Presentation is loading. Please wait.

Presentation is loading. Please wait.

REGISTRY INFORMATION SESSION

Similar presentations


Presentation on theme: "REGISTRY INFORMATION SESSION"— Presentation transcript:

1 REGISTRY INFORMATION SESSION
March 2, 2004

2 Agenda Introductions 2. Registry Update 3. EUB Non-compliance Appeals
Hours of Operation Pipeline/Meter Stations Enhancement Initiative Registry Activity levels Provisional Assessments 3. EUB Non-compliance Appeals - Overview 4. IRT Update - Current IRT Focus Items - Did You know? 5. Question & Answer

3 Registry Update

4 Hours of Operation 7:00 a.m. open to 6:30 a.m. open (completed)
8 p.m. close to 9:00 p.m. close (*April 1, 2004, for a three month trial period.) Saturdays: 6:30 am – 9:00 pm (*April 1, 2004, for a three month trial period.) First Monday of each month: Registry closes at 6:00 p.m. for system maintenance Generally first Wednesday of the month: Registry closes at noon for scheduled release implementation. *aligned with the project plan for the Pipeline/Meter Stations enhancement initiative.

5 Pipeline/Meter Stations Enhancement Initiative (Project Plan Update)

6 Registry Activity Levels
The number of page hits for January 04 was 2.8 million, up from 2.6 million the previous month. Service Desk, total calls to date: 37,422

7 Provisional Assessment Trends ($MM)

8 Provisional Assessments – con’t This Month Compared to Last

9 EUB Non-Compliance

10 Chargeable Errors Production Month

11 Total Chargeable Errors

12 Total Chargeable Errors By Type
Error Type Missing Well 334 191 224 124 Metering diff 420 116 188 79 Imbalance 275 125 169 71 Missing Facility 144 81 46 'P' Pending 133 55 52 37 Other 29 12 34 16 Total 1335 580 713 373

13 EUB Non-Compliance Appeals
# Operators Invoiced 150 105 126 97 # Chargeable Errors 1335 580 713 373 $ invoiced $191,000 $90,400 $89,700 $55,700 # Appeals 76 45 51 # Granted 70 38 48 Net $ $113,200 $56,100 $61,700

14 EUB Non-Compliance Appeals
Cause # 1 Registry Issue 27 12 16 Cause # 2 Late Filing 2 4 Cause # 3 Wrong Filing 30 21 15 Cause # 4 Other 17 10 Total Appeals 76 45 51

15 Not Granted Reason for Denial Missing or Wrong volume – same operator
Misuse of AB MC Not responding to an EUB query in a timely manner

16 Appeal Timeline Industry has 15 calendar days to submit an Appeal
January production month – March 11th Late appeals will not be accepted EUB will notify of decision within 10 calendar days from receipt of appeal Decisions can be delayed if EUB queries are not responded to timely

17 Industry Registry Team Update

18 Current IRT Focus Items
Pipeline/Meter Station/Terminal Reporting Changes BC Reporting in the Registry Partner Reporting Preliminary Benefits Leverage List

19 1. PL/MS/TM Reporting Changes
Background TCPL is required to report many “paper” pipelines in order for the Registry to accommodate the large number of meter stations and “auto” population of activities. ATCO also has large files with many meter stations and “auto” population of activities --- requires processing after Registry hours. Volumetric Changes to a single meter station require the entire PL to be resubmitted – results in large amount of processing in order to change one number. Liquid Terminal and Pipeline operators are unable to report dispositions when they are actually in control of the measurement of the product.

20 1. PL/MS/TM Reporting Changes (con’t)
For Gas Pipelines and Meter Stations Reporting done at the MS level versus the PL Transactions will begin at the meter station (MS) and the Registry will autopopulate the Pipeline activity. CSO’s are restricted at the MS to the specific activities (i.e. at a 631 type MS, the CSO can only report receipts). ISC’s will be required at the meter station but the Registry will not autopopulate them where they are not needed (no ISC’s at the PL).

21 1. PL/MS/TM Reporting Changes (con’t)
For Gas Pipelines and Meter Stations Reporting done at the MS level versus the PL Downstream (Field) facilities will no longer report REC from meter stations The CSO will report the MS disposing to the Downstream facility I.e. BT, IF, GP, GS etc.

22 1. PL/MS/TM Reporting Changes (con’t)
For Oil & NGL terminals (TM): The terminal operator is in control of reporting the majority of volumes received at and disposed from the terminal. When two terminals are involved - the receiving terminal is in control and will report the received volume. When a pipeline is involved - the pipeline is in control of reporting both receipts from and dispositions to the terminal.

23 1. PL/MS/TM Reporting Changes (con’t)
For Oil & NGL pipelines (PL): The pipeline operator is in control of reporting both receipts into and dispositions from the pipeline unless there is another pipeline involved. When two pipelines are involved - the receiving pipeline is in control and will report the received volume. Please note: None of the above impacts reporting when the receiving or delivering facility/entity is not reporting in the Registry.

24 1. PL/MS/TM Reporting Changes (con’t)
Tentative Implementation Schedule Task Date Required Complete Validation of MS Subtypes (MS operators) February 28th Facility operators to clean up EUB Non Compliance Items March 31st Registry Development Complete Registry Acceptance Testing April 1 – 30th Pipeline Companies test batch file submission April 15 – May 15th Registry Conversion May 20 – 25th Go Live with new process May 26th

25 1. PL/MS/TM Reporting Changes (con’t)
For more detailed information please refer to the following presentations available on the Registry website: - under Bulletin Board - What’s New PL/MS changes Gas Meeting PL/TM changes Oil Meeting The IRT team will continue to inform Industry regarding this item over the next months.

26 2. BC Reporting in the Registry
BC is interested in participating in the Registry BC participation has been conceptually endorsed by Industry and the Registry Steering Committee. Initial meetings have been held in Calgary & Victoria Over the next several months meetings will be held with Various BC government departments Duke Energy BC producers The stakeholders are working together to develop a business case, which is required before their participation can be approved.

27 3. Partner Reporting Subcommittee of IBC formed to:
Identify and resolve any impediments to the implementation of full partner reporting in the Registry Review monthly deadlines and Industry practices Identify bottlenecks in the monthly processes Recommend “partner reporting” deadlines in order to have information available from the Registry for all stakeholders (upstream operators, owners, etc) when it is needed Validate Registry reports – do they provide all information necessary for partner reporting Recommend partner reporting implementation month

28 3. Partner Reporting (con’t)
Deadlines for reporting to the Registry Subcommittee is in the process of reviewing the monthly work flows and recommending appropriate changes to the monthly reporting deadlines, where applicable. Focusing on having all data available in the Registry when it is needed by stakeholders – eliminate phone calls. Team agreed that allocations could be filed at the same time as volumetrics – the data is available. Operators should not wait until the DOE deadline. Participants are validating impact of deadlines within their own companies – e.g. Does the Marketing dept rely on data from the Registry and require it by a certain time?

29 3. Partner Reporting (con’t)
Registry Reports Reviewed reports to identify minimum reasonable requirements All operated for one month for volumetrics All allocations for one month where BA is named as an owner Looking at feasibility of adding contact information to monthly reports Identified one new report – Working Interest Owner Report

30 3. Partner Reporting (con’t)
A few unresolved items being addressed by the team Inventory exchange/swaps Allocation of NGL’s – what level of detail Storing zeros for streams/owners in allocations Allocation downloads – need an SAFOAF volume download

31 4. Preliminary Benefits – Leverage List
1. Remaining High and Medium Priority Issues Under Review by the IBC/IRT a. Late/Last Minute Submissions b. Well Infrastructure Issues c. Registry Pipeline Split Implementation 2. Performance issues 3. Vendor Issues 4. Training Issues 5. Resolved Items

32 4. Preliminary Benefits – Leverage List (con’t)
1a. Late/Last Minute Submissions IRT has created template letters (Volumetric and Allocation submissions) that can be sent to operators who file at the last minute. cc. Industry Registry Manager. Available through the Service desk. Discussions determined that many companies do not submit data early due to: System constraints (facility must balance first) Production Accountant work process issues such as a desire to complete gas splits first PA reluctance to submit multiple batches for a single facility (server-to-server would help)

33 4. Preliminary Benefits – Leverage List (con’t)
1a. Late/Last Minute Submissions (Continued) The Registry calendar has been adjusted up to June 2004 to allow more time between the gas pipeline split deadline and the EUB volumetric deadline. Updated EUB deadlines are: March 19th April 20th May 20th June 21st

34 4. Preliminary Benefits – Leverage List (con’t)
1a. Late/Last Minute Submissions (Continued) The intent of this extension is provide additional time for you to submit ahead of the deadline It is not intended for all users to submit data later and just move the problem from the 18th to the new deadline The Registry will be monitoring users’ behaviour over the next few months to evaluate how people are using the additional time.

35 4. Preliminary Benefits – Leverage List (con’t)
1b. Well Infrastructure Issues There are a number of Well Infrastructure issues that currently have published workarounds. New Pool code for Commingling Wells Packer/Bridge plug issues EUB is reviewing the known issues and will potentially be making changes to the Registry. Industry is asked to provide information regarding any other Well Infrastructure issues to the Registry Service desk. The IRT will ensure the EUB includes any new issues in its review.

36 4. Preliminary Benefits – Leverage List (con’t)
1c. Registry Pipeline Split Implementation Currently IRT focus is Implementation of Partner Reporting BC reporting Leverage List Further P/L split discussions are planned with pipelines, system vendors and Industry for later in 2004

37 4. Preliminary Benefits – Leverage List (con’t)
2. Performance Issues Few remaining (peak day and “one-off” issues) Performance tuning continues 3. Vendor Issues Many meetings have been held with the vendors and their user groups Most of the original issues raised have been resolved with new vendor releases. There are 4 remaining items. Discussions are ongoing.

38 4. Preliminary Benefits – Leverage List (con’t)
4. Training Issues A number of items remain Currently being reviewed and addressed by IRT & IBC 5. Resolved Items Users are asked to: Review the resolved items Confirm the resolution provided is appropriate Inform the IRT if you don’t agree with the resolution documented Issues with open VI’s are highlighted and tracked

39 DID YOU KNOW?

40 1. Users can open multiple sessions of the Registry at the same time
Log onto the Registry as normal and then log on again. Uses: Can validate well statuses while doing volumetrics Can lookup facility information (status, operator) when querying volumetric or allocations Can query multiple facilities/months at the same time in order to compare data or validate the volumetrics/allocations.

41 2. Sizing for Screen Prints
When doing screen prints you need to adjust your page setup so that items on the right hand side of the screen print properly. There are two different “Page setup” changes that can be used: Change the orientation to landscape or Change all the margins to 0.25 Either one of these changes will ensure all data is printed.

42 3. WIP Cleanup When Querying data users are Saving to WIP this is leaving many items in WIP that require cleanup. Users should submit the data that is saved in WIP or Use the WIP Maintenance screen can be used to delete unnecessary items from WIP.

43 4. First In First Out (FIFO) Daytime Report Processing
Since the Registry went live day time batch processing of files has been in the following sequence: Monthly submission files Warning Reports (EUB Non Compliance & Registry SAF/OAF Ensure Complete) This meant that all submission files must process before creating any of the warning reports. Thus on a deadline day often the reports were not available until the end of the day.

44 4. First In First Out (FIFO) Daytime Report Processing (Continued)
At Industry’s request this will change (approx. March 10th) to be: First in First out for the monthly batch submissions and the warning reports. This means that the warning reports will be available earlier through out the day.

45 5. The Contact Button is Available March 4th
Available on Query screens for Monthly processes (volumetrics, allocations, pipeline splits). Displays information of user that made the submission being queried. BA ID and Name Contact Person Name and Phone number Contact Person Displays Audit information also Created Date and Last Update Date and info

46 6. PURREC/PURDISP PURREC is reported for final sales within the Royalty Network, generally for lease fuel purposes E.g. Gas sold from a Gas Plant to an Oil Battery for fuel. PURREC generates a auto created PURDISP, which is a Royalty Trigger and requires a SAFOAF A new Tip has been published under Monthly Reporting Volumetrics Proper Use of PURREC and PURDISP

47 7. The Proper Use of ALL on SAFOAF Submissions
Concern for Upstream Operators (cascades) Difficult to determine where volumes were delivered to Creates problems in cases where the downstream operator “flips” from ALL to Specific from month to month When is it appropriate to use ALL? When facility operators do not have the information available to report the details of each disposition to a stream/owner level Many midstream operations do not track where the product came from – only who owns it. Some operators use ALL when they have many dispositions, with the same wells/owners E.g. many purchase dispositions of gas for fuel, all supplied by the plant owners

48 7. The Proper Use of ALL on SAFOAF Submissions (con’t)
Facilities Using ALL Query run for production month Identified 32 facilities over 13 operators using ALL in the from/to on a “first level” allocation that creates a cascade 18 of the 32 facilities only have one disposition and should be using a specific from/to s sent to each operator advising them to validate their use of ALL IRT will follow-up with each operator Operators will communicate changes to affected upstream parties prior to making the change

49 8. Distribution Lists are in Production
BA’s named on a Distribution List are entitled to see the details of the DISP’s for the reporting facility/product/destination named Distribution Lists are automatically created when allocations of DISP’s are filed Exception is where ALL is used in the from/to Distribution Lists can also be input The ‘manual’ list automatically rolls forward to subsequent months. Registry is addressing problem where some lists did not get created Registry will create any lists that were not done based on SAFOAF filings from December 3, 2003

50 8. Distribution Lists are in Production (con’t)
How to Utilize the Distribution List If you query Volumetrics for a non-operated facility that you delivered volumes to, you can see the details of where that facility’s dispositions went. Can see the facility id and volume for each disposition where you were named on the distribution list When responding to a Cascade that has ALL in the from/to field, upstream operator can view the disposition details Need to contact the downstream operator if you are not named on the distribution list

51 9. The “Save Report Parameters” makes report requests easier
Users can save the report selection parameters to their desktop Each month, load the saved parameter file to the report request screen, change the production month information, and submit. Can also update requested data – add/remove facilities, operators, owners, etc. Most useful for monthly requests EUB non-compliance requests Ensure Complete requests Monthly Volumetric Activity Report OAF Report Variance Report

52 10. The Allocation Variance Report has changed
Now available in both CSV or PDF versions Users can request the Summary or Details Summary – shows the total volume/energy submitted and the total volume/energy calculated for the selected allocation(s) Details – shows the submitted and calculated volume/energy for each stream/owner on the selected allocation(s) Useful tool in identifying problems Missing wells/owners Possible Crown royalty impacts

53 11. Liquid Injected and Recovered as Part of the Gas Stream
Liquid Volume is shown as a REC at the upstream facility Upstream facility must then report the gas equivalent of the liquid received in order to balance GAS – REC – ABGE The gas equivalent of the liquid is then recovered as part of the gas stream Royalty Trigger implications Contact DOE Gas Royalty Help Desk for a royalty paid stream id to use on the SAFOAF

54 11. Liquid Injected and Recovered as Part of the Gas Stream– Example 1

55 11. Liquid Injected and Recovered as Part of the Gas Stream– Example 1 (con’t)

56 11. Liquid Injected and Recovered as Part of the Gas Stream– Example 2

57 11. Liquid Injected and Recovered as Part of the Gas Stream– Example 2 (con’t)

58 11. Liquid injected & recovered as part of the Gas Stream – Example 3

59 11. Liquid injected & recovered as part of the Gas Stream – Example 3 (con’t)

60 11. Liquid injected & recovered as part of the Gas Stream – Example 3 (con’t)


Download ppt "REGISTRY INFORMATION SESSION"

Similar presentations


Ads by Google