Download presentation
Presentation is loading. Please wait.
1
ICRF Task Force Summary
Presented by Yijun Lin
2
ICRF Scenarios on C-Mod (I)
this forum
3
ICRF Scenarios on C-Mod (II)
J antenna has never been run at 53 MHz, 60 MHz, and 40 MHz. Only feasible to try them out in long campaigns.
4
New Ideas/Presentations
Y. Lin: ELMs on antenna loading and FFT commissioning (mostly piggy-back) MC and LHCD synergy (J antenna at 50 MHz. Needs LH) ICRF MC and ITB formation and density control (J antenna at 60 MHz) S. Wukitch: ICRF sheaths using marker tiles (78 MHz, normal and reversed field) ICCD for sawtooth control (78 MHz, CD phase) MCCD sawtooth control in monster sawtooth (50 MHz, D(He3), CD phase) M. Porkolab (P. Bonoli presented): 2nd harmonic minority heating (J antenna 78 MHz or MHz. D(H) or D(He3). Low field). C. K. Phillips: Fast wave heating and CD below all IC resonances (40 MHz, high field. Needs LH to boost Te)
5
Open ICRF Mini-Proposals
D(He3) minority heating evaluation (Wukitch, MP390) ICRF on sawtooth behavior (Wukitch, MP380) High power experiment (Wukitch, MP379) MC flow drive (Lin, MP378) Plasma performance (Lin, MP376/388, MP417) MCCD (Parisot, MP356, MP447) CNPA test and calibration (Tang, MP389) Total run time from new ideas: ~10 days Prioritizing meeting: Ranking the ideas/MPs. J-antenna frequencies.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.