Assessment Team arrives at site Generator leaves staging area

Similar presentations


Presentation on theme: "Assessment Team arrives at site Generator leaves staging area"— Presentation transcript:

1 Assessment Team arrives at site Generator leaves staging area
State Provides Tasking Tasking to Staging Area Assessment complete Data back to staging area Install request to IAP Installation begins Generator installed Installed verified Assessment Team Leaves Tab C (Timeline) to Appendix 4 (Temp Emergency Power to Annex C (Operations) to USACE OPLAN XX-05 USACE support to NRP 1 - 6 hrs 2 - 6 hrs 2 - 6 hrs 1 hr 1 hr 2 hr 1 hr ? ? ? PRT Control PRT Control 249th Control 249th Control 249th Control PRT Control IAP Control IAP Control IAP Control IAP Control