GTR Class 387 – Great Northern Introduction

Similar presentations


Presentation on theme: "GTR Class 387 – Great Northern Introduction"— Presentation transcript:

1 GTR Class 387 – Great Northern Introduction
6th February Pete Carbery & Simon Green

2 Purpose of Deployment Electrostar deployment on GN
Electrostar deployment on GN key to increased services to Kings Lynn (Frequency & Capacity) Allows 317’s & 321’s to be replaced. Short term substitute for 700’s. Improved Passenger experience (PIS, DDA, Air con etc). Introduction complete for May 2017 YL Staff first - Details of plan cascaded down... Each week something in GTR along with formal briefings. Station travel tracker – excel spreadsheet for stations to London/GTW/BTN HR issued guidance for staff travelling to work – expectation set Links to website so easy access to same information as passengers.

3 Driver Training Plan Considerations.
Classrooms Unit Availability (Static & Dynamic) All Drivers / All Facets of work Multiple Driver Depots Test Train Requirements Bank Holidays Travelling Time Train paths for handling Union Agreements Holiday Period Approx. 370 drivers to train YL Staff first - Details of plan cascaded down... Each week something in GTR along with formal briefings. Station travel tracker – excel spreadsheet for stations to London/GTW/BTN HR issued guidance for staff travelling to work – expectation set Links to website so easy access to same information as passengers. Driver Trainers Training Agreements Driver Release Training Locations Deployment v Competant Drivers

4 Operational Testing. Signal Sighting, Stop Board Positions,
Selective Door Operation, DOO (In Cab Camera Views), Stepping Distance. Passenger Information System YL Staff first - Details of plan cascaded down... Each week something in GTR along with formal briefings. Station travel tracker – excel spreadsheet for stations to London/GTW/BTN HR issued guidance for staff travelling to work – expectation set Links to website so easy access to same information as passengers.

5 Engineering Approval Pantographs BW HSP Mk2
Previously accepted as compatible fitted to class 700 Not compatible fitted to a 387 Mk1 Pans fitted to 3 units to enable Ops testing and driver training Gauging Absolute and Comparative to class 365 Class 365 gauging model rebuilt to modern standards Still not fully resolved YL Staff first - Details of plan cascaded down... Each week something in GTR along with formal briefings. Station travel tracker – excel spreadsheet for stations to London/GTW/BTN HR issued guidance for staff travelling to work – expectation set Links to website so easy access to same information as passengers.

6 Depot Considerations First “Modern” EMU to be maintained at Hornsey
Roof Access Gantry being installed for HVAC maintenance Wheel Drop being added to the wheel lathe Staff training Support for failure analysis and fault finding Warranty team YL Staff first - Details of plan cascaded down... Each week something in GTR along with formal briefings. Station travel tracker – excel spreadsheet for stations to London/GTW/BTN HR issued guidance for staff travelling to work – expectation set Links to website so easy access to same information as passengers.

7 Critical Path Everyone tends to think of new trains projects as building units Critical path for introduction will actually be operational readiness Train Avaialbility Test Paths Driver Release But don’t forget Unions Network Rail Throw curveballs YL Staff first - Details of plan cascaded down... Each week something in GTR along with formal briefings. Station travel tracker – excel spreadsheet for stations to London/GTW/BTN HR issued guidance for staff travelling to work – expectation set Links to website so easy access to same information as passengers.