Download presentation
Presentation is loading. Please wait.
Published byΘεοδόσιος Πανταζής Modified over 6 years ago
1
16:00 Meeting Fri. June 18 Mon. June 21 Tue. June 22 Wed. June 23
Thurs. June 24 Fri. June 25 Mon. June 28 8a-4p Mech. Team Fasten TEM to Mini-CAL TEM-TKR flex cable mates Setup for Single Bay LPT Gary Setup for Van Der Graaff test Elec.Team, Online Single Bay LPT Gary, Mech.Team Repair Van Der Graaff CAL pedestal & noise calibration Reset CAL thresholds Mech. Team, QA Transport EM2 TEM/TPS and EGSE to bld 33 Inspection of EM2 TEM/TPS Setup for EM2 TEM/TPS bench test EM2 TEM/TPS safe-to-mate test Swap-in EM2 TEM/TPS Set CAL thresholds Test runs Gary, Mech. Team Setup for Van De Graaff Test Test Runs Setup for Van De Graaff data taking Collect test data Offline Van De Graaff data analysis (test runs) Van De Graaff operations Elec.Team Van De Graaff data taking Van De Graaff data analysis Build/install protective cage Ship Mini-Tower assembly to bld 84 ELX lab 4p-8p Cosmic Ray data analysis (test runs) Post-ship Single Bay LPT
2
Action Items Transportation of EM2 TEM/PSU to bld 33 – Eliazar Ortiz
Mechanical inspection of EM2 TEM/PSU connectors and standoff holes – Eliazar Ortiz, Rich Gobin, Tom Borden, Jerry Clinton Proof test of Mini-Tower assembly lift fixture – Dave Kiehl Manufacture Van de Graaff part – Reggie Rogers Repair Van de Graaff – Gary Godfrey Prepare for Van de Graaff operations – Gary Godfrey, Mech. Team Build Mini-Tower assembly cart/cage – Mech. Team Setup operator workstations in room 102 – John Canfield Operator training (Gary, Tune, Larry, Brian, John) for data taking – Online, Offline Check Cosmic Ray test data – Xin Chen Module time-in procedure – Brian Horwitz, Larry Wai Determine schedule for delivery of EM2 EGSE to IFCT – Brian Horwitz Setup for EM2 TEM/PSU bench tests – Eliazar Ortiz EM2 TEM/PSU Safe-to-mate Test – Brian Horwitz Swap-in EM2 TEM/PSU – Eliazar Ortiz Setup for Single Bay LPT – Eliazar Ortiz Execute Single Bay LPT (w/ EM2 TEM/PSU) – Brian Horwitz, John Canfield, Jim Panetta, Lester Miller CAL pedestal and noise calibration (compare w/ EM1) – Brian Horwitz Execute CAL CPT – Brian Horwitz, John Canfield Execute TKR CPT – Brian Horwitz, John Canfield
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.