Tam Valley School Modernization - Phase 1 Summer 2011.

Similar presentations


Presentation on theme: "Tam Valley School Modernization - Phase 1 Summer 2011."— Presentation transcript:

1 Tam Valley School Modernization - Phase 1 Summer 2011

2 Tam Valley Bond Election Project List Safety and Communication Replace outdated fire alarm system Replace outdated clock, bell and paging system American Disabilities Act compliance Food service kitchen compliance Building Systems and Renovation Repair or replace aging electrical system components Upgrade inefficient lighting systems including exterior lighting Upgrade computer wiring and infrastructure Repair or replace aging plumbing system components Repair or replace leaking or deteriorating roofs and skylights Paint interior and exterior of buildings Replace flooring Repair or replace windows, doors, hardware and signage Site Improvements Construct solar ready covered outdoor eating area Restore or resurface deteriorating concrete or blacktop Reconfigure parking lot to improve fire access and traffic flow Upgrade aging electrical and plumbing utility systems Safety and Communication American Disabilities Act compliance Building Systems and Renovation Repair or replace signage Site Improvements Construct solar ready covered outdoor eating area Restore or resurface deteriorating concrete or blacktop Reconfigure parking lot to improve fire access and traffic flow Upgrade aging electrical and plumbing utility systems Tam Valley Phase 2 - Summer 2012 Project List

3 Before After Windows, paint, roof, doors, lights, gutter, landscape, retaining walls, electrical service, parking lot, playground striping

4 Windows, paint, roof, doors, lights, gutter, landscape, retaining walls, electrical service, remove one level of sun screen, maintenance path and asphalt Before After

5 Windows, paint, roof, doors, lights, gutter, landscape, ramp, server room HVAC, water fountain and railings Before After

6 Windows, paint, roof, doors, lights, gutter, landscape, and landings Before After 1960s Addition with storefront

7 Windows, paint, roof, doors, lights, gutter, and remove one level of sun screen Before After

8 Windows, paint, roof, doors, lights, gutter, remove one level of sun screen, remove storage shed, new landings at doors Before After

9 Windows, paint, roof, doors, lights, gutter, remove one level of sun screen, ramp, railings, new landings at doors Before After

10 Windows, paint, lights, asphalt, and ramp surfaces Before After

11 Windows, paint, roof, doors, lights, gutter, ramp and railings Before After

12 Windows, paint, roof, doors, lights, and gutter Before After

13 Windows, paint, roof, doors, lights, gutter, landing at door Before After 1960s Addition with storefront

14 Windows, paint, roof, doors, lights, and gutter Before After

15 Paint, abrasive action floor covering, and non-wax floor covering Before After

16 Paint, abrasive action floor covering, new double door into MPR BeforeAfter

17 Paint, abrasive action floor covering, and non-wax floor covering Before After

18 Paint, non-wax floor covering, cubbies protector to assist seeing impaired Before After

19 Windows, door, paint, abrasive action floor covering, and non-wax floor covering Before After

20 Paint, abrasive action floor covering, and non-wax floor covering Before After

21 Windows, paint, doors, motorized blinds, new fire alarm speaker and bell systems Before After

22 New clock and bell system, wireless access points, and wall mounted short throw projectors Before After

23 Operable windows, ceiling paint, motorized shades, and touch up paint to cabinets Before After Non operable windows

24 Removed all wall mounted televisions and replaced with short throw projectors Before After Wall mounted televisions

25 Replaced all slipper rugs with abrasive actions carpets Before After

26 Phase 1 - windows, paint, roof, doors, gutter, and landings at doors. Phase 2 in summer 2012 will have a new walkway and ramps Before After

27 Phase 1 - windows, paint, roof, doors, gutter, and landings at doors, new bell system. Phase 2 in summer 2012 will have a new walkway and ramps BeforeAfter

28 Moved ball walls, slurry seal and restriped blacktop Before After

29 Paint, roof, doors, lights, gutter, landscape, larger landing under lunch table Before After

30 Windows, paint, roof, doors, lights, gutter, slurry seal and striping Before After

31 Paint, lights, ramp surfaces, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After

32 Paint, lights, water fountain, railing, roofs, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After

33 Paint, lights, roofs, remove railing, new landing, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After

34 Paint, lights, water fountain, railing, roofs, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After

35 Roof, operable skylights, and venting with curb detail Before After

36 Replace all scuppers with gutters, all gutters have screen covers Before After Scuppers

37 All new roofs on main building and modular wing Before After Patched roofs

38 New heater unit and ducts at Admin offices Before After

39 New roof, new windows, and new conduit for data, fire, bell and electrical upgrades Before After

40 Phase 1 - Paint, lights, door hardware. Phase 2 summer 2012, landscape changes BeforeAfter

41 Phase 1 - Remove dumpster enclosure, and new sidewalk. Phase 2 - Parking lot renovation Before After

42 Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings Before After

43 Phase 2 – Summer 2012 Phase 1 – Summer 2011

44