Download presentation
Presentation is loading. Please wait.
1
Lysimeter Study Approach
Simulate landfill disposal of CCA 6 PVC Columns 22 feet high, 1-Foot diameter Natural Precipitation or DI water infiltrates through a cap and creates leachate
2
Disposal Scenarios CCA Monofill
Construction and Demolition (C&D) Landfill Municipal Solid Waste (MSW) Landfill
4
Lysimeters Lysimeter 1 – Untreated wood
Lysimeter 2 – CCA: 50% old, 50% new Lysimeter 3 – Typical C&D mix Lysimeter 4 – C&D w/CCA Lyimeter 5 – MSW w/untreated wood Lysimeter 6 – MSW w/CCA
9
Monitoring Lysimeters began operation on August 28 (Wood, C&D) and September 27, 2001 (MSW) Weekly temperature taken inside the lysimeters at 3 different depths (5, 10, 19 feet from the top of waste) Record volume and characterize gas produced Test gas with Landtec Gem 500 (methane, CO2)
10
Leachate Collection Collect leachate twice monthly and analyze for general water quality parameters and As, Cu, and Cr
12
Preliminary Results Weekly Temp monitoring fluctuates with ambient temps Weekly gas monitoring – methane detected up to 60% in MSW lysimeters Leachate generated from all lysimeters Metals found in Lysimeters w/CCA Lys /28/2001 Lys 4 - 6/25/2002 Lys 6 - 7/17/2002
13
Lysimeter 2 – 100% CCA
14
Lysimeter 4 – C&D w/ 10% CCA
15
Lysimeter 6 – MSW w/ 2% CCA
16
Lysimeter Leachate pH MSW C&D UT Wood CCA
17
Arsenic
18
Chromium
19
Copper
20
Operation Lysimeters will continue operation through spring and summer
DI water added as needed Temp and Gas readings taken weekly Leachate collection twice monthly and continued analysis for general water quality parameters and As, Cu, Cr
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.