limit 6s 6 Sigma Lingo Unit : Each Measurement Defect : Measurement out of Spec Spec Standard Sigma DPMO % Width Deviation Level In Spec Defect Opportunities per Unit : 1 , Quality expressed as DPMO ( Defects per Million Opportunities) , , 11/18/2018
7
Harvesting the Fruits of Six Sigma
World Class; 6 Sigma Wall Can’t be harvested by known methods Design for Six Sigma Sophisticated systematic approach required 5 Sigma Wall ”DMAIC” model, Full time Black Belts Some systematic approach required 4 Sigma Wall FADE / QIT tools / Value Management Det bör här påpekas att olika organisationer har olika strukture för sitt förbättringsarbete. Ju längre upp i trädet man kommer ju mer krävs det av kompetens och struktur i form av projektorganisation. Man skall inte heller glömma de externa resurser som kan behövas för att nå optimalt resultat. Easy to pick 3 Sigma Wall Day to day improvements 11/18/2018
8
MEASURE Measure LSL USL T Where Are We Today ? 11/18/2018 30
9
What Goes Into This Process ?
Analyze M Analyze LSL USL T What Goes Into This Process ? What Are The X’s and How Do They Relate To The Y’s ? 11/18/2018 31
10
How Can I Change The Process?
Improve M Improve LSL USL A T How Can I Change The Process? 11/18/2018 32
11
How Can I Make Sure It Stays Improved?
Control M I LSL USL A Control How Can I Make Sure It Stays Improved? 11/18/2018 33
12
Roles in Six Sigma Black/Green Belts,
Leading teams in getting results through Six Sigma projects. Black Belts are full-time committed and Green Belts part-time Project Sponsor, supports the project leader and is the customer and resource provider to the project. Follow-up the Six Sigma project and leverage the gains Six Sigma Steering group, i.e Management team, responsible for running the Six Sigma programme within the organisation scope. Master Black Belt, Is a specially trained and very experienced Black Belt Provides Black/Green Belt and Champion training and coaches the Belts in the projects. May lead own projects Six Sigma Champion, Group, Division and BU-level Deployment responsibility and the programme process owner within the organisation. Controller, Initial evaluator of the project to define the potential economical gains. Monitor and confirm project results. Process Owner, Is responsible for the design of the common process and decides on any changes of that process. Project Team Members, cross functional, with good business process knowledge. 11/18/2018
13
TOOLS & TECHNIQUES 7QC tools
Check Sheets (collect data to make improvements) Pareto Charts( define problem and frequency) Cause and effect diagram (Identify possible causes Cause and effect diagram (Identify possible causes to solve problem) Histogram (Bar charts of accumulated data to evaluate distribution of data) Scatter diagram (plots many data points and pattern between two variables) Flow Chart (Identify unwanted steps) Control charts (Control limits around mean value) 11/18/2018 33
14
BENEFITS OF SIX SIGMA Generates sustained success
Sets performance goal for everyone Enhances value for customers Accelerates rate of improvement Promotes learning across boundaries Executes strategic change 11/18/2018 33
15
CONCLUSION Six Sigma is methodology used for:
Aligning key business processes to achieve those requirements. Utilizing rigorous data analysis to minimize data variation in those processes. Driving rapid and sustainable improvement to business processes. 11/18/2018 33
16
THANK YOU ! 11/18/2018 33
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.