Watershed Task Force meeting
Anclote river West watershed County Administrator – Welcome/Introduce Elected Officials/Staff? – Facilitator Self Introduction Wednesday, March 28, 2018 6:00-8:00 pm
2
Purpose Develop a Watershed Task Force
Increase awareness of the Anclote River West Watershed Cooperate to improve stormwater management system Involve residents in developing potential solutions Provide recommendations to the County Administrator Facilitator
3
Order of business Present a Watershed overview Proposed activities
Review next steps Set timeframe for next meeting Facilitator
4
Anclote river West Watershed Overview
Project Manager – Watershed: “heart” of Pasco County
5
Problem Areas in the Watershed
4 1 2 3 1. Colonial Manor (Jarvis Street) 2. Forest Hills 3. Duck Slough 4. Riverside Village, Park Lake Estates, Veterans Village & Anclote River Estates
6
Proposed ACTIVITIES Forest Hills Drainage Improvements
Duck Slough SCADA Installation Colonial Manor Drainage Improvements Duck Slough BMP 5 A Weir Modification Anclote West/Duck Slough Downstream Conveyance Improvement PACE: ACOE funding for Pinellas Anclote Flood Control Project Project Manager
7
FOREST HILLS WEST Design and permitting complete. Project includes upsized pipes, new pipes, reconstructed inlets and curbing. This project, along with the Forest Hills Outfall project, which must precede it, would lower anticipated flooding levels such that all 14 of the at-risk residential structures in the Forest Hills west basin would be removed from the 100-year floodplain
8
SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA)
Design plans,
9
COLONIAL MANOR (JARVIS STREET)
10
PINELLAS ANCLOTE WEST FLOOD CONTROL PROJECT
ACOE IS THE LEAD FOR THE FEASIBILITY STUDY
11
SWFWMD Cooperative Funding Hazard Mitigation Grant Program (HMGP)
FUNDING APPLICATION Requests SWFWMD Cooperative Funding Hazard Mitigation Grant Program (HMGP) ACOE Colonial Manor (FKA Jarvis) X Pinellas Anclote West Flood Control Project Duck Slough SCADA Forest Hills Outfall Project Manager - Watershed
12
Next Steps Review by Taskforce members Public comment
Date for next Taskforce meeting Facilitator: Discuss compilation of issues. Ask group to consider melding the two meetings.