Presentation is loading. Please wait.

Presentation is loading. Please wait.

Meadowland Elementary

Similar presentations


Presentation on theme: "Meadowland Elementary"— Presentation transcript:

1 Meadowland Elementary
Renew our Meadowland Elementary Renovation Campaign Plan

2 Welcome! English Welcome Pashto ښه راغلاست Burmese ကြိုဆို
English Welcome Pashto ښه راغلاست Polish Witamy Portuguese bem vinda Punjabi ਸਵਾਗਤ ਹੈ Russian Добро пожаловат Spanish ¡Bienvenido! Telugu స్వాగత Thai ยินดีต้อนรับ Turkish Hoşgeldiniz Urdu خوش آمدید Vietnamese hoan nghênh Bengali স্বাগত Burmese ကြိုဆို Bosnian dobrodošli Cantonese 歡迎 Farsi خوش آمدی French Bienvenue Gujarati આપનું સ્વાગત છે Amharic እንኳን ደህና መጣህ Hindi स्वागत हे Hmong Zoo siab txais tos Hungarian Üdvözöljük Japanese ようこそ Arabic أهلا بك Malayalam സ്വാഗതം

3 Meadowland PTO’s FOCUS
Fun / Be Positive! Organize Communicate Understand Simplify

4 Renew our School! Meadowland PTO 2016 Goal #1
Secure School Board vote for Meadowland renovation in the next couple of years. Please... Renew our School!

5 Outline About Meadowland Elementary Loudoun County assessment
How we scored Recommendations School Picture comparison Meadowland vs Loudoun standards Summary

6 About Meadowland ~470 Students 26 different languages in our homes!
Of 88 total schools*, 41 were built & 20 renovated since 2001 One of ~56 Loudoun elementary schools Only 4 schools are older and unrenovated! Aldie, Banneker, Lincoln, and Hillsboro charter academy Combined attendance of these (2015) was ~497 *Includes AOS and Monroe Tech Info from: 119/FY16-FY20%20School%20Board%20Adopted%20CIP.pdf

7 About our school, cont’d
Sugarland and Meadowland were built with the same design on similar plots Very similar demographics Sugarland ES: Built in 1975 $14M Major renovation in ~2006 (when 31 years old) Meadowland ES: Built in 1979, not renovated when 31, now 37 years old Was slated for renovation but cancelled in order to fund newer schools Info from: 119/FY16-FY20%20School%20Board%20Adopted%20CIP.pdf

8 Interesting Facts Fact #1: The Sugarland renovation provided design and construction plans for many of the needed Meadowland improvements Fact #2: Since 1987, Loudoun has spent $ Billion on new schools & major renovations* Fact #3: Over $108M is planned for new Elementary schools over the next 2 years hen Meadowland was built there were only ~6,000 ES students in the county… …in 2016 there are ~6,000 in each grade *Capital Improvements

9 Meadowland ES

10 Sugarland ES

11 Meadowland ES

12 2015 County School Assessment
Schools evaluated based on a score sheet Current county school standard set top score at 250 50 areas examined, grouped into 4 categories: (25%) Interior Environment, Safety and ADA (15%) Accessibility Plan and Program Adequacy (25%) Site & Exterior Envelope (35%) Mechanical and Electrical Systems Meadowland rated 131 out of 250 points (~52%) Only 3 schools rated lower for the first two areas above Only 6 elementary schools* rated lower overall ( ) *Schools with >250 students

13 Assessment Findings Floor plan is inefficient Rust and peeling paint
Damaged & deteriorating masonry Cracking in walls and floors Sidewalks/curbs failing Kiss-n-ride non-ADA compliant Lighting fixtures not working Floor plan is inefficient No clean circulation loop Roof is ballasted EPDM Opportunity for landscaping Antiquated clock system No automated lighting control Sprinkler covers limited area Using old ozone-depleting refrigerant All classrooms have original, worn casework Chalkboards need conversion to marker boards Color on façade is leaching onto the brick below it Roof ladder does not have a safety pole

14 Assessment Recommendations
Needed to meet full ADA compliance: Stage, Restrooms, Kiss-and-Ride and Signage To meet LCPS facility standards: Dedicate gym space with storage and PE office Add dedicated guidance room Add dedicated toilets in kindergarten, 2nd & special ed classrooms Add acoustical wall panels to cafeteria Clinic requires sink Convert chalkboards to marker boards Add enclosed media center with office Old kiln relocated to art storage Change wall partitions to fixed CMU walls

15 Assessment Recommendations
Additional recommendations: Upgrade lighting systems and power Egress lighting at exit doors should be addressed. Add automated lighting control North wing should be enclosed for security purposes Landscaping Replace corroded bolts for Basketball Backboards Clean/paint exposed steel lintels, repair breezeway deck Brick masonry needs control joints (cracks forming) Cooling tower steel – clean and paint with cold galvanizing paint Address unsightly exposed conduit & raceway in the corridors

16 Summary We have an excellent staff!
We have excellent maintenance staff! Received tape to cover chalkboards this summer, and new asphalt for parking BUT … Meadowland is long overdue for major renovations to meet the county’s standards It is a safety need, a security need, and it is about having equity for all our children

17 It’s Meadowland Turn Please, renew our school…
Most urgent needs ADA Compliance Fire suppression Restroom privacy/repair Make window fire exit possible (enlarge) Sidewalk/curbs (e.g. kiss-n-ride) Outdoor benches (e.g entry) Music room carpet Gym/Cafeteria Hall display space Paint library walls

18 What to do next Sign “Renew our School” Petitions Be heard!
Hand-signed & at change.org Be heard! the school Board personally Volunteer to share your thoughts or support the 15th & 22nd November Budget Meetings Debbie Rose: Brenda Sheridan: Beth Huck:


Download ppt "Meadowland Elementary"

Similar presentations


Ads by Google