Download presentation
Presentation is loading. Please wait.
Published byBlake Blankenship Modified over 6 years ago
1
Presentation to Parliamentary Portfolio Committee on Sport: April 2016
2
Issues that shape the development of the plan
Introduction SAIDS delegation Presentation today Annual plan Issues that shape the development of the plan Budget and performance targets
3
Primary Sources of Funding
National Treasury through the Sport and Recreation SA R21,8 million (2016) R19.1 million (2015) National Lottery Last tranche of grant R3million
4
Factors Influencing Annual Plan
Capacity support to the WADA accredited Laboratory at the University of the Free State More efficient and “smarter” testing in sport Blood profile tests (Athlete Biological Passport) More testing focus on where the doping risks exists Strengthening investigations through partnerships with law enforcement and regulatory bodies (Medicine/Pharmacy) National and global compliance PFMA World Anti-Doping Code
5
Factors Influencing Annual Plan
Anti-doping education Better integration with schools through life orientation curriculum More seminars/outreach activities in non urban areas Increase language offerings beyond English, Afrikaans and Xhosa Working partnerships with sports entities to improve cost efficiencies of education program SASCOC (coaches) Provincial Dept of Sport (coaches/teachers)
6
Doping control and drug testing
Key performance areas Doping control and drug testing Targets decreased by approximately 10% from 2015/16 due to the following: issues experienced with the doping control lab at the University of the Free State which is now under suspension Samples will now be sent Qatar for analysis More efficient and smarter testing (ABP profile) The focus still remains the same – high risk sports Education, Research and Outreach Targets increased due to the following: actual results far exceeding the target for 2015/16 Increase in demand for outreach across the different age groups
7
Key performance areas Finance Prior year audit outcome:
Unqualified with findings on Procurement and supply chain management resulting in Irregular expenditure carried forward from prior years and identified during the 2014/15 audit. Irregular expenditure has since been tabled to the board of directors for condonement and the board approved the condonement Current year: System in place to deter the incurrence of Irregular expenditure i.e. ensure compliance with PFMA and treasury guidelines (clean audit)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.