Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lysimeter Study Approach

Similar presentations


Presentation on theme: "Lysimeter Study Approach"— Presentation transcript:

1 Lysimeter Study Approach
Simulate landfill disposal of CCA 6 PVC Columns 22 feet high, 1-Foot diameter Natural Precipitation or DI water infiltrates through a cap and creates leachate

2 Disposal Scenarios CCA Monofill
Construction and Demolition (C&D) Landfill Municipal Solid Waste (MSW) Landfill

3

4 Lysimeters Lysimeter 1 – Untreated wood
Lysimeter 2 – CCA: 50% old, 50% new Lysimeter 3 – Typical C&D mix Lysimeter 4 – C&D w/CCA Lyimeter 5 – MSW w/untreated wood Lysimeter 6 – MSW w/CCA

5

6

7

8

9 Monitoring Lysimeters began operation on August 28 (Wood, C&D) and September 27, 2001 (MSW) Weekly temperature taken inside the lysimeters at 3 different depths (5, 10, 19 feet from the top of waste) Record volume and characterize gas produced Test gas with Landtec Gem 500 (methane, CO2)

10 Leachate Collection Collect leachate twice monthly and analyze for general water quality parameters and As, Cu, and Cr

11

12 Preliminary Results Weekly Temp monitoring fluctuates with ambient temps Weekly gas monitoring – methane detected up to 60% in MSW lysimeters Leachate generated from all lysimeters Metals found in Lysimeters w/CCA Lys /28/2001 Lys 4 - 6/25/2002 Lys 6 - 7/17/2002

13 Lysimeter 2 – 100% CCA

14 Lysimeter 4 – C&D w/ 10% CCA

15 Lysimeter 6 – MSW w/ 2% CCA

16 Lysimeter Leachate pH MSW C&D UT Wood CCA

17 Arsenic

18 Chromium

19 Copper

20 Operation Lysimeters will continue operation through spring and summer
DI water added as needed Temp and Gas readings taken weekly Leachate collection twice monthly and continued analysis for general water quality parameters and As, Cu, Cr


Download ppt "Lysimeter Study Approach"

Similar presentations


Ads by Google