Tam Valley School Modernization - Phase 1 Summer 2011
2
Tam Valley Bond Election Project List Safety and Communication Replace outdated fire alarm system Replace outdated clock, bell and paging system American Disabilities Act compliance Food service kitchen compliance Building Systems and Renovation Repair or replace aging electrical system components Upgrade inefficient lighting systems including exterior lighting Upgrade computer wiring and infrastructure Repair or replace aging plumbing system components Repair or replace leaking or deteriorating roofs and skylights Paint interior and exterior of buildings Replace flooring Repair or replace windows, doors, hardware and signage Site Improvements Construct solar ready covered outdoor eating area Restore or resurface deteriorating concrete or blacktop Reconfigure parking lot to improve fire access and traffic flow Upgrade aging electrical and plumbing utility systems Safety and Communication American Disabilities Act compliance Building Systems and Renovation Repair or replace signage Site Improvements Construct solar ready covered outdoor eating area Restore or resurface deteriorating concrete or blacktop Reconfigure parking lot to improve fire access and traffic flow Upgrade aging electrical and plumbing utility systems Tam Valley Phase 2 - Summer 2012 Project List
3
Before After Windows, paint, roof, doors, lights, gutter, landscape, retaining walls, electrical service, parking lot, playground striping
4
Windows, paint, roof, doors, lights, gutter, landscape, retaining walls, electrical service, remove one level of sun screen, maintenance path and asphalt Before After
5
Windows, paint, roof, doors, lights, gutter, landscape, ramp, server room HVAC, water fountain and railings Before After
6
Windows, paint, roof, doors, lights, gutter, landscape, and landings Before After 1960s Addition with storefront
7
Windows, paint, roof, doors, lights, gutter, and remove one level of sun screen Before After
8
Windows, paint, roof, doors, lights, gutter, remove one level of sun screen, remove storage shed, new landings at doors Before After
9
Windows, paint, roof, doors, lights, gutter, remove one level of sun screen, ramp, railings, new landings at doors Before After
10
Windows, paint, lights, asphalt, and ramp surfaces Before After
11
Windows, paint, roof, doors, lights, gutter, ramp and railings Before After
12
Windows, paint, roof, doors, lights, and gutter Before After
13
Windows, paint, roof, doors, lights, gutter, landing at door Before After 1960s Addition with storefront
14
Windows, paint, roof, doors, lights, and gutter Before After
15
Paint, abrasive action floor covering, and non-wax floor covering Before After
16
Paint, abrasive action floor covering, new double door into MPR BeforeAfter
17
Paint, abrasive action floor covering, and non-wax floor covering Before After
18
Paint, non-wax floor covering, cubbies protector to assist seeing impaired Before After
19
Windows, door, paint, abrasive action floor covering, and non-wax floor covering Before After
20
Paint, abrasive action floor covering, and non-wax floor covering Before After
21
Windows, paint, doors, motorized blinds, new fire alarm speaker and bell systems Before After
22
New clock and bell system, wireless access points, and wall mounted short throw projectors Before After
23
Operable windows, ceiling paint, motorized shades, and touch up paint to cabinets Before After Non operable windows
24
Removed all wall mounted televisions and replaced with short throw projectors Before After Wall mounted televisions
25
Replaced all slipper rugs with abrasive actions carpets Before After
26
Phase 1 - windows, paint, roof, doors, gutter, and landings at doors. Phase 2 in summer 2012 will have a new walkway and ramps Before After
27
Phase 1 - windows, paint, roof, doors, gutter, and landings at doors, new bell system. Phase 2 in summer 2012 will have a new walkway and ramps BeforeAfter
28
Moved ball walls, slurry seal and restriped blacktop Before After
29
Paint, roof, doors, lights, gutter, landscape, larger landing under lunch table Before After
30
Windows, paint, roof, doors, lights, gutter, slurry seal and striping Before After
31
Paint, lights, ramp surfaces, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After
32
Paint, lights, water fountain, railing, roofs, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After
33
Paint, lights, roofs, remove railing, new landing, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After
34
Paint, lights, water fountain, railing, roofs, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After
35
Roof, operable skylights, and venting with curb detail Before After
36
Replace all scuppers with gutters, all gutters have screen covers Before After Scuppers
37
All new roofs on main building and modular wing Before After Patched roofs
38
New heater unit and ducts at Admin offices Before After
39
New roof, new windows, and new conduit for data, fire, bell and electrical upgrades Before After
40
Phase 1 - Paint, lights, door hardware. Phase 2 summer 2012, landscape changes BeforeAfter
41
Phase 1 - Remove dumpster enclosure, and new sidewalk. Phase 2 - Parking lot renovation Before After
42
Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings Before After
43
Phase 2 – Summer 2012 Phase 1 – Summer 2011