Download presentation
Presentation is loading. Please wait.
1
Report on IRCC9 Key Issues Relating to EAHC
6th EAHC CHC Meeting
2
IRCC9 Paramaribo, Suriname, 12 to 14 June 2017 Participating EAHC MSs:
Japan Malaysia ROK Singapore
3
WENDWG Report Actions from RHCs (deadline: December 2017)
Action 14: Consider making all ENC data available through the RENCs Action 15: Encourage the work of the IHO Community to increase existence of ENC schemes at regional level
4
MSDIWG Report Actions from RHCs
Action 18: Nominate RHC MSDI Ambassadors to promote MSDI and to help MSs to prepare national reports with respect to the status if MSDI
5
CSBWG Report Actions from RHCs (deadline: September 2017)
Action 21: Release datasets/subsets into the public domain via the IHO DCDB Action 22: Consider reviewing data gathering restrictions within the maritime areas of jurisdiction to enable CSB activities to be undertaken Action 23: Support the CSB initiative with positive actions Require research vessels collect bathymetric data for late uploading, when on passage/does not interfere with other research activities
6
GEBCO GC Report Actions from RHCs (deadline: IRCC10)
Action 29: Organize contribution of bathymetric data in shallower coastal areas to GEBCO in order to support the production of higher resolution gridded data products
7
Outcomes of 1st IHO Assembly
Actions from RHCs (deadline: IRCC10) Action 31: EAHC Chair to liaise with Japan: Consult MSs to review the IHO resolution 1/2005 IHO response to Disaster Coordinate with the SWPHC Chair Submit a draft amended version to IRCC Action 32: Consider using SDB and risk assessment methodologies in uncharted/poorly charted areas as a way of developing survey priority areas as part of attracting donor funding Using the project rationale as presented in doc. IRCC9-08C
8
Inputs from MSs and other bodies
Actions from RHCs (deadline: IRCC10) Action 35: Invite MSs to provide technical resources to the DQWG and report back to IRCC Mariners feedback that ENCs were not being populated with CATZOC values
9
Data Gathering and Management (Maximizing the use of Hydrographic Data)
Actions from RHCs Action 37: Support the establishment of UN-GGIM Working Group on Marine Geospatial Information (WG-MGI) Work with national representatives to UN-GGIM to offer interventions in favour of the WG-MGI during next UN-GGIM meeting (June 2017) Action 38: Encourage MSs to attend the next UN-GGIM meeting and MGI side event (July 2017) Action 39: Promote UN-GGIM in region
10
IRCC Work Programme for 2017 – 2018 Summary of Key Issues Relating to EAHC
No. Activity Deadline IRCC9 13/2017 Contribute to the development of C-55 IRCC10 IRCC9 14/2017 Contribute to monitoring and improving the global status of hydrographic surveying IRCC9 15/2017 Contribute to improving the framework of IHO response to marine disasters IRCC9 16/2017 Contribute to the development of MSDI IRCC9 17/2017 Contribute to the development of CSB IRCC9 18/2017 Encourage MSs and representatives of industry and academia to promote and work together to ensure that the best possible use is made of SDB Dec 2017 IRCC9 24/2017 Work to reduce overlaps by applying the WEND Principles in defining approve ENC schemes IRCC9 25/2017 Facilitate resolution of important inconsistencies between paper charts and ENCs and between ENCs from different producers as identified by the RENCs or otherwise IRCC9 26/2017 Encourage MSs in their respective regions to use Risk Assessment methodology to establish Hydrographic Survey priorities
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.