PLAN Results K. Foraz on behalf of LS2 team

Similar presentations


Presentation on theme: "PLAN Results K. Foraz on behalf of LS2 team"— Presentation transcript:

1 PLAN Results K. Foraz on behalf of LS2 team
Acknowledgement: PLAN group coordinators, M. Pojer

2 K. Foraz - Chamonix workshop 2017
Content Roadmap Version 1 Version 2 26 January 2017 K. Foraz - Chamonix workshop 2017

3 K. Foraz - Chamonix workshop 2017
Content Roadmap Version 1 Version 2 26 January 2017 K. Foraz - Chamonix workshop 2017

4 K. Foraz - Chamonix workshop 2017
(Tentative) Roadmap 2017 Yets LS2 eYETS 2018 2019 2020 Maintenance Conso. & Upgrades LIU Surface W. Civil engineering HL-LHC Run1 Awake Run 2 ? ? EA Renovation CM3 Run HIE-ISOLDE CM4 ? Neut. Platform Inst. Run ? Surface blgs. Many other projects 26 January 2017 K. Foraz - Chamonix workshop 2017

5 Content Roadmap Version 1 Version 2
Many thanks to all PLAN group coordinators For their valuable inputs "Talent wins games, but teamwork and intelligence win championships." Michael Jordan 26 January 2017 K. Foraz - Chamonix workshop 2017

6 K. Foraz - Chamonix workshop 2017
Version 1 - Workflow Groups creates activities, propose scheduling & request contributions Created Groups submit for prioritization Prioritization Plan coordinator prioritizes & schedule activities Resource allocation Groups allocates resources to the activities Group confirms validation of its contribution Under approval Plan coordinator submits activity to final state Approved if Finished Approved Postponed Cancelled 26 January 2017 K. Foraz - Chamonix workshop 2017

7 Version 1 – Status Evolution
30% Same level of resources as during LS1 (with a buffer) Clarification with support groups & Introduction of «approved if» status 26 January 2017 K. Foraz - Chamonix workshop 2017

8 K. Foraz - Chamonix workshop 2017
Version 1 – Final Status 162 Created: activities which were created after February 1st 12 Prioritization: activities for which there is a quality issue never solved by the requestor (despite several solicitations) 33 Resource allocation: activities stuck – waiting for an assessment of the support groups (despite a lot of solicitations) 751 Approved Activities are approved in the defined time window 77 Approved if Approved if issues (missing information, budget..) are clarified in due time with support groups 39 Postponed Activities postponed wrt priorities & unavailability of resources 26 January 2017 K. Foraz - Chamonix workshop 2017

9 Version 1 - Approved if & Postponed
Main reasons Technical information still to clarify / define & inform (please remember you can attach or link documents/slides…) Missing budget Missing resources 26 January 2017 K. Foraz - Chamonix workshop 2017

10 K. Foraz - Chamonix workshop 2017
Approved but…. Requests are approved, but please pay attention to the comments of your supporters ! Hypothesis taken by support groups «Data based on the following hypothesis: 15 dipoles quadrupoles (3 of which include a jumper)” Schedule «Subjected to further evaluation of planning, co-activities and access constraints” Clarification on technical/detailed needs Few requests where support groups will have to be available HSE-SEE, EN-EL mainly 26 January 2017 K. Foraz - Chamonix workshop 2017

11 Version 1 – Detailed Results
In PLAN In EDMS ACC-PM-MR ( ) 26 January 2017 K. Foraz - Chamonix workshop 2017

12 Version 1 – Usefulness of Resources Details
Activities created by TE-VSC Activities created by other groups Courtesy G. Riddone 26 January 2017 K. Foraz - Chamonix workshop 2017

13 K. Foraz - Chamonix workshop 2017
Zoom on LIU Project (1/3) 187 PLAN requests 9 Created 5 Resource Allocation 132 Approved 21 Approved if 8 Finished 12 Cancelled 26 January 2017 K. Foraz - Chamonix workshop 2017

14 K. Foraz - Chamonix workshop 2017
Zoom on LIU Project (2/3) Approved if (1/2) Clarifications to be given to EN-MME PS Longitudinal Damper LIU-SPS RF power upgrade BAF3 New BT vertical bending magnets for PS BOOSTER New BT/BTP Quadrupoles for PS BOOSTER New BTM. BHZ10 magnet for PS BOOSTER New BT.BHZ10 magnet for PS BOOSTER New BHZ MAIN INJ & EXT magnets for PS BOOSTER New BI.BVT 10 magnets for PS BOOSTER LIU-SPS RF power upgrade LSS3 * Clarifications to be given to IT-CS Beam control upgrade *: clarifications to be given to TE-VSC 26 January 2017 K. Foraz - Chamonix workshop 2017

15 K. Foraz - Chamonix workshop 2017
Zoom on LIU Project (3/3) Approved if (2/2) Clarifications to be given to EN-EL Provide high voltage pulsed generators, Electronics & Controls for PSB BI.KSW Supply new converters for PS Injection PI.BSM40, 41, 43 & 44 new Bumper Magnets Supply new converters for SPS TCDI Supply new converters for Booster Ejection Transfer Bending Magnets Supply new converters for Booster Main Magnets (Dipole & Quadrupole) & Trims [POPS- B] Installation of new magnets for 2.0 GeV operations ( 14 units), Including the dismantling of the BTM.BHZ10 magnet into manageable pieces. Installation new LT.BHZ20 (L4 connection) TCDI SPS to LHC transfer line collimator renewal for LIU* *: & BE-ABP 26 January 2017 K. Foraz - Chamonix workshop 2017

16 Version 1 – What can be Improved
Data inputs Doublets & granularity: For projects, PL will from now on enter their requests Still some cleaning to do Workflow Possibility to go a step back Respect of deadlines ! 15/9/15 05/11/15 13/6/16 1/8/16 26 January 2017 K. Foraz - Chamonix workshop 2017

17 K. Foraz - Chamonix workshop 2017
Content Roadmap Version 1 Version 2 26 January 2017 K. Foraz - Chamonix workshop 2017

18 Version 2 – A First Glance
Version to Version 2 Created  Created Resource Allocation  Resource Allocation Under Approval  Under Approval Approved  Approved Approved If  Resource Allocation Postponed  Created Finished Cancelled 26 January 2017 K. Foraz - Chamonix workshop 2017

19 Version 2 – Specific Forms
26 January 2017 K. Foraz - Chamonix workshop 2017

20 K. Foraz - Chamonix workshop 2017
Version 2 - Calendar Save the date : February 8th (10am) – PLAN users meeting «From Version 1 to Version 2» Version 2 – stages (Deadlines) Initialization 31/03/17 Prioritization 08/04/17 Resource allocation 02/06/17 (can start as soon as an activity is created) Final approval 30/06/17 26 January 2017 K. Foraz - Chamonix workshop 2017

21 K. Foraz - Chamonix workshop 2017
"If everyone is moving forward together, then success takes care of itself." --Henry Ford Conclusions Goal of PLAN is to align vision and efforts PLAN version 1 was a difficult exercise, but usual overloaded support groups have a clearer view of the resources needed, Are working on solutions to absorb the current workload (& buffer) Critical points will be reviewed during the LS2C PLAN version 2 will be launched in the coming days, with the goal to refine the LS2 picture 26 January 2017 K. Foraz - Chamonix workshop 2017

22 BACK-UP

23 K. Foraz - Chamonix workshop 2017
Which tool is for what time Months before PLAN A unique repository gathering all main activities for a given period of time committing or not the support groups with a simple approval process Capacity management & projects portfolio analysis Align Vision & Effort Technical approvals Documentation management: layout, EDMS… Scheduling tools: MsProject, Excel (linked with VBA Automation) Planning Infor-EAM IMPACT One single database of intervention data One workflow engine (EDH based) A web tool to collect work intentions, and to plan-schedule-prepare and coordinate all of the activities. Worksite Coordination D day PlanBook … a tentative (see next slide) 26 January 2017 K. Foraz - Chamonix workshop 2017

24 Zoom on HL-LHC Project (1/2)
56 PLAN requests Created 9 Resource allocation 5 Under Approval 2 Approved 31 Approved if 2 Postponed 1 Cancelled 6 26 January 2017 K. Foraz - Chamonix workshop 2017

25 Zoom on HL-LHC Project (2/2)
Approved if 2 TCLD (DS collimator) for P2 (1) (EN-CV, BE-ABP) PSB Finemet RF Systems (2) (EN-MME, BE-ABP) Postponed Beam gas curtain profile monitor (3) (TE-CRG) Please pay attention to provide EN-CV Technical information on due time Please clarify support need with EN-MME Please clarify support need with TE-CRG 26 January 2017 K. Foraz - Chamonix workshop 2017

26 K. Foraz - Chamonix workshop 2017
LHC Experiments 80 PLAN requests Created 19 Prioritization 1 Under Approval 3 Approved 40 Approved if 9 Finished 3 Cancelled 5 26 January 2017 K. Foraz - Chamonix workshop 2017

27 Zoom on LHC Experiments
Approved if I Measure the ALICE cavern network and align detectors components (EN-ACE) (1) I Measure the CMS cavern network and align detectors components (EN-ACE) (1) I Measure the LHCb cavern network and align detectors components (EN-ACE) (1) I Build and install the new detector cooling station for SCiFi - LHCb (2) (EN-EL) I Build and instal the new detector cooling station for RICH 1 & 2 – LHCb (2) (EN-EL) I EN-EL Long distance Optical fibers installation for LHCb (3) ( EN-EL) I ALICE O2 infrastructure (4) (EN-CV) I ALICE fibers (3) (EN-EL) I Upgrade the ventilation system in UX15 (5) (EN-CV) Approved if – discusions to be held between ACE & LHC experiments Please ensure that information to EN-EL is provided in due time Please clarify request with EN-EL Please clarify request with EN-CV Being studied by EN-CV 26 January 2017 K. Foraz - Chamonix workshop 2017

28 K. Foraz - Chamonix workshop 2017
Version 2 - Workflow Postponed Created Created Prioritization Prioritization Resource allocation Under approval Resource allocation Approved if Under approval Finished Cancelled Approved Finished Approved Approved if Postponed Cancelled 26 January 2017 K. Foraz - Chamonix workshop 2017