After Online Configuration is Completed

Similar presentations


Presentation on theme: "After Online Configuration is Completed"— Presentation transcript:

1 After Online Configuration is Completed
Commission

2 Run Tests Press “Network Test” on the MMU
Press “Gateway Test” on the MMU Discovery process is meant for MMU to locate all the optimizers that were assigned to it.

3 Initiate Discovery Press “Discovery” on the MMU
Discovery process is meant for MMU to locate all the optimizers that were assigned to it.

4 Initiate Discovery Press “Discovery” on the MMU
Note: Online configuration must be completed before discovery is run Depending on system size it may take a few hours for all Maximizers to complete discovery.

5 Initiate Discovery Wait for MMU to confirm all modules were found
Depending on system size it may take a few hours for all Maximizers to complete discovery.

6 Double Check Do not leave the site without: Discovering all modules
Checking String voltage Finalizing inverter commissioning Turn off the inverter?

7 And – On Site is Done!

8 Commission Smart Use Tigo Energy’s summary page and check each and every module’s Power Current Voltage

9 Commission Smart Use Tigo Energy’s energy tab to evaluate array production over time and to compare system components Modules Strings Inverters

10 Commission Smart Use Tigo Energy’s advanced tab to graph power, current, and voltage of each module for a selected time period

11 Commission Smart Tigo Energy’s Web Interface provides you with:
Module Level Data DC Voltage & Current Production data Analytical tools System Notifications Also available as iOS & Android Apps

12 Easier O&M Identify and pinpoint system maintenance issues
System notifications Production reports Easier to make decisions on when to service a installation Example Hilton Suburban Solar Farm Located in Victoria Australia Tigo system open to the public online

13 Operations & Maintenance
11/19/2018 Tigo Energy Confidential – Not for Redistribution

14 Operations & Maintenance
11/19/2018 Tigo Energy Confidential – Not for Redistribution

15 Operations & Maintenance
11/19/2018 Tigo Energy Confidential – Not for Redistribution

16 Operations & Maintenance
11/19/2018 Tigo Energy Confidential – Not for Redistribution

17 Operations & Maintenance
11/19/2018 Tigo Energy Confidential – Not for Redistribution

18 Operations & Maintenance
11/19/2018 Tigo Energy Confidential – Not for Redistribution

19 Keys to Success Proper Gateway location
Smart Modules barcodes recorded and assigned to their actual physical location Internet connection

20 Thank You Tigo Customer Care #451 Thank You