Download presentation
Presentation is loading. Please wait.
Published byAldous Asher Webster Modified over 6 years ago
2
5 pcs ,fasten the tray, please pay attention ,
Screw 1 and 2 are the same. 1 for the body and tray, 2 for body and cover, 3 for body and columns
3
Put on the columns, connect the back wall with columns, each side 5 pcs screws
Screw 1 and 2 are the same. 1 for the body and tray, 2 for body and cover, 3 for body and columns
4
connect the columns with ring
5
5 pcs ,fasten the cover Screw 1 and 2 are the same. 1 for the body and tray, 2 for body and cover, 3 for body and columns
6
Install two fixed glass, put the glass into the plate and fasten
Install two fixed glass, put the glass into the plate and fasten. For first fixed glass, must let one person to hoist the cover Do not tighten screws too hard, grey plastic will break over time
7
Put the small wheel into the upside hole of door glass, and hang the door like this
bigger small
8
bigger small Put the bigger wheels into the downside hole of door glass, put two pcs wheels at the same time
10
Connect hose, 5 to 5, 6 to 6
11
This hose to the top shower
12
The longest metal hose is connect it to the steam generator
But connect like this go out from this hole, then connect steam generator Hose go into this hole
13
Connect with loudspeaker
Connect with fan
14
Loosen the wire of antenna, put it to the top of cover
15
Background light
16
This soft seal install between the glass and column, the same in another side
17
The grey rubber is for replacement, when the original one is broken and leaking. So no need to install this grey rubber. This white rubber can be dropped off ,not need this.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.