Presentation is loading. Please wait.

Presentation is loading. Please wait.

HP-II Workshop on Real-time Hydrological Information Systems

Similar presentations


Presentation on theme: "HP-II Workshop on Real-time Hydrological Information Systems"— Presentation transcript:

1 HP-II Workshop on Real-time Hydrological Information Systems
INTRODUCTION This is the Introduction to the HP-II Workshop on Real-time Hydrological Information Systems, This is presented by Mark Heggli, Meteorologist/Hydrologist and Expert in Real-time Hydrological Information Systems Mark Heggli is the President of Innovative Hydrology. Innovative Hydrology, Inc, is a Consultant to the World Bank Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrological Information Systems Innovative Hydrology, Inc. Consultant to the World Bank

2 Examples that refer to products are intended for illustrative purposes only, and do not imply an endorsement or recommendation of any particular product

3 Workshop Goal and Objectives
GOAL: Develop Expertise with the Technical Aspects of Acquiring and Managing a Hydrological Information System Objectives Understand the Design of a Hydrological Information System Familiarization with Instrumentation, Data Transmission and Data Management Solutions common in an advanced HIS Review Keys to Specifying your Hydrological Information System Understand the pre-bid and Bid Evaluation Phase Equipment Delivery and Acceptance What is involved in Commissioning your Hydrological Information System How to Manage your HIS during the Warranty Period How to Manage and Maintain your HIS after Warranty Period Workshop Goal and Objectives. <click> The Goal of this Workshop Series is to help develop expertise with the technical aspects of acquiring and managing a Hydrological Information System. This Workshop is intended for those agencies in India intending to participate in HP-2 implementation. <click> The objectives of the workshop are as follows <click> at the end. It is expected that upon completion of this workshop, the trainees will be able to successfully plan, procure, and implement a Hydrological Information System under HP-2

4 HIS Implementation Process
Design Tender Tender Preparation Pre-bid meetings Bid Evaluation Bid Award Equipment Delivery Equipment Inspection Commissioning Warranty Operation, Maintenance and Training The HIS Implementation Process involves the following Activities. <c> Design , This includes monitoring network design as well as data center concepts and design <c> Tender

5 Workshop Modules I Introduction 1
Topic I Introduction 1 Essential Elements of a Hydrological Information System 2 Current Real-time HIS Solutions 3 Site Selection & Security 4 Training and Operation & Maintenance 5 Specifications 6 Pre-bid, Bid Evaluation, Inspection and Commissioning 7 Managing Your HIS System –Warranty Period & Beyond