Download presentation
Presentation is loading. Please wait.
Published byIda Setiabudi Modified over 6 years ago
1
Tim Bownes Engineering Director Port of Milford Haven Pembrokeshire Employers’ Engagement Project 28th September 2016
2
Why do we support this event?
Core Responsibility Fits with our strategy Greater use of local contractors and suppliers Benefits everyone Focus must always be on safety
3
Port Health & Safety Strategy
Core Responsibility Approval of contractors- safety is fundamental Subsidised independent accreditation scheme The Port uses a wide range of contractors who encounter a wide range of potential risks- consistency and high standards are a requirement CDM Regulations Beginning to use forms of contract which include safety as a KPI
4
Example of a recent project: Pembroke Port Mole
Agenda Essentially a small breakwater in an exposed location Built around WW11 using concrete filled sandbags No foundations Undermined over time Structure continuing to deteriorate
5
Risks Agenda Falls from height
Difficulty of access (people, plant and materials) Risk of collapse (various) Tidal inundation Soft ground Constraints on permanent work limits … plus commercial risks
12
Outcome Careful planning and collaboration ensured:
Right contract conditions Work completed safely Well within budget Within timescale All parties happy
13
Conclusion All parties working together can ensure successful outcomes, even for difficult projects BUT Safety must always be at the top of the agenda
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.