Presentation is loading. Please wait.

Presentation is loading. Please wait.

Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for.

Similar presentations


Presentation on theme: "Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for."— Presentation transcript:

1 Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for installation of RFW).

2 Description of RFW Removable Front Window can be removed with the release of 8 latches during nominal payload operations. RFW Installed on Frame RFW Frame

3 RFW IVT/HFIT Removable Front Window (RFW) IVT and HFIT was completed with no issues using the MSG Engineering Unit (EU) at MSFC on 03/31/ Installation procedure used by HFIT & Crew Office representatives. RFW Installed on Frame

4 RFW IVT Installation and Removal Photos
RFW Frame Prior to Installation Front View of Window (latch pins retracted) RFW Frame installed RFW Latch Pin “Engaged/ Sealed” Rear View of Window (latch pins retracted) RFW Latch Pin “Located”


Download ppt "Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for."

Similar presentations


Ads by Google